12.07.2015 Views

Sorsogon City Terminal Climate Change Project Report

Sorsogon City Terminal Climate Change Project Report

Sorsogon City Terminal Climate Change Project Report

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

process” in site selection considering that the project intends to “showcase or demonstrate” specificdoable actions that could lay good foundations for scaling-up. This exercise helped the citygovernment to identify “demonstration sites” without potential bias that may come from personalstakes and pressures. A complete report on the site selection process and the survey results is found onAnnex I-E and F, respectively.2.7 Design and Implementation of Quick-Wins/Demonstration <strong>Project</strong>s (Initial Local <strong>Climate</strong> <strong>Change</strong>Action Plan)From the agreed focus areas and proposed quick wins during the <strong>City</strong> Consultation, the IWGs based ontheir further research identified priority actions using an asset-based or capacity-based approach indevelopment planning. Prioritized ‘quick-win actions’ were identified given its prospects of doability,effectivity, and impact. The quick-wins identified are presented in Figure 3 below. These are believedto be actions that could be done over the short term with highest impact towards achieving the city’sgoal towards CC resilience and responsiveness whilst ensuring sustainable urbanization.Figure 3The city government has developed a complete design and plan for implementation of this “quick wins”.These are likewise considered as the city government’s demonstration projects for showcasing climateresilient urban coastal settlements in view of the MDGF 1656 project component. The completeproject design for implementing actions is found in Annex I-H.At the end of implementing the above projects, 5 vulnerable communities were benefitted and thecompetency of the local government was increased. Details of the results are presented in the nextsection of this report.<strong>Terminal</strong> <strong>Report</strong> – <strong>Climate</strong> <strong>Change</strong> <strong>Project</strong> – <strong>Sorsogon</strong> <strong>City</strong>11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!