12.07.2015 Views

Initial Checklist - Bel-Aqua Pool Supply, Inc.

Initial Checklist - Bel-Aqua Pool Supply, Inc.

Initial Checklist - Bel-Aqua Pool Supply, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Elevated Suction ApplicationWeld Relay ADC CNT needs to be changed for elevated applications more than 3 ft above the water level.While the system ispowered off, turnon dip switch 7.Re-apply power. Referto page 19 of the servicemanual.VR 1000 VER X.X<strong>Initial</strong> Start OKPress “OK”.<strong>Initial</strong> Set-upComplete? Y/NIn this case answer“NO” as we have notset up the system yet.Sol/Mot Delay =120, Change? Y/NAnswer “N”.SU-Pulse Units =50 change? Y/NAnswer “N” to this question.Stratum will attemptto restart.Pinch Limit = 925Change? Y/NAnswer “N”.Enable WeldedRelay Test? Y/NAnswer “Y” to thisquestion. Welded relaytest should always beenabled.Weld Relay ADC =60, change? Y/NAnswer “Y” for elevatedsuction.Set H2O HammerDelay? Y/NAnswer “N” to thisquestion.Power down theStratum. Turn offdip switch 7.Re-apply power to theunit, proceed to“Unprotected Mode” tofill out the Run &Record worksheet.Weld Rly ADC CNT60Use the Up and Down keysto adjust. <strong>Inc</strong>rease this# in increments of 20 foreach foot of elevationabove 3 ft. Example:4 ft = 805ft = 1006ft =1207ft = 140Press “OK” to advance to thenext screen.4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!