12.07.2015 Views

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

223-10Table 5.1LIST OF PLANT MACHINERY AND EQUIPMENTNo. Description Qty Cost (‘000 Birr)LC FC TCA. <strong>Sisal</strong> <strong>Fibre</strong> <strong>Production</strong>1 Fluted crushing rollers (with motor 4 sets - 320 320& control panel)2 Metal drums (with mounted 4 paris - 80 80(blades) (Revolving)3 Washing basins (stainless steel) 2 pcs 20 - 204 Revolving metal drums (with 2 pcs - 50 50motor <strong>and</strong> control panel)5 Tables, h<strong>and</strong> tools, etc. Reqd. - 17.5B. <strong>Kenaf</strong> fibre production1 Cutting knife 10- 20 20sets2 Mechanical stripping device 5 sets - 15 153 Washing basin (stainless steel) 4 pcs 40 - 404 Tables, h<strong>and</strong> tools, etc. Reqd. - 15 15FOB price 60 517.50 577.50Freight, Insurance, customs, bank110 - 110chargesCIF l<strong>and</strong>ed cost 170 517.50 687.502. L<strong>and</strong>, Building <strong>and</strong> Civil WorksL<strong>and</strong> is required <strong>for</strong> factory building <strong>and</strong> <strong>for</strong> annex buildings that comprise <strong>of</strong> <strong>of</strong>fices,cafeteria, guard houses <strong>and</strong> buildings <strong>for</strong> utilities. Spare l<strong>and</strong> <strong>for</strong> future expansion is alsorequired. Thus, <strong>the</strong> total l<strong>and</strong> requirement is estimated to be 3000 m 2 . Of this built-uparea will be 1500 m 2 . At <strong>the</strong> rate <strong>of</strong> Birr 1.0 per m2 <strong>for</strong> a period <strong>of</strong> 80 years <strong>the</strong> total

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!