12.07.2015 Views

AASHTO WSDOT Questionnaire: Prestressed Girder Design Criteria

AASHTO WSDOT Questionnaire: Prestressed Girder Design Criteria

AASHTO WSDOT Questionnaire: Prestressed Girder Design Criteria

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MoDOTGregory Sanders StructuralDevelopment and SupportEngineer573.526.0245gregory.sanders@modot. Mo.govMontana DOTJeff Olsen, P.E Bridge AreaEngineer – Billings District406-444-7610 jolsen@mt.govNCDOTTodd M Garrison, PEAdvanced Engineer(919) 707-6538tgarrison@ncdot.govNebraska Department OfroadsFouad JaberAssistant State Bridge Engineer402-479-3967fouad.jaber@nebraska.govNHDOTDavid L. ScottIn-House <strong>Design</strong> Chief(603) 271-2731dscott@dot.state.nh.usNJDOTEric KraehenbuehlManager609-530-2552eric.kraehenbuehl@dot.state.nj.usNMDOTZann Jones Civil EngineerAdvanced(505) 827-5583zann.jones@state.nm.usNV DOTTodd StefonowiczAss’t Chief Structures Engr775.888.7550tstefonowicz@dot.state.nv.usTransformed SectionPropertiesWe use gross properties as astandard, but may usetransformed on a case-bycasebasisGross Section properties(routinely used)Transformed SectionProperties (used whenbeneficial)Gross Section propertiesTransformed SectionPropertiesGross Section propertiesGross Section propertiesNet section propertiesPer <strong>AASHTO</strong> LRFD Table5.9.4.2.2-1Per <strong>AASHTO</strong> LRFD Table5.9.4.2.2-1Per <strong>AASHTO</strong> LRFD Table5.9.4.2.2-1 (for <strong>AASHTO</strong>girders and modified bulb tees)b) Zero tension at service limitstate (for cored slab and boxbeam units, and for all girdersin corrosive environments)Our present policy is to use0.095sq.rtf’c and rate for0.19sq.rtf”cZero tension at service limitstateZero tension at service limitstatePer <strong>AASHTO</strong> LRFD Table5.9.4.2.2-1Per <strong>AASHTO</strong> LRFD Table5.9.4.2.2-1Per <strong>AASHTO</strong> LRFD Section5.14.1.4 - Bridges Composed ofSimple Span Precast <strong>Girder</strong>sMade ContinuousPer <strong>AASHTO</strong> LRFD Section5.14.1.4 - Bridges Composed ofSimple Span Precast <strong>Girder</strong>sMade ContinuousSimple span moments forsuperimposed dead loads and liveloadPer <strong>AASHTO</strong> LRFD 5.14.1.4NH has not done a continuousprecast prestressed girder bridgesince prior to LRFDimplementation. When we designour next one, our first attempt willbe option A.Per <strong>AASHTO</strong> LRFD Section5.14.1.4 - Bridges Composed ofSimple Span Precast <strong>Girder</strong>sMade ContinuousPer <strong>AASHTO</strong> LRFD Section5.14.1.4 - Bridges Composed ofSimple Span Precast <strong>Girder</strong>sMade ContinuousPer <strong>AASHTO</strong> LRFD Section5.14.1.4 - Bridges Composed ofSimple Span Precast <strong>Girder</strong>sMade Continuous1/23/2013Refined Estimates of Time-Dependent Losses Per <strong>AASHTO</strong>LRFD Article 5.9.5.4We use the approximate method withgross section properties and therefined method if we are using thetransformed section properties.a) Approximate Estimate of Time-Dependent Losses Per <strong>AASHTO</strong>LRFD Article 5.9.5.3b) Refined Estimates of Time-Dependent Losses Per <strong>AASHTO</strong>LRFD Article 5.9.5.4We don’t have a policy but in generalwe use the approximate methodApproximate Estimate of Time-Dependent Losses Per <strong>AASHTO</strong>LRFD Article 5.9.5.3Refined Estimates of Time-Dependent Losses Per <strong>AASHTO</strong>LRFD Article 5.9.5.4Approximate Estimate of Time-Dependent Losses Per <strong>AASHTO</strong>LRFD Article 5.9.5.Approximate Estimate of Time-Dependent Losses Per <strong>AASHTO</strong>LRFD Article 5.9.5.3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!