12.07.2015 Views

TARIFF INDEX - Port Of Fujairah

TARIFF INDEX - Port Of Fujairah

TARIFF INDEX - Port Of Fujairah

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

320 CONTAINER CARRIER VESSEL320.1 Container Carrier VesselG.R.TPILOT PEROPERATIONBERTHINGORUNBERTHINGTUGSPERHOURMOORINGBOATPILOTBOATPORTDUESLAY –BYUp to 2500 T 270 275250 l to 6000 T 450 350600 l to 12000 T 650 4251200 l to 25000T2500 l to 50000T5000 l to 120000T875 6751275 9502000 1350Above 120000 T 3150 2000Detention perhour or partthereofDhs.1,800per tugper houror partthereof800 1,5501. When usedfor runningextramooringswill Dhs.175 per houror partthereof2. When usedfor purposesother thanrunningvessel’slines, ratewill be Dhs.800 per houror partthereof400 perhour orpartthereof500MinimmDhs. 110/-0-3 days 18fils per TonAfter 3 daysfor each dayor partthereof, 7fils per GRTReferItemNo.323320.2 TUG AND BARGE OPERATION (CONTAINER BARGES)When tug & barge come, for Container/Cargo operation, and sail together, thenberthing/unberthing and port dues will be charged on the combined GRT of the tug & bargesas per normal Tariff 320.1.If one tug is used for berthing in the barge and another tug used for sailing out the barge, then thecharges for the tug & barge will be made separately. Barge will be charged as per Tariff 320.1 andthe tug will be charged as 8 fils per G.R.T per day and part thereof.320.3 All Charges (320.1 and 320.2) will be subject to 100% surcharge between 2400 Thursday to 0001hrs. Saturday and Public Holidays.320.4 Vessels without power, defective steering etc. , double the above rate apply.320.5 Shifting alongside adjacent berths at vessel's or agent's request will be charged as follows,i) Vessels up to 2,500 GRT Dhs. 275ii) Vessels from 2501 to 6000 GRT. Dhs. 350iii) Vessels from 6001 to 12000 GRT Dhs. 425iv) Vessels from 12001 to 25000 GRT Dhs. 675v) Vessels above 25001 GRT will not be considered as Shifting Alongside.Therefore, charges applicable as per Item 320.1.321 ROPESFurnishing of ropes for use in towing Dhs. 250 per ropes per day.322 GARBAGE SKIPSGarbage skips are compulsory and are supplied at a daily rate per skip per day of Dhs. 150.Page 11 of 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!