Nutrient Transport Modelling in the Daugava River Basin - DiVA Portal
Nutrient Transport Modelling in the Daugava River Basin - DiVA Portal
Nutrient Transport Modelling in the Daugava River Basin - DiVA Portal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Appendix F. Regression l<strong>in</strong>es of reported and modelledmonthly and yearly valuesModelled76543210a) Monthly streamflow, calibration period (cm/month)y = 0,4771x + 1,0175R 2 = 0,36270 2 4 6 8 10 12ReportedModelled9876543210b) Monthly streamflow, validation period (cm/month)y = 0,6978x + 0,6178R 2 = 0,53340 2 4 6 8 10 12ReportedModelled1000080006000400020000c) Monthly nitrogen load, calibration period(ton/month)y = 0,4623x + 1245,9R 2 = 0,31770 2000 4000 6000 8000 10000 12000 14000ReportedModelledd) Monthly nitrogen load, validation period (ton/month)y = 0,4125x + 992,1R 2 = 0,4437140001200010000800060004000200000 5000 10000 15000 20000 25000ReportedModelled14012010080604020e) Monthly phosphorus load, calibration period(ton/month)y = 0,0146x + 16,562R 2 = 0,005800 200 400 600 800 1000ReportedModelled25020015010050f) Monthly phosphorus load, validation period(ton/month)y = 0,1834x + 1,7934R 2 = 0,183700 100 200 300 400 500 600ReportedFigure F1. Regressions of monthly reported and modelled values of streamflow,nitrogen load and phosphorus loads for calibration period and validation periodrespectively.36