12.07.2015 Views

Sorsogon City Terminal Climate Change Project Report

Sorsogon City Terminal Climate Change Project Report

Sorsogon City Terminal Climate Change Project Report

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

) Creation of local policy for the conversion of two-stroke tricycle engines into moreefficient and emission-reducing engines. (e.g. 4-stroke engines)Demo projects were based on the Greenhouse Gas (GHG)Profiling data specified in the <strong>City</strong> Vulnerability & AdaptationAssessment (V&AA). The Demo <strong>Project</strong>s were designed toreduce energy consumption of the local energy andtransportation sectors for the purpose of lowering <strong>City</strong> GHGemissions and contribute in the mitigation of <strong>Climate</strong> <strong>Change</strong>impacts, starting first in the public buildings and streets in fivepilot barangays and tricycles operating within the <strong>City</strong>. This isdone by using energy-efficient lightings and engines whichreduce energy consumption without sacrificing energy-use. Theresulting outputs of the IWG Environment are:Installed LED Light in Brgy. Talisaya) Printed IEC materials (posters and fan) on climate change mitigation;b) Broadcasting of Radio and TV infomercials on climate change;c) Pilot Barangays with increased knowledge on CC responsive and energy use;d) Local policy on energy-efficient lightings;e) Local policy on the conversion of two-stroke engine tricycles into more energy efficientand emission-reducing engines.Environmental Management Demo <strong>Project</strong> and CC Orientation forthe Barangay and Transport SectorAn orientation seminar regarding theEnvironmental Demo <strong>Project</strong> was conductedon May 25, 2011 and was attended by a totalof 46 persons with representatives comingfrom the 5 pilot barangays as well as tricyclesdrivers and operators. Speakers from the <strong>City</strong>Government, DENR and EMB were invited togive lectures on <strong>Climate</strong> <strong>Change</strong> and thePhilippine Clean Air Act (RA 8749).To reinforce the knowledge of barangay officialson climate change adaptation and mitigation, total of 1000 pcs of flyers and 500 pcs of posterscontaining basic information on the demo project were printed. Benefits and advantages of theLight Emitting Diode (LED) lamps over CFL and incandescent lighting fixtures were included in the IECmaterials. Audio and video presentation for radio and TV broadcasts were also created enlisting thetechnical expertise of AITV 5.Executive Order (E.O.) No. 11 (Annex II-F) was signed by the Mayor directing the replacement ofincandescent and CFL Streetlights and other public infrastructures with LED lights. Likewise E.O. 16(Annex II-G) was passed integrating climate change in the non-formal curricula of city secondaryschools.6.4 DISASTER RISK REDUCTION DEMO PROJECTThe DRR demo project has 2 components: 1)School cum Evacuation Center and; 2) SocialArtistry. The Schools Mitigating and Adapting toRisk and Threats (SMART) School cum EvacuationCenter demo project was selected due to the factthat public schools (elementary, high school andcollege) are already being utilized as ECs duringcalamities and hazards. Barangay Balogo wasselected as the pilot site for the demo project. ASMART School Ideal Designworkshop on SMART School Design and CampManagement was conducted by the IWG DRR. The design formulated during the workshop (AnnexII-H) was the product of the collaborative effort among the academe, LGU personnel, NationalGovernment Agencies, Private Sectors and other Stakeholders. Apart from creating an ideal designfor the SMART School, the participants were also oriented on Camp Coordination and Management.They were guided by parameters in formulating the plan, taking into account the guiding principlesof SPHERE (an international camp management and coordination standard).<strong>Terminal</strong> <strong>Report</strong> – <strong>Climate</strong> <strong>Change</strong> <strong>Project</strong> – <strong>Sorsogon</strong> <strong>City</strong>22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!