12.07.2015 Views

PRE-QUALIFICATION OF CONTRACTORS AND ... - Kenya Airways

PRE-QUALIFICATION OF CONTRACTORS AND ... - Kenya Airways

PRE-QUALIFICATION OF CONTRACTORS AND ... - Kenya Airways

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTRODUCTION<strong>Kenya</strong> <strong>Airways</strong> is the Pride of Africa! A world-class network airline that has been votedAfrica’s Best Airline, year after year, by Africa’s leading travel and aviation magazines.The Airline intends to update its register of prequalified building contractors andconsultants under the various categories for the period January 2013- December 2014.Interested eligible firms are invited to apply for prequalification, indicating the categoryof services they wish to provide.Those firms currently prequalified and wish to be considered need to apply afresh.One application form ONLY can be used to apply for ONE category. (Please note thatfailure to indicate the category no. and item description will lead toDIS<strong>QUALIFICATION</strong> of your bid)Please read through this document carefully and provide the requested informationtogether with ALL required support documents.<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 3 - of 14


INVITATION TO TENDER<strong>Kenya</strong> <strong>Airways</strong> Ltd invites applications for pre-qualification from competent buildingcontractors and consultants to carry out works within <strong>Kenya</strong> in the under listed categoriesfor the period from January 2013 to December 2014.A: <strong>CONTRACTORS</strong>KQ/P001/12 Building and Civil ContractorsKQ/P002/12 Electrical ContractorsKQ/P003/12 Plumbing and Drainage ContractorsKQ/P004/12 Air Conditioning ContractorsKQ/P005/12 Fire Detection & Suppression ContractorsKQ/P006/12 Furniture Contractors and SuppliersKQ/P007/12 Interior Décor Designers and ContractorsB: CONSULTANTSKQ/C008/12 ArchitectsKQ/C009/12 Structural EngineersKQ/C010/12 Quantity SurveyorsKQ/C011/12 Electrical & Mechanical EngineersKQ/C012/12 ValuersPrequalification document can be downloaded from www.kenya-airways.com. A nonrefundablefee of Ksh 3,000.00 per category is chargeable. Payments may be made at thecash office in Block A, Ground Floor situated at the Head Office on Old North AirportRoad, Embakasi during normal working hours. Please note that any document submittedwithout an original official receipt will be rejected.Completed prequalification documents enclosed in plain sealed envelopes, marked withthe Category Number & Description and addressed to:The Head of Supply Chain,<strong>Kenya</strong> <strong>Airways</strong> Ltd,P.O Box 19002,Nairobi, <strong>Kenya</strong>.should be deposited in the tender box situated at the main reception, so as to be receivedon or before 12.00 Noon, Thursday, 9 th August 2012.<strong>Kenya</strong> <strong>Airways</strong> Ltd reserves the right to accept or reject applications made pursuant tothe prequalification at its own discretion without assigning any reason thereof. Anysubsequent appointment made pursuant to the prequalification is subject to invitation totender for specific jobs/services.<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 4 - of 14


M<strong>AND</strong>ATORY REQUIREMENTSYou shall be required to attach the following mandatory documents where applicable;i. Original official receipt as proof of payment for the prequalificationdocument.ii. Certificate of Incorporation, Partnership or Business registrationiii. Trading Certificate where applicableiv. PIN Certificatev. Certificate of registration with relevant regulatory authorities where applicablevi. VAT certificatevii. Tax Compliance Certificateviii. List of Directors, telephone, postal and email addressix. Annual Returns and Receiptx. Accounts Informationxi. CVs of Senior Staff and Others as it may have been requested.xii. Organogramxiii. Evidence of physical registered office (Attach miscellaneous receipt)<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 6 - of 14


<strong>PRE</strong><strong>QUALIFICATION</strong> QUESTIONNAIREPART A – GENERAL INFORMATION1 Name of Organization2 Postal Address3 Principal Contact PersonP.O Box……………......Code……………Name: ……………………………………………Position: ……………………………………………4 Contacts:Telephone: …………………………………….Fax No. ……………………………………….Email: …………………………………………..5 Physical Location of BusinessPremises( Note that a visit to your officemay be made to confirminformation provided as part of theprequalification evaluation)6 Nature of organization (e.g. soleproprietorship, Public LimitedCompany, Partnership etc)Group email ……………………………………(Applicants are advised to give a group email address tofacilitate prompt communication of new tender invites)Town ……………………………………….Street………………………………………..Building Name ………………………………Floor…………………………………………LimitedLiabilityCompany(1)Partnership(2)SoleProprietor(3)7 Names of the Proprietor, Directorsor PartnersNOTE:Attach copies of Directors’ identitycards / passports1. ………………………………………………..2. ………………………………………………...3. …………………………………………………<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 7 - of 14


8 Geographical area of Operations4. …………………………………………………9 Business OperationsYear established………………………………………Duration of Business Operation………………………10 Company Registration No. (AttachCopy)Number…………………………………….11 VAT Registration No. (Attachcopy)PINNumberAttached copy?………………………… YES NONumber………………………… YES NO12. Valid Tax Compliance Certificate(attach copy)Attached copy?………………………… YES NO15 State Credit period (minimumproposed is 45 days)16 Registration with regulatoryrelevant bodiesRegistration Body ……………………………………Category of registration …………………………………<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 8 - of 14


PART B - ELIGIBILITY1. Have you or your principals been subject of legal proceedings for insolvency,bankruptcy, receivership or your business activities suspended for relatedreasons? YES/NO2. If yes, when------------------- (if yes, you must present legal documentary evidencethat you are cleared and your business is now solvent)3. Have you fulfilled your obligations to pay taxes and social security contributionsfor the last three years? YES/NO4. Are you or your servants or agents subject of legal proceedings for corrupt orunethical business practice or offered any inducement to any procurement entityso that you can be considered for award of a tender? YES/NO5. Is the firm making this application or any of its directors been debarred orsuspended from participating in public procurement or have any procuremententity initiated proceedings of that nature against the firm or one of its directors,for any reason whatsoever? YES/NO6. Have you had any contracts terminated for poor performance in the last five years,or any contracts where damages have been claimed by the contractingauthority/client? YES/NO<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 9 - of 14


PART C:BankerFINANCIAL INFORMATIONName of bankerAddress of banker…………………………………………………………………………TelephoneContact name and title__________________________________________________________FaxE mailFinancialinformation inKshs.Actual :previous TWO yearsProjected:next two years1 2 3 41. Total assets2. Currentassets3. Totalliabilities4. Currentliabilities5. Profitsbeforetaxes6. Profits aftertaxesSource of financeAmount Kshs.1.2.3.4.Attach a copy of firm’s audited accounts or certified bank statements for the previous twoyears together with letters of reference from the bankers regarding the firm’s creditposition.<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 10 - of 14


PART D: TRADE REFERENCESProvide contact details for 3 referees for previous/current work that is similar or the same to the one nowapplied for. Note that the referees may be contacted without further references to you. (Attachdocumentary evidence of existence of the contract)How many references are youindicating? (Tick one) 0 1 2 3AHave you previously beencontracted by KQ? Tick one YES NOB1.OthersOrganization NameContact Name and PositionOffice & Mobile Tel No.E-Mail AddressService providedDescribe the contract and nature of works………………………………………………………………………………………………………………………………………………When……………………….and for how long………………………………………………………………………………………………………………………………….………………………………………………………….…………………………………………………………..……………………………………………………………2. Organization Name…………………………………………………………Contact Name and Position………………………………………………………….Office & Mobile Tel No.………………………………………………………….E-Mail Address…………………………………………………………..Service provided3. Organization Name…………………………………………………………Contact Name and Position………………………………………………………….Office & Mobile Tel No.………………………………………………………….E-Mail Address…………………………………………………………..Service provided……………………………………………………………In addition to the above, you are required to attach copies of LPOs, Letters of Award, orany other approved document showing works done and values.<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 11 - of 14


PART E: SAFETY QUESTIONAIRE1. Does your organization have a safety policy? YES/NOIf yes, how often is it reviewed? -----------(Attach a copy)2. Does your company have a Safety, Health & Environment Management plan?YES/NO (provide evidence)3. If yes in (2) above, who in your organization is responsible for theimplementation and management of the plan?……………………………………………………………………………4. How does your organization capture and document safety and other relatedincidences at your work place? (Attach proof)…………………………………………………………………………………………………………………………………………………………..5. What is the recorded “accident free” period at the time of submission of thisapplication? ……………………………. Days6. What is longest “accident free” period ever achieved at your work place?………………………………………. Days7. Have ever been suspended from undertaking any works for safety, health andenvironment related issues? YES/NO8. Have your organization or the principal partner ever been charged for noncomplianceor violation of any safety related regulations? YES/NO9. What is the average number of regular employees stationed at your head officeand/or main workshops? ………………………………….10. Are the organization’s head office and/or major workshops registered as workplaces under OSHA 2007? YES/NO (if yes attach copy)11. Are there safety committees at the organization’s work places? YES/NO<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 12 - of 14


PART F1. Company LicensesProvide list of registration certificates with relevant bodies e.g. Ministry of Public Works,Road, Energy, Water, BORAQS, ERB, AAK, IQSK, IEK, ISK, CCK, Manufacturers,Product Dealership Licenses, Pest Control Products Board, etc. (Specify Classificationwhere applicable e.g. Ministry Public Works Class A,B,C,etc)2. Project Historya) Completed ProjectsList the information on projects completed over the last five (5) yearsNo Client Project Title Location/Town Start Date End Date ProjectCost/Value1Sub Contractors-IfAny- up To three2345a) On-going ProjectsList the information on up to five ongoing projectsNo Client Project Title & Location % Complete Expectedcompletion date1ProjectCost/ValueSource of Funding2345You can attach a separate sheet of paper if space provided is not sufficient<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 13 - of 14


3. Experiencea) How many years has your firm been engaged in the contracting business?.............................................................................................................................b) Describe nature of work performed by your firm……………………………...………………………………………………………………………………….c) How many years of experience have you had in the type of work described in (b)above…………………………………………………………………………..d) State the labour force engaged at any one time by your firmMaximum…………………………..Minimum…………………………………4. EquipmentAttach a list of all relevant vehicles, equipments and tools detailing ownership status (with proof), Name ofmanufacturer, model, Capacity, year of manufacture and any other relevant informationPART G: CERTIFICATIONI/We do hereby certify that the above information is correct in all respects.Full Name:Designation/PositionSignature:Date:Company Stamp<strong>Kenya</strong> <strong>Airways</strong> Prequalification Document July 2012 Page - 14 - of 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!