ADDENDUM 1FORBID DOCUMENT NO. <strong>RFP</strong> <strong>2013</strong>-<strong>004</strong>NORTHWEST WASHINGTON, JEFFERSON COUNTY AREAOSP CONSTRUCTION PROJECTNORTHWEST OPEN ACCESS NETWORKTACOMA, WASHINGTON


<strong>Add</strong>endum 1Issue Date: March 4, <strong>2013</strong>Sign in Sheet


Contractors Questions & AnswersOSP Fiber Const. Project • <strong>RFP</strong> <strong>2013</strong>-<strong>004</strong> <strong>NW2</strong> • Contractor Vendor QuestionsDate Contractor / Vendor Question Answer ResponderColu Column2 Column4 Column5 Column6 Column81 2/28/<strong>2013</strong>Boring under the pavement, where are the handholes going?They are off to the side, or beyond the ditch. As far away from traffic lanesas possible.B.Nunes2 2/28/<strong>2013</strong>What will the transition look like, can it begradual or 90?It can be gradual, especially on certain sections were you will have to gounder deep ditchs so you can come up. There will be some that you cango 90 degree, to get out of ROW.B.Nunes3 2/28/<strong>2013</strong> IE unit in the bid?Pulling fiber through duct we built in the spring, ~8 miles. This is incorrectit was @ 2.8 miles of underground we built in a @ 5 mile stretch of SR 119the rest is aerial.B.Nunes4 2/28/<strong>2013</strong>In the Bid it Called out for trenching, but I wouldprefer to plow, is that allowed?Yes, provided you meet the conditions of the permit, and beddingrequirements. Plowing is called Trench.B.Nunes6 2/28/<strong>2013</strong>BFO 96i and 48i EE(D) existing fiber duct, 45feet and -160 feet. It’s on the unit tabulation butpossibly not on the as-builts.There are 5 instances of the “ED” unit:Sheet 003-31 (BFO96(2x1.25”)ED,Quantity = 40’) ** Note that this was probably fat-fingered and should havebeen 30’. Looking at the asbuilts from the SR19 project, there was a 10’length of 4” stubbed to P122. Therefore this unit calls for a BFO96I (one1.25” duct with a 96 fiber in it, along with 2 vacant 1.25” innerducts) pulledthough the 4”. The “E” is for existing duct per RUS and the “D” is forDUAL or multiple pulled together. This unit was not be part of the SR19build since it includes the cable and ties to the BM82 from the new build.This unit is correct in this instance in this case and also applies in thebelow locations. Sheet 029 (BFO48I(2x1.25”)ED, Quantity = 45’); FromHH18 to P103, Sheet 036 (BFO96(2x1.25”)ED, Quantity = 45’), From HH20to P135, Sheet 039 (BRO96(2x1.25”)ED, Quantity = 30’), From HH23 toP156. Any IV units that are prefaced with a cable designation needs tohave the cable included. Example: BFO48IV(1)(1.25”) includes cable.B.Nunes

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!