12.07.2015 Views

Functional Analysis of Selected NNSA Sites - National Nuclear ...

Functional Analysis of Selected NNSA Sites - National Nuclear ...

Functional Analysis of Selected NNSA Sites - National Nuclear ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Functional</strong> <strong>Analysis</strong><strong>of</strong> <strong>Selected</strong> <strong>NNSA</strong> <strong>Sites</strong>March 2010ItemIntegrated CircuitsIntegrated Work ControlDocuments− Integrated Construction ProjectPlan− ICOs− IWOsIntegrated Project Work ReleaseIrradiated TPBARsJoint Test Assembly (JTA)JTA DesignJTA Sub-AssembliesLegacy Benefits ProgramLEU SolutionLow Level WasteMachined Part/AssembliesMaster Authorization AgreementMaterialsMC (Classified)Military Spares (DoD)Mixed WasteNatural UraniumNeutron Generators (NG)New Material & StockpileEvaluation Schedule (NMSES)Electrical/Electronic Assembly item.DefinitionEither an ICO (Integrated Contractor Order -– a formal requisition, with a valuegreater than $250k, placed by one integrated contractor with another for thedelivery <strong>of</strong> material, equipment, or services in support <strong>of</strong> DOE/<strong>NNSA</strong>-sponsoredand/or DOE/<strong>NNSA</strong>-authorized work.) ,or an IWO (Inter<strong>of</strong>fice Work Order –- Aformal requisition, with a value greater than $250k, for materials, equipment, orservices between two DOE/<strong>NNSA</strong> integrated contractors under the jurisdiction <strong>of</strong>different DOE/<strong>NNSA</strong> operations <strong>of</strong>fices.; IWOs are authorized between twoaffected DOE/<strong>NNSA</strong> Operations Offices prior to commencement <strong>of</strong> the supplyingDOE/<strong>NNSA</strong> integrated contractor work activities.).Tritium Producing Burnable Absorber Rods irradiated by TVA.A DOE/<strong>NNSA</strong>-developed configuration, based on DOE/<strong>NNSA</strong>-DoD requirements,for use in the flight test program. The physical appearance and characteristics <strong>of</strong> aJTA approximate a WR configuration to the extent practicable. It includesdevelopment and production JTAs derived from WR designs, modified to removethe nuclear explosive capability, and fitted with telemetry and instrumentation tothe extent required by each test.JTA Design package per test requirements.A DOE/<strong>NNSA</strong>-developed sub-assembly configuration, based on DOE/<strong>NNSA</strong>-DoDrequirements, for use in the flight test program. The physical appearance andcharacteristics <strong>of</strong> a JTA Sub-Assembly approximate a WR configuration to theextent practicable. It includes development and production components derivedfrom WR designs, modified to remove the nuclear explosive capability, and fittedwith telemetry and instrumentation to the extent required by each test.Low Enriched Uranium.Radioactive waste that is not high-level waste, spent nuclear fuel, transuranicwaste, byproduct material (per Atomic Energy Act), or is a naturally occurringradioactive material.Includes Reservoirs, Valves, Cases, Supports, Brackets, Covers, MiscellaneousMechanical Parts, Mechanical Switches, Environmental Sensing Devices, MockPit. Also includes those items that are recycled componentsProvides agreement between DOE and its contractor as to the implementation <strong>of</strong>an Authorization Basis Document.Materials purchased from commercial suppliers (e.g., metals, chemicals, gascylinders, solvents, tapes, markers, etc.).Classified component.Hardware spares for the military that are paid for by DoD.Waste containing both radioactive and hazardous components.Natural uranium from DOE Stockpile via TVA.Specialty part manufactured by SNL.A schedule that tracks and initiates implementation <strong>of</strong> the NMSEP for all weaponsystems with an active evaluation program. The NMSES includes such informationas the weapon system, cycle number, sample quantities and serial numbers bycycle, required and actual return dates <strong>of</strong> sample weapons, required Joint TestAssembly delivery dates and locations, and flight test dates.Page 49 <strong>of</strong> 56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!