12.07.2015 Views

Functional Analysis of Selected NNSA Sites - National Nuclear ...

Functional Analysis of Selected NNSA Sites - National Nuclear ...

Functional Analysis of Selected NNSA Sites - National Nuclear ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Functional</strong> <strong>Analysis</strong><strong>of</strong> <strong>Selected</strong> <strong>NNSA</strong> <strong>Sites</strong>March 2010ItemProduct Design InformationSupportProduction AgencyProduction Change RequestsProduction Mission AssignmentPage 51 <strong>of</strong> 56DefinitionInformation and/or data provided by the Design Agencies to address questions,issues, concerns, etc., related to specific products manufactured by ProductionAgencies [e.g., Special Instruction Engineering Releases, Information (SIER &SIER/B), Engineering Releases (IER)]The organization responsible for the procurement or production <strong>of</strong> DOE/<strong>NNSA</strong>weapon material. The term production applies to processing new and/or reusedmaterial as well as repair, modification, surveillance, test, disassembly, and reassemblyoperations.Engineering Change Request (ECR), see D&P Manual Glossary.The formal assignment by <strong>NNSA</strong> <strong>of</strong> the responsibility for manufacturing processdevelopment, production, and/or procurement <strong>of</strong> specified products, materials,product or material family, and for management <strong>of</strong> the related technology bases.Production Performance Reporting Monthly Operations Performance Report, Ship Performance Metrics, QualityAcceptance Rate, Interruption <strong>of</strong> Work Impact Assessment.Production Program Definition(PPD)Program & Project ManagementReporting− Project Management PlanProject Data SheetProgram Management Documents – see D&P 3.2. Includes Weapon ProgramDescription (A Doc), PPD Dataset, Retirement Disposition Instruction (RDI, DDoc), Limited Life Component Support Definition.Periodic reports <strong>of</strong> contractor progress, as required during the Execution Phase <strong>of</strong>the Planning, Programming, Budgeting, and Execution/Evaluation process.Program Control Document (PCD) Program Management Documents, see D&P 3.2. Includes : Planning Schedule,Authorization Schedule, Directive and Directive Schedule.Program Direction− Program GuidanceFiscal Year GuidanceProgram- direction documents provided to Design Agencies and ProductionAgencies as part <strong>of</strong> the Programming Phase <strong>of</strong> the Planning, Programming,Budgeting, and Execution/Evaluation process.Program Support Site program execution information and data as requested by <strong>NNSA</strong> (e.g.,production scheduling, ADAPT/R&D/Campaign recommendations, riskmanagement.Pu MaterialsPurchased Specialty ItemsQA DocumentationQualification Evaluation (QE)SamplesQualification Evaluation ReleaseR&D documentationReactor Fuel MaterialRecord <strong>of</strong> Assembly/Record <strong>of</strong>Disassembly (ROA/ROD)Reliability/Surveillance PlanningDocumentsCurrent Pu stockpile inventory.Commercial items specifically purchased by the Design Agencies for use by theProduction Agencies (Integrated Circuits, High Voltage Capacitors, Gap Tubes,Batteries, Magnetics).All documentation specified by the WQAP Manual required to ensure weaponquality during production, acceptance, and its associated disposition as applicable.Includes quality assessments and corrective actions.Any item that is developed during Weapon Design and Development, or Researchthat is used to certify the weapon.An engineering release that assigns the qualification status <strong>of</strong> a product, process,s<strong>of</strong>tware, acceptance equipment, or system test equipment, and (if the evaluationresults are satisfactory) authorizes the listed items for an intended use.Research and Design DocumentationRadioactive fuel provided to support the US Navy's nuclear fleet.Per referenced IBP, all associated documentation related to weapon/componentassembly/disassembly activities reside in the NWC-ROA Master Databank.Includes New Material and Stockpile Evaluation Plan (NMSEP) and <strong>Nuclear</strong>Weapon Sub System Test Plan (NWSSTP).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!