12.07.2015 Views

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

223-14Table 7.1INITIAL INVESTMENT COSTSr.No.Cost ItemsTotal Cost(‘000 Birr)1 L<strong>and</strong> lease value 2402 Building <strong>and</strong> Civil Work 3,000.003 Plant Machinery <strong>and</strong> Equipment 687.504 Office Furniture <strong>and</strong> Equipment 755 Vehicle 2006 Pre-production Expenditure* 373.417 Working Capital 4343.59Total Investment cost 8,919.5Foreign Share 29* N.B Pre-production expenditure includes interest during construction (Birr273,410 ) <strong>and</strong> Birr 100 thous<strong>and</strong> costs <strong>of</strong> registration, licensing <strong>and</strong> <strong>for</strong>mation <strong>of</strong> <strong>the</strong>company including legal fees, commissioning expenses, etc.B. PRODUCTION COSTThe annual production cost at full operation capacity is estimated at Birr 24.89 million(see Table 7.2). The material <strong>and</strong> utility cost accounts <strong>for</strong> 95.12 per cent, while repair<strong>and</strong> maintenance take 0.30 per cent <strong>of</strong> <strong>the</strong> production cost.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!