12.07.2015 Views

Office of Procurement and Materials - WMATA.com

Office of Procurement and Materials - WMATA.com

Office of Procurement and Materials - WMATA.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Washington Metropolitan AreaTransit Authority2011Vendor Fair<strong>Office</strong> <strong>of</strong> <strong>Procurement</strong> <strong>and</strong> <strong>Materials</strong>


Washington Metropolitan AreaTransit AuthorityHeather A. OboraChief <strong>Procurement</strong> <strong>Office</strong>r<strong>Office</strong> <strong>of</strong> <strong>Procurement</strong> & <strong>Materials</strong>


metro forward


a better ride for you• Rehabilitating 100 buses a year for six years– Improves safety– Provides more reliable service– Latest mechanical features– Updated customer amenities• Buying 100 new buses a year– Improve safety <strong>and</strong> reliability– V<strong>and</strong>al-resistant cushioned seats– H<strong>and</strong>hold straps for st<strong>and</strong>ing passenger– Better heating <strong>and</strong> cooling systems– Security <strong>and</strong> rear-view cameras


an easier <strong>com</strong>mute for you• Escalators– 144 overhauls – rebuilding to near new condition;– 9 replacements– Occurring throughout the system on every line• Next Bus– Faster <strong>and</strong> more accurate predictions– Data refreshed more frequently• Better public address systems• Increased security– Additional cameras at station entrances– Closed-circuit television


a better system for you• Replacing 60 miles <strong>of</strong> rail over the nextsix years– Improves reliability <strong>and</strong> performance– Reduces delays– Brings to a state <strong>of</strong> good repair– Smoother ride quality


Washington Metropolitan AreaTransit AuthorityAnoop Kumar<strong>Procurement</strong> ManagerInformation Technology/AdministrativeServices<strong>Office</strong> <strong>of</strong> <strong>Procurement</strong> <strong>of</strong> <strong>Materials</strong>


Supplier Collaboration• Critical for success to both <strong>WMATA</strong> <strong>and</strong> the vendor• Upgrade to a new platform has provided <strong>WMATA</strong> with opportunitiesfor enhanced collaboration• <strong>WMATA</strong> will look to vendors to be able to support punch-outs fromour PeopleS<strong>of</strong>t application to make it easier to order or at leastprovide us with electronic catalogs to internally host the catalog fortargeted <strong>com</strong>modities• <strong>WMATA</strong> also plans on integrating our application with third partymarket places to gain buying efficiencies• Electronic integration <strong>of</strong> documents for the <strong>com</strong>plete procure-to-paycycle


Supplier Collaboration• Electronic Integration through EDI (large volumevendors / transactions)– Purchase Orders– Purchase Order Acknowledgements– Advance Ship Notices– Invoices• Supplier Portal– On-line management <strong>of</strong> Purchase Orders– On-line invoicing– Self-Service functions to query your procure-to-pay transactions


Washington Metropolitan AreaTransit AuthorityR<strong>and</strong>y JudkinsSupervisor, Accounts Payable<strong>Office</strong> <strong>of</strong> Accounting


Vendor Guidelines for SubmittingInvoice PaymentUnderst<strong>and</strong>ing the requirements for submittinginvoices to Accounting for payment processing


Vendor Guidelines for SubmittingInvoice Payment• All invoices can be submitted to <strong>WMATA</strong>’s Accounts Payable via the followingmethods:1) Mail to:Washington Metropolitan Area Transit Authority (<strong>WMATA</strong>)Attn: Accounts Payable600 Fifth Street, NW Washington, DC 200012) Email to:ACCTPAY@wmata.<strong>com</strong>3) Fax to:Accounts Payable - 202-962-1655• Invoices must be on <strong>com</strong>pany’s letter head with name <strong>of</strong> <strong>com</strong>pany, address,invoice number, invoice date, PO number, description <strong>of</strong> work <strong>and</strong> amount due


Vendor Guidelines for SubmittingInvoice PaymentPayments made to Vendors• All payments are made via ACH deposits• Vendors must <strong>com</strong>plete the EFT Vendor Payment EnrollmentForm for banking information• All invoices will be paid within terms <strong>of</strong> contract• All inquires regarding payment status should contact202/962-2220 (A/P Hotline) or send email toACCTPAY@wmata.<strong>com</strong>


Vendor Guidelines for SubmittingInvoice PaymentVendor Changes• Vendor name change, please contact Phillip Barrett Jr, VendorRelations @ 202/962-1408• IRS W-9 form needs to be updated after name change for1099-Misc Reporting purpose, please call 202/962-1408• All changes to the remit-to address, contact person, <strong>and</strong>banking information, please contact Accounts Payable Hotline@ 202/962-2220 or send email to ACCTPAY@wmata.<strong>com</strong>• For other inquiries related to invoices call or email R<strong>and</strong>yJudkins @ 202/962-2223 or rjudkins@wmata.<strong>com</strong>


Washington Metropolitan AreaTransit AuthorityNadir A. Jones/Teairra SwainDBE & Compliance Specialists<strong>Office</strong> <strong>of</strong> <strong>Procurement</strong> <strong>of</strong> <strong>Materials</strong>


Disadvantaged Business Enterprise ProgramOverview <strong>of</strong> <strong>WMATA</strong>’s DBE Program‣ Policy‣ Program Overview‣ Definitions‣ Certification Procedures


Disadvantaged Business Enterprise ProgramPolicyAs per UDOT Federal Guidelines 49 CFR Part 26, the Authority assigns DBEparticipation goals on a contract-by-contract basis on federally fundedconstruction contracts having a total dollar value greater than $500,000 <strong>and</strong>on non-construction procurements (i.e., contracts for services, supplies <strong>and</strong>equipment) having a total value greater than $100,000.The Authority’s DBE goal may be satisfied by utilizing one or more DBEs asjoint venture partners, subcontractors or suppliers <strong>of</strong> goods <strong>and</strong> services <strong>of</strong>any kind or nature, provided that the DBE performs the tasks awarded whenthe contract is executed. DBE firms may also participate as primecontractors.


Disadvantaged Business Enterprise ProgramProgram Overview - Definitions“DBE" means a for-pr<strong>of</strong>it small business concern that is at least 51%owned <strong>and</strong> controlled by one or more individuals who are both socially<strong>and</strong> economically disadvantaged or, in the case <strong>of</strong> a corporation, inwhich 51 percent <strong>of</strong> the stock is owned by one or more individuals; <strong>and</strong>whose management <strong>and</strong> daily business operations are controlled byone or more <strong>of</strong> the socially <strong>and</strong> economically disadvantaged individualswho own it.


Disadvantaged Business Enterprise ProgramProgram Overview - Definitions“Socially <strong>and</strong> Economically Disadvantaged Individual” means anyindividual who is a citizen (or lawfully admitted permanent resident)<strong>of</strong> the United States <strong>and</strong> who is:‣ Asian-Pacific American‣ Black American‣ Hispanic American‣ Native American‣ Sub-Continent Asian‣ Woman‣ Any additional groups whose members are designated associally <strong>and</strong> economically disadvantaged by the SBA, atsuch time as the SBA designation be<strong>com</strong>es effective.


Disadvantaged Business Enterprise Program‣Initial Certification‣On-line access (www.wmata.<strong>com</strong>) Minimum 90-day process Review <strong>and</strong> analyze Additional documents needed, if applicable Schedule on-site visit•Evaluation <strong>com</strong>pleted•Re<strong>com</strong>mendations to the voting members


Disadvantaged Business Enterprise ProgramReciprocity Overview‣Modified Certification Reciprocity Program - (MCRP)Regional Streamlined Certification Processing Minimum 30 day process Commonwealth <strong>of</strong> Virginia, Department <strong>of</strong> MinorityBusiness Enterprise District Department <strong>of</strong> Transportation Maryl<strong>and</strong> Department <strong>of</strong> Transportation Metropolitan Washington Airports Authority


Disadvantaged Business Enterprise ProgramDBE Program <strong>Office</strong>Name Responsibility Phone Fax e-mailDebra Farrar-Dyke DBE Liaison 202/ 962-1168 202/962-2038 dfarrardyke@wmata.<strong>com</strong>Tammy Paige-Sterling DBE Specialist 202/962-2409 202/962-2038 tpsterling@wmata.<strong>com</strong>Nadir Jones DBE Specialist 202/962-1854 202/962-2038 najones@wmata.<strong>com</strong>Teairra Swain DBE Specialist 202/962-6057 202/962-2038 tswain@wmata.<strong>com</strong>


Washington Metropolitan AreaTransit AuthorityNecola Y. ShawCoordinatorSmall Business & Local Preference Program<strong>Office</strong> <strong>of</strong> <strong>Procurement</strong> & <strong>Materials</strong>


Small Business & Local Preference Program<strong>Procurement</strong> Overview Metro meets its customers’ need for goods, services <strong>and</strong> equipment. Vendors provide items <strong>of</strong> satisfactory quality <strong>and</strong> price within a timelydelivery schedule. Metro needs … the “right item, on time <strong>and</strong> at the right price”. We procure approximately $500 million in new purchases to include 200contracts <strong>and</strong> 10,000 purchase orders. Metro is <strong>com</strong>mitted to all businesses to ensure that firms have anopportunity to participate in the procurement process.


Small Business & Local Preference ProgramProgram Overview Metro’s program is designed to enhance opportunities for smallbusinesses in the District <strong>of</strong> Columbia, State <strong>of</strong> Maryl<strong>and</strong> <strong>and</strong> theCommonwealth <strong>of</strong> Virginia. (Manufacturers, Distributors, services,supplies, consultants) Adopted by Metro’s Board in 2005. The program provides preference to qualified small <strong>and</strong> local businesseson non-Federally funded (operating) purchases under $150,000 (simplifiedacquisition process). Qualified <strong>and</strong> registered small businesses <strong>com</strong>peting a


Small Business & Local Preference ProgramHow To Qualify Enhances potential contracting opportunities for small businesses locatedin the District <strong>of</strong> Columbia, the State <strong>of</strong> Maryl<strong>and</strong> <strong>and</strong> the Commonwealth<strong>of</strong> Virginia. Targets <strong>and</strong> gives preference to qualified small business in theprocurement <strong>of</strong> goods <strong>and</strong> services when - $150,000 or less (simplifiedacquisition process). Qualify as a small business – U.S. Small Business Administration Have a place <strong>of</strong> business incorporated in the District <strong>of</strong> Columbia,State <strong>of</strong> Maryl<strong>and</strong> or the Commonwealth <strong>of</strong> Virginia Self-certify your business by signing, notarizing <strong>and</strong> returning the“Declaration <strong>of</strong> Certification” affidavit ( 2 years)


Small Business & Local Preference ProgramSupplier Registration System‣ Go to: www.wmata.<strong>com</strong> Select “Business with Metro” on the bottom right h<strong>and</strong> side <strong>of</strong> the screen Click “<strong>Procurement</strong> <strong>and</strong> Contracting” on the left h<strong>and</strong> side <strong>of</strong> the screen First, print <strong>of</strong>f the list <strong>of</strong> Material Category Codes which you will use duringthe registration Next, print <strong>and</strong> read the New Vendor Registration Manual Once you have gathered all the appropriate data, click “New VendorRegistration” <strong>and</strong> follow the instructions for the eight-step process


Small Business & Local Preference ProgramSmall Business & Local Preference Program‣ Go to: www.wmata.<strong>com</strong> Select “Business with Metro” on the bottom right h<strong>and</strong> side <strong>of</strong> the screen Click Vendor Forms on the left h<strong>and</strong> side <strong>of</strong> the screen Print “Declaration <strong>of</strong> Certification” affidavit for Small & Local Businesses Complete Form with same Material Category Codes you entered into VRS Mail notarized original to Coordinator, Small Business & Local PreferenceProgram


Washington Metropolitan AreaTransit AuthorityPhillip Barrett, Jr.Vendor Relations Representative<strong>Office</strong> <strong>of</strong> <strong>Procurement</strong> & <strong>Materials</strong>


Supplier Registration SystemSupplier Registration InstructionsThere are eight steps. An asterisk (*) indicates a required field. Allrequired fields must be <strong>com</strong>pleted to “activate” a registration.Step 1 <strong>of</strong> 8 (Preliminary Information)Step 2 <strong>of</strong> 8 (User Account Setup)Step 3 <strong>of</strong> 8 (Primary Address)Step 4 <strong>of</strong> 8 (Other Account Address for Invoices)Step 5 <strong>of</strong> 8 (Address Contacts)Step 6 <strong>of</strong> 8 (Taxpayer ID, Principal Place <strong>of</strong> Business, W9, Reps <strong>and</strong>Certs, Insurance Certificates)Step 7 <strong>of</strong> 8 (Categorization Information)Step 8 <strong>of</strong> 8 (Terms <strong>and</strong> conditions)


Supplier Registration SystemStep 1 <strong>of</strong> 8: Preliminary InformationUnder Business with Metro, click on the <strong>Procurement</strong> <strong>and</strong> SolicitationLink. (Note: Before entering “New Vendor Registration” review thelist <strong>of</strong> material category codes for codes appropriate to your<strong>com</strong>pany.)Click on “Vendor Registration” <strong>and</strong> then “New Vendor Registration”.This brings you to Step 1 <strong>of</strong> the supplier registration system.Select whether you will be doing business with <strong>WMATA</strong> as a businessor individual.In question number 2, click on selling goods <strong>and</strong> services.Click the “Next” button.


Supplier Registration SystemStep 2 <strong>of</strong> 8: User Account Set-upType in Company Name exactly as it will be listed in all transactions with theAuthority.User Information section:(a) Enter the information for the contact person(b) Create the permanent USER ID.To add another user, click the “Save <strong>and</strong> Add Another User” button. (Anyadditional designated individual will have the same access as the originalcontact. All new contacts wanting to receive bid requests should includetheir email address.)Click the “Next” button.


Supplier Registration System.Step 3 <strong>of</strong> 8 - Primary AddressAddress information for your main headquarters.When <strong>com</strong>plete click on next button.


Supplier Registration SystemStep 4 <strong>of</strong> 8 - Other Account Address.If the invoice address is different from the primary address entered on theprevious screen the <strong>com</strong>pany should implement Step 4.Whether the Invoice Address Box is checked or not click on next button.Option - If the Invoice Address Box was checked use this screen to input theinvoice address <strong>and</strong> designate a different contact person.Whether the Invoice Address Box is checked or not click on next button.


Supplier Registration System.Step 5 <strong>of</strong> 8 - Address ContactsAfter adding additional contact names for different departments or locations,click on the Next box.


Supplier Registration SystemSTEP 6 <strong>of</strong> 8 - Additional Classification InformationEnter your <strong>com</strong>pany’s Taxpayer Identification Number or register as an individual,using your Social Security Number.Enter the appropriate type <strong>of</strong> ownership .Enter type <strong>of</strong> business <strong>and</strong> specify the year your <strong>com</strong>pany started.Enter business owner’s name <strong>and</strong> position <strong>and</strong> any <strong>com</strong>pany authorized signatories.Enter specific name <strong>of</strong>……….


Supplier Registration SystemSTEP 6 <strong>of</strong> 8 - Additional Classification Information (cont’d)Explain your experience in current business.A <strong>com</strong>pany should <strong>com</strong>plete the First Article <strong>of</strong> Inspection (FAI) as it pertains to yourbusiness.Attach Commercial Liability Insurance Certificate, if required.Enter appropriate additional categories as it applies to your business.Attach any appropriate <strong>WMATA</strong> issued affidavits or certifications (DBE, Small LocalBusiness or Woman-owned enterprise).Attach signed <strong>WMATA</strong> representations <strong>and</strong> certifications. These documents may befound at the Vendor/Business Forms link on <strong>WMATA</strong>’s website.


Supplier Registration SystemStep 7 <strong>of</strong> 8 – Categorization <strong>of</strong> <strong>WMATA</strong>’s Material Category CodesSelection <strong>of</strong> <strong>WMATA</strong>’s Material Category Codes for goods, services or equipment forwhich your <strong>com</strong>pany provides.At least one material category code is required to <strong>com</strong>plete your registration. You areencouraged to review <strong>and</strong> select all <strong>of</strong> the codes that match the capabilities <strong>of</strong> your<strong>com</strong>pany.Click on Next button.


Supplier Registration SystemStep 8 <strong>of</strong> 8 – Terms <strong>and</strong> ConditionsThe final step to Supplier Registration.Click on the box:“I agree to be bound by the following Terms <strong>and</strong> Conditions”Click on the Finish button.Upon successful <strong>com</strong>pletion <strong>of</strong> your registration you will be sent a user id <strong>and</strong>password. The user id <strong>and</strong> password should be used to re-enter the system to set-upyour own new password.If further assistance is needed, contact the Vendor Relations Representativeat: pbarrettjr@wmata.<strong>com</strong> or 202/962-2292.


Washington Metropolitan AreaTransit AuthorityDale FisherManager, Warehousing & Distribution<strong>Office</strong> <strong>of</strong> <strong>Procurement</strong> & <strong>Materials</strong>


Vendor OrientationMetro’s Main Supply Facility8201 Ardwick ArdmoreHyattsville, MD 20785


Washington Metropolitan Area TransitAuthority160,000Number <strong>of</strong> Monthly Work Orders<strong>of</strong>By the numbers1500588Number <strong>of</strong> Escalators Maintained60,000268,000# <strong>of</strong> assets owned <strong>and</strong> managed86Number <strong>of</strong> individual garages, stations, depots within the AuthorityMiles <strong>of</strong> track maintained by Metro23Number <strong>of</strong> Satellite Storerooms


<strong>WMATA</strong>’s Supply ChainDeliverPlanConvertSourceStore


Metro’s Main Supply FacilityThe ability <strong>of</strong> the Washington Metro Transit Authority to continue to operate safe <strong>and</strong>efficiently is directly related to its ability to receive equipment, capital spares, <strong>and</strong>maintenance items in a timely manner.


Storeroom 400FlammableStorageCompressedGas StorageCarousels12 Rotating (Midsize)Bulk Drum ChemicalsShipping DocksCentral Receiving AreaMain Storage(Large Items)DiscrepanciesVertical ShuttlesSmall Items (Bolts/Screws)


Minimum ReceivingRequirementsIn order to ensure a timely<strong>and</strong> efficient experience atMetro’s Main Supply Facility,all paperwork MUST containthe following fields:Any Shipments whicharrive at MSF withoutthis minimuminformation will bedelayedPO ID- <strong>WMATA</strong>’s 10 Digit PO Number0000048519Vendor Name:XYZ SupplyVendor Item Number:Vendor’s Part Number107D718H02<strong>WMATA</strong> Part Number:R18350147<strong>WMATA</strong> Part Description:Cartridge, GBX H.S. BearingsPO Qty:The PO Qty ordered MUST match the POQTY received.


Directions to Metro’s Main Supply FacilityFrom: The South <strong>and</strong> East (301, Hwy 4 Pennsylvania Ave, Hwy 5 Waldorf)Enter the 95/495 North (Towards Baltimore) Continue North on 495/95 to Hwy 50West/50 East. The exit for 50East (Annapolis) <strong>and</strong> 50West (Washington) will be on rightside <strong>of</strong> Beltway.Exit Hwy 50 West (Washington, DC) Once on Hwy 50W take the <strong>of</strong>f ramp <strong>and</strong> stay in theright lane. Look for the 1 st Exit on right. Exit 6 (Sign will say, Metro New Carrollton Station,Garden City Drive)Make a right turn at the yield sign Stay in far left lane (as you would to enter the NewCarrollton Metro Station)Make first left at traffic light (New Carrollton Metro Station) Drive like you are going to Lot3 (Kiss <strong>and</strong> Ride) or metered lot. Drive through short term parking lot (make left at yieldsign). You will be exiting the New Carrollton Metro Station.•At the stop sign, make a right <strong>and</strong> Exit New Carrollton Metro StationOnce you make that right, there will be 3 lanes.Take center lane or Ardwick Ardmore <strong>and</strong> proceed under the overpass <strong>and</strong> Main SupplyBuilding will be first building on the right:8201 Ardwick Ardmore Park in Visitor Parking in front <strong>of</strong> administration building


Street Schematic


Ardwick Ardmore RdMSF Location DetailPennsy Road<strong>WMATA</strong>CarmenTurnerFacilityNew CarrolltonMetro Station


Washington Metropolitan AreaTransit AuthorityKerry HillManager (Acting)<strong>Office</strong> <strong>of</strong> Quality Assurance & Warranty


Washington Metropolitan AreaTransit AuthorityFirst Article InspectionAn Explanation <strong>of</strong> the FAI Process


FAI Procedure - Purpose• This procedure is to define the process for evaluating<strong>and</strong> approving part(s)/<strong>com</strong>ponent(s) used to maintain<strong>and</strong>/or enhance the Metro rail system while conformingto the Engineering approved drawings/specifications.• Additionally this process will provide <strong>WMATA</strong> with aconsistent approach enforcing <strong>com</strong>pliance withengineering <strong>and</strong> design requirements prior topart/<strong>com</strong>ponent approval for procurement <strong>and</strong>/or use.


FAI Procedure - Policy• FAI can be initiated by the followingdepartments:– CENV to gain approval for an alternate source <strong>of</strong>Supply– PRMT can request a FAI to qualify a new supplierto supply a previously approved partOFFICE OF QUALITY ASSURANCE AND WARRANTYFIRST ARTICLE INSPECTION (FAI)REQUEST FORMRequestor's Information:<strong>Office</strong>: Name: Date:Part / Component InformationNew Part to <strong>WMATA</strong>? YES NONew Supplier for anexisting part?YESNOPart Description:<strong>WMATA</strong> part number:Supplier's part number:Is a MSDS required? YES NONote: Original parts/<strong>com</strong>ponents provided by anOEM are granted FAI approved status bydefault, unless the OEM deviates from theoriginal design approved by the CE <strong>of</strong>fice.Supplier InformationSupplier's Name:Supplier Address:Contact Person: Phone #:E-mail (if available):


FAI Procedure – QAAW Responsibility• Overall control <strong>and</strong> <strong>com</strong>pliance enforcement <strong>of</strong> the TIESFirst Article procedure• Completing FAI reviews <strong>and</strong> following the process asdescribed <strong>and</strong> approved• Approving FAI Packages• Communicating FAI status to requestors <strong>and</strong> users (CE,PRMT, etc.)


FAI Procedure – CENV Responsibility• Establishing the part/<strong>com</strong>ponent Design, Specifications<strong>and</strong> Inspection Criteria.• Providing a <strong>com</strong>plete FAI package to QAAW to be usedto ac<strong>com</strong>plish the FAI.• Providing the Conformed Contract Specification toQAAW to utilize for product <strong>com</strong>pliance verification.• Establish initial contact with potential supplier, definedesign <strong>and</strong> assemble a <strong>com</strong>plete FAI package.


Washington Metropolitan AreaTransit AuthorityWhen is a FAI Required?


A FAI is required for:• New supplier• New part/<strong>com</strong>ponent• Changes in production/manufacturing process that affectsform, fit function or design characteristics <strong>of</strong> thepart/<strong>com</strong>ponent• Changes <strong>of</strong> raw material used to produce/manufacture thepart/<strong>com</strong>ponent, when the change might affect fit, functionor design characteristics• Drawing changes that will add, remove or change:• Test requirements• Dimensional characteristics that will affect fit orfunction• Bill <strong>of</strong> materialThe FAI will verify <strong>com</strong>ponents <strong>com</strong>pliance with the design <strong>and</strong> engineering requirements. The FAI shall establish the quality <strong>of</strong> workmanship (including inspection acceptance criteria, ifapplicable) for the balance <strong>of</strong> like <strong>com</strong>ponents.


When will a FAI not be conducted ?• The FAI will not be conducted for <strong>com</strong>ponents/parts procuredfrom unapproved supplier, these <strong>com</strong>ponents /parts will beh<strong>and</strong>led as nonconforming material through the QAAW MDRprocess.• The FAI will not be conducted until the design drawings orspecification <strong>of</strong> the article have been approved. Ifconditionally approved drawings are used, the Authority'sconditions for approval shall be satisfied prior to authorization forthe first shipment.


Washington Metropolitan AreaTransit AuthorityFAI Process


The FAI Package shall include thefollowing items:• Drawing set to the approved revision level• Dimensional inspection results (all Key Product Characteristicsmust be listed)Note: Dimensional KPC’s are those that affect fit, form &function. For Parts / <strong>com</strong>ponents, the dimensional reportsshall include a minimum <strong>of</strong> ten (10) samples for partspurchased in volume.


The FAI Package shall include the following items:• For Parts/Components:– Material test that certifies the part meets the materialspecifications <strong>and</strong> applicable industry st<strong>and</strong>ards.– The ten (10) samples used for the dimensional inspections shallbe submitted (when applicable)• For Assemblies/Subassemblies:– Test documentation that supports <strong>com</strong>pliance with designspecifications.Note: Inspection records used to control <strong>and</strong> accept inprocesswork shall be available upon request.– Surface Finish Acceptance Criteria (as applicable)– Material Safety Data Sheets (MSDS) (as applicable)– Packaging St<strong>and</strong>ards (as applicable) (at minimum have a letterdefining shipping / packaging st<strong>and</strong>ard for that product)• Article identification st<strong>and</strong>ard. (how thesupplier identifies its product <strong>and</strong> controlsfuture revisions /field modifications)


Washington Metropolitan AreaTransit AuthorityReview <strong>and</strong> Disposition


(if applicable)(Heavy Repair, Running Maint enance, Illust rat ed Part s Cat alog)To (Supplier): ___________________________________________Supplier’s Number_______________Supplier Contact Person: _________________________________ Phone: _________________________Supplier Part Number: ________________________ <strong>WMATA</strong> Part Number: _______________________Part Description: _______________________________________________________________________After <strong>com</strong>pleting the review <strong>of</strong> the documentation submitted for the item described above, the <strong>Office</strong> <strong>of</strong>Quality Assurance <strong>and</strong> Warranty determined that the Supplier has <strong>com</strong>plied with the First ArticleInspection requirements <strong>and</strong> that the samples submitted <strong>com</strong>ply with engineering specifications.This certificate validates the Supplier as an Approved Supplier only for the part listed above <strong>and</strong> as longas the Supplier manufacturing process <strong>and</strong> material remain unchanged. The Supplier is responsible fornotifying the Authority <strong>of</strong> any changes in materials <strong>and</strong> or manufacturing process affecting the partlisted above.QAAW Representative: __________________________________________ Date: _________________Phone: __________________________________To (Supplier): ___________________________________________Supplier’s Number_______________Supplier Contact Person: _________________________________ Phone: ________________________Supplier Part Number: ________________________ <strong>WMATA</strong> Part Number: _______________________Part Description: _______________________________________________________________________After <strong>com</strong>pleting the review <strong>of</strong> the documentation submitted for the item described above, the <strong>Office</strong> <strong>of</strong>Quality Assurance <strong>and</strong> Warranty determined that the Supplier failed to <strong>com</strong>ply with the First ArticleInspection requirements <strong>and</strong> that the Supplier request to be approved as a supplier for the part listedabove HAS BEEN DENIED.Reasons for Rejection:_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Please provide any additional information that can correct the discrepancies listed above.QAAW Representative: __________________________________________ Date: _________________Phone: __________________________________DATE 9/16/2010OFFICE OF QUALITY ASSURANCE AND WARRANTYFIRST ARTICLE INSPECTION (FAI)REPORTPage 1 <strong>of</strong> 1PROGRAM 2K3K CONTRACT No. FQ1066 (RFP No. FQ10066/FRV) conformedSUPPLIERKNORR AIR BRAKE CORPORATIONFAI LOCATION KNORR AIR BRAKE CORP, 861 Baltimore Boulevard, Westminster, MD 21157EQUIPMENT IDENTIFICATION Oil-less Air Supply Unit Type: VV120T P/N 809848/1<strong>WMATA</strong> PART NUMBERAndy LongJayne BowersoxJohn JeffasPaul AkinsAllan BosleyJan BeaverKeith MutschlerMike DiNataleKerry HillWallace DentDaryl GreenNAME(Please Print)KNORRKNORRKNORRKNORRKNORRKNORRKNORR<strong>WMATA</strong><strong>WMATA</strong><strong>WMATA</strong><strong>WMATA</strong>ATTENDEESCOMPANYSIGNATURESee original sheet for signatures“ ““ ““ ““ ““ ““ ““ ““ ““ ““ “DateFirst Article InspectionNubmer(QAAW Yr-xxx)DATEPROGRAMSUPPLIERFAI LOCATIONEQUIPMENT IDENTIFICATION<strong>WMATA</strong> PART NUMBERNAME(Please Print)8/23/2010 QAAW2010-001 ETP 190386 R59-25-02958/23/2010 QAAW2010-001 ETP 190386 R59-25-02968/23/2010 QAAW2010-001 ETP 190386 R59-25-02978/23/2010 QAAW2010-001 ETP 190386 R59-25-02988/23/2010 QAAW2010-001 ETP 190386 R59-25-02998/23/2010 QAAW2010-001 ETP 190386 R59-25-03008/23/2010 QAAW2010-001 ETP 190386 R59-25-03019/27/2010 QAAW2010-002 P.O. 41414 B18-32-5004To (Supplier): KNORR AIR BRAKE CORPORATION Supplier’s Number_______________Supplier Contact Person: Jayne Bowersox Phone: 410-875-1253Supplier Part Number: 809848/1Part Description: Oil-less Air Supply Unit Type: VV120T<strong>WMATA</strong> Part Number: _______________________Reason(EMI, ETP, ER, IIUR, etc.)After <strong>com</strong>pleting the review <strong>of</strong> the documentation submitted for the item described above, the <strong>Office</strong> <strong>of</strong>Quality Assurance <strong>and</strong> Warranty determined that the Supplier has <strong>com</strong>plied with the First ArticleInspection requirements <strong>and</strong> that the samples submitted <strong>com</strong>ply with engineering specifications.This certificate validates the Supplier as an Approved Supplier only for the part listed above <strong>and</strong> as longas the Supplier manufacturing process <strong>and</strong> material remain unchanged. The Supplier is responsible fornotifying the Authority <strong>of</strong> any changes in materials <strong>and</strong> or manufacturing process affecting the partlisted above.QAAW Representative: __________________________________________ Date: _________________Phone: __________________________________OFFICE OF QUALITY ASSURANCE AND WARRANTYFIRST ARTICLE INSPECTION (FAI)REPORTCONTRACT No.COMPANY<strong>WMATA</strong> Part Number Supplier / contact info Supplier Part NumberEaton Corp, 7451 CocaCola Drive Suite B,Hanover MD 21076Rich Pietryka301 621-6711RichardSPietryka@eaton.<strong>com</strong>Eaton Corp, 7451 CocaCola Drive Suite B,Hanover MD 21076Rich Pietryka301 621-6711RichardSPietryka@eaton.<strong>com</strong>Eaton Corp, 7451 CocaCola Drive Suite B,Hanover MD 21076Rich Pietryka 301621-6711RichardSPietryka@eaton.<strong>com</strong>Eaton Corp, 7451 CocaCola Drive Suite B,Hanover MD 21076Rich Pietryka301 621-6711RichardSPietryka@eaton.<strong>com</strong>Eaton Corp, 7451 CocaCola Drive Suite B,Hanover MD 21076Rich Pietryka301 621-6711RichardSPietryka@eaton.<strong>com</strong>Eaton Corp, 7451 CocaCola Drive Suite B,Hanover MD 21076Rich Pietryka301 621-6711RichardSPietryka@eaton.<strong>com</strong>Eaton Corp, 7451 CocaCola Drive Suite B,Hanover MD 21076Rich Pietryka301 621-6711RichardSPietryka@eaton.<strong>com</strong>Metro Mfg. & Supply Inc.524 N. Providence RoadMedia PA 19063Tony Trunk610-891-1899sales@metromfginc.<strong>com</strong>CH HFDDC3005VD01CH HFDDC3005VD01-S020315CH HFDDC3010VD01-S020315CH HFDDC3015VD01CH HFDDC3015VD01-S020315CH HFDDC3030VD01-S020315CH HFDDC3040VD01SIGNATUREPage 1 <strong>of</strong> 1TIES/QAAW First Article Inspection LogFirst Article InspectionDescription5A Circuit Breaker,750Vdc5A Shunt Trip Circuit Breaker,750Vdc10A Shunt Trip Circuit Breaker,750Vdc15A Circuit Breaker,750Vdc15A Shunt Trip Circuit Breaker,750Vdc30A Shunt Trip Circuit Breaker,750Vdc40A Circuit Breaker,750VdcDrawing Number / Revison(list bo th WM A T A & M F G if available)<strong>WMATA</strong> DWGWDB000128-A rev AEatonTechnical DataTD01203013E Efffective Feb 2010<strong>WMATA</strong> DWGWDB000128-A rev AEatonTechnical DataTD01203013E Efffective Feb 2010<strong>WMATA</strong> DWGWDB000128-A rev AEatonTechnical DataTD01203013E Efffective Feb 2010<strong>WMATA</strong> DWGWDB000128-A rev AEatonTechnical DataTD01203013E Efffective Feb 2010<strong>WMATA</strong> DWGWDB000128-A rev AEatonTechnical DataTD01203013E Efffective Feb 2010<strong>WMATA</strong> DWGWDB000128-A rev AEatonTechnical DataTD01203013E Efffective Feb 2010<strong>WMATA</strong> DWGWDB000128-A rev AEatonTechnical DataTD01203013E Efffective Feb 2010Sample Breda Brake Disc Bolt 910429 Rev 4Process for Review & Disposition:• QAAW will review the FAI to verify <strong>com</strong>pliance withthe above requirements.• QAAW representative shall <strong>com</strong>plete the FAI CheckList Sheet <strong>and</strong> supporting FAI Report Record.• QAAW will provide disposition as follows:• Passed FAI:• QAAW <strong>com</strong>pletes the “FAI Certificate <strong>of</strong>Compliance” form.• QAAW uploads FAI package information to thedata base in Documentum system.• QAAW notifies the Supplier, CE <strong>and</strong> PRMT byproviding a copy <strong>of</strong> the “FAI Certificate <strong>of</strong>Compliance”.• QAAW must document the disposition in the FAIStatus Matrix.• Failed FAI:• QAAW <strong>com</strong>pletes the “FAI Not ApproveNotification” form.• QAAW notifies the Supplier, CE <strong>and</strong> PRMT byproviding a copy <strong>of</strong> the “FAI Not ApprovedNotification”.• QAAW must document the disposition in the FAIStatus matrix.Supplier:Description:Supplier part number:Documents/Items requiredApproved drawings <strong>and</strong> to the correctrev levelDimensional test resultsMaterial test resultsMaterial Safety Data Sheet (If applicable)Material samplesTest documents (for assemblies)Surface Finish Acceptance CriteriaPackaging st<strong>and</strong>ards (If applicable)Article identification St<strong>and</strong>ardsMaintenace InstructionsWarrantyElectronic Package for FilesOtherQAAW Representative:Phone:OFFICE OF QUALITY ASSURANCE AND WARRANTYFIRST ARTICLE INSPECTION (FAI)CHECK SHEETYESDate:<strong>WMATA</strong> part number:NOCommentsWashington Metropolitan Area Transit AuthorityFirst Article InspectionCertificate <strong>of</strong> ComplianceWashington Metropolitan Area Transit AuthorityFirst Article InspectionNot Approved NotificationWashington Metropolitan Area Transit AuthorityFirst Article InspectionCertificate <strong>of</strong> ComplianceATTENDEES


Washington Metropolitan AreaTransit AuthorityQuestions & Answers


Washington Metropolitan Area Transit AuthorityPoints <strong>of</strong> ContactHeather Obora Chief <strong>Procurement</strong> <strong>Office</strong>r 202/962-1579 hobora@wmata.<strong>com</strong>Li (Jessie) Li-Tien Accounts Payable Manager 202/962-2223 lli@wmata.<strong>com</strong>Debra Farrar-Dyke Disadvantaged Business 202/961-1168 dfarrardyke@wmata.<strong>com</strong>Enterprise ProgramNecola Shaw Coordinator, Small Business 202/962-2475 nshaw@wmata.<strong>com</strong>& Local Preference ProgramPhillip Barrett, Jr. Vendor Relations 202/962-2292 pbarrettjr@wmata.<strong>com</strong>RepresentativeGary Griebel Supervisor/Supplier Mgmt 202/962-1314 ggriebel@wmata.<strong>com</strong>Dale Fisher Manager, Warehousing <strong>and</strong> 202/962-5512 dfisher@wmata.<strong>com</strong>DistributionKerry Hill Manager (Acting), Quality 301/955-2185 kehill@wmata.<strong>com</strong>Assurance <strong>and</strong> Warranty

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!