12.07.2015 Views

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

Profile for the Production of Fibre From Kenaf and Sisal - SNNPR ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

223-7that <strong>the</strong> envisaged plant will have market share with an annual production capacity <strong>of</strong>10,000 tones. <strong>Production</strong> shall be carried out in two shifts 16 hours a day, <strong>for</strong> 300 days ayear.2. <strong>Production</strong> Programme<strong>Production</strong> will start at lower capacity (75%) during <strong>the</strong> initial period <strong>of</strong> plant operationto give provisions <strong>for</strong> operational skill development <strong>and</strong> create adequate opportunity <strong>for</strong>establishing potential market out lets. Then production will rise to 85% <strong>and</strong> 100%during <strong>the</strong> second <strong>and</strong> third year, respectively. The production programme <strong>of</strong> <strong>the</strong> planttoge<strong>the</strong>r with percentage capacity utilization over <strong>the</strong> production building-up period isgiven in Table 3.2 below.Table 3.2PRODUCTION PROGRAMMEYear 1 2 3 <strong>and</strong> aboveCapacity utilization (%) 75 85 100<strong>Production</strong> (tone) 7500 8500 10,000IV.MATERIALS AND INPUTSA. RAW AND AUXILIARY MATERIALSThe basic raw materials <strong>for</strong> <strong>the</strong> production <strong>of</strong> sisal <strong>and</strong> kenaf fibers are sisal leaves <strong>and</strong>stems <strong>of</strong> kenaf plant. These raw materials are grown in <strong>SNNPR</strong>S, particularly in AwassaZuria,The fibrous materials expected to be extracted are 77.2% <strong>for</strong> sisal <strong>and</strong> about 66% <strong>for</strong>kenaf by weight. Thus, to produce 10,000 tons <strong>of</strong> sisal <strong>and</strong> kenaf fibers, <strong>the</strong> average rawmaterial requirement is estimated to be 13505 tons, assuming that 7500 tons <strong>of</strong> sisal fiber

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!