Frequency stabilityFailure of wind power supply after a three-phase fault in the380 kV grid near Dollern substationWind distribution in the E.ON Netz control area in Dec. 2002Hanover area Ems-Elbe Weser-Ems Schleswig-Holstein850 MW 500 MW 1,350 MW 2,300 MWScenario2001ScenarioDec. 2002ScenarioDec. 2005Observation point Failure capacity Inst. wind capacitySystem connectingpointGeneratorterminalsMachineterminals2,700 MW2,880 MW< 3,000 MW3,000 MW5,000 MWNew connecting regulations for WECs in force as of 20037,500 MWETG Conference Reliability of Power Supply 5 February 2003 Page 12<strong>Dr</strong>. <strong>Winter</strong> – Grid Planning