Project Time-Cost Trade-Off 7.1 Introduction In the previous chapters ...

Project Time-Cost Trade-Off 7.1 Introduction In the previous chapters ...

Project Time-Cost Trade-Off 7.1 Introduction In the previous chapters ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Cumulative cost increase = 670 + 700 = LE 1370Now, <strong>the</strong>re is no fur<strong>the</strong>r shortening is possible.The contract duration and <strong>the</strong> corresponding cost are given in <strong>the</strong> table below.Duration Direct cost X 1000 LE <strong>In</strong>direct cost x 1000 LE Total cost x 1000 LE59 36.50 7.375 43.87557 36.62 <strong>7.1</strong>25 43.74555 36.77 6.875 43.64553 36.97 6.625 43.59551 3<strong>7.1</strong>7 6.375 43.54549 37.87 6.125 43.995LE x 10005040302010Total costDirect cost<strong>In</strong>direct cost048 50 52 54 56 58 60<strong>Time</strong> (days)Dr. Emad Elbeltagi

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!