12.07.2015 Views

Operating Instructions - RS Hydro

Operating Instructions - RS Hydro

Operating Instructions - RS Hydro

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Waterloo Multilevel System Assembly ManualWhen adding each Port to the sequence you will connect the monitoring tubingand/or transducer or pump to be used at that Port. Each successive componentwill be threaded over the support cable, as well as the monitoring tubing andcabling as it is added. Section 6.0 discusses Port connections.Figure 4-5 Casing Section Being Threaded Over Monitoring TubingNote:To use theinstallationclamp, slidethe unlockingbar to the unlocked positionand open the clamp bylifting the handle. Adjustthe width of the jaws viathe adjustment knob so thecasing is held tightly whenthe clamp is closed. Returnthe locking bar to the lockedposition.Once at least 5 ft. (1.5 m) of the System has been assembled, start loweringthe System into the borehole. Adjust and lock the installation clamp onto thisassembly to hold it in place. The System is now hanging in the borehole andsupported by the installation clamp.Continue to install the System in the sequence shown in your Log, makingeach connection as described in the following section. Be sure to record thecomponents as they are assembled over the borehole on the Installation Log(see Appendix I).Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!