12.07.2015 Views

Functional Analysis of Selected NNSA Sites - National Nuclear ...

Functional Analysis of Selected NNSA Sites - National Nuclear ...

Functional Analysis of Selected NNSA Sites - National Nuclear ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Functional</strong> <strong>Analysis</strong><strong>of</strong> <strong>Selected</strong> <strong>NNSA</strong> <strong>Sites</strong>March 2010ReservoirsRetired CSAsRetired PitsItemDefinitionReservoirs that are returned from field deployment.CSAs no longer required by the active stockpile that are retained for potentialreuse.Pits no longer required by the active stockpile that are retained for potential reuse.Retr<strong>of</strong>it InformationSafeguards Transporter (SGT)Shipping TransportationAuthorization BasisdocumentationsSignificant Finding InvestigationReport (SFIR)Materials and tools for retr<strong>of</strong>it, retr<strong>of</strong>it instructions, definitions, and requirements.Specially designed trailers used by the Office <strong>of</strong> Secure Transportation to transportweapons.An <strong>NNSA</strong>-prepared approval that details a regulatory equivalent transportationconfiguration, authorized contents, regulatory (addressed by Federal regulations)and emergency response hazards, and transportation restrictionsA formal investigation by a committee, chaired by the appropriate Design Agency,to determine the cause and impact <strong>of</strong> a reported anomaly, and to recommendcorrective actions as appropriate.Significant Finding Notice The communication channel used by a Production Agency to advise theappropriate Design Agency <strong>of</strong> weapon anomalies.Special Equipment List /Commercial Equipment ListSpecial <strong>Nuclear</strong> Materials (SNM)Specialized EquipmentSpent <strong>Nuclear</strong> FuelStandard Accounting andReporting System (STARS)Surveillance ComponentsSurveillance Sub-Assemblies/ComponentsTechnical Qualification ProgramTechnical SupportSELs specify the Test, Handling, and Use Control (UC) equipment/s<strong>of</strong>twarerequired in the field for each nuclear weapon system produced by the DOE/<strong>NNSA</strong>.Nomenclature, description, use, specification, packaging, and estimated times forfirst delivery to the DoD <strong>of</strong> each new item are incorporated in the SEL. CELsspecify those parts <strong>of</strong> nuclear weapons and T, H and UC equipment that have ageneral commercial application, do not contain source and special nuclearmaterials, and are not within the definition <strong>of</strong> non-nuclear weapon parts.Plutonium, uranium enriched in the isotope 233 or in the isotope 235, and anyother material which pursuant to the provisions <strong>of</strong> Section 51 <strong>of</strong> the Atomic EnergyAct <strong>of</strong> 1954, as amended, has been determined to be special nuclear material, butdoes not include source material; or any material artificially enriched by any <strong>of</strong> theforegoing, but does not include source material.Custom equipment/supports/containers used to support weapon R&D, Production,Maintenance, and Training (e.g., Test & Handling Gear, Test Bed Hardware,Containers, Trainers and Trainer Components, Parachutes, etc.).<strong>Nuclear</strong> fuel (Foreign and Domestic Research) returned for disposition.STARS is the DOE’s primary unclassified financial reporting system. The <strong>NNSA</strong>Service Center ensures DIMS/STARS balances agree.Components identified by Design Agency that need to be evaluated and testedduring surveillance <strong>of</strong> a weapon. Includes CSA, detonators and pits.Weapon sub-assemblies or components removed from a Surveillance unit byPantex for testing.Describes the training and qualification requirements for technical personnel withsafety responsibilities at defense nuclear facilities. It documents how <strong>NNSA</strong>identifies these positions; tailors qualification standards for them; establishes timeand duty limitations for qualification; describes the process to identify learningactivities to achieve competency for the specific job duties; and establishesmethods for evaluating qualification.Personnel provided by a Design Agency or Production Agency to support anothersite, DOE Program, or non-DOE organization.Page 52 <strong>of</strong> 56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!