Requirements of the dynamic performance of wind energyconverters in the transmission networkSwitch from cos control to voltage control in the event of voltagedips greater than 10 %Reactive power intake may only exceed 25% of the nominal reactivepower of the wind farm during transient balancing time (about 400 ms)Or optionallySelective cut-off of wind generators incompatible with the system- Synchronisation within 2 seconds of the fault being rectified- Increase in power with a gradient of 10% rated power per second- The failure of a wind farm must not last longer than 12 secondsETG Conference Reliability of Power Supply 5 February 2003 Page 19<strong>Dr</strong>. <strong>Winter</strong> – Grid Planning