12.07.2015 Views

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

223-15Table 7.2ANNUAL PRODUCTION COST AT FULL CAPACITY ('000 BIRR)Items Cost %Raw Material <strong>and</strong> Inputs23,633.75 95.07Utilities13.38 0.05Maintenance <strong>and</strong> repair75 0.30Labour direct298.56 1.20Factory overheads99.52 0.40Administration Costs199.04 0.80Total Operating Costs24,319.25 97.82Depreciation286.25 1.15Cost <strong>of</strong> Finance254.48 1.02Total <strong>Production</strong> Cost 24,859.98 100C. FINANCIAL EVALUATION1. Pr<strong>of</strong>itabilityAccording to <strong>the</strong> projected income statement, <strong>the</strong> project will start generating pr<strong>of</strong>it in <strong>the</strong>first year <strong>of</strong> operation. Important ratios such as pr<strong>of</strong>it to total sales, net pr<strong>of</strong>it to equity(Return on equity) <strong>and</strong> net pr<strong>of</strong>it plus interest on total investment (return on totalinvestment) show an increasing trend during <strong>the</strong> life-time <strong>of</strong> <strong>the</strong> project.The income statement <strong>and</strong> <strong>the</strong> o<strong>the</strong>r indicators <strong>of</strong> pr<strong>of</strong>itability show that <strong>the</strong> project isviable.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!