12.07.2015 Views

bus shelter replacement project - City of Norwalk

bus shelter replacement project - City of Norwalk

bus shelter replacement project - City of Norwalk

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

25.0'NEWS NEWSNEWS NEWSTEL.19 4T.S.8.0'867.6'3.3'79.0'GTEPIONEER BLVD.DIRECTION OF TRAFFIC5' GRADETRANSITION~40' TO ETWALONDRA BLVD.BUS STOP #41: PIONEER & ALONDRA (NB/FS)SCALE: 1" = 10'SHELTER POSTANCHOR BOLTS & BASE PLATECONC. SIDEWALKLEVEL ACROSSALL POSTSDRY PACK UNDERPLATE 1-1/2" MIN, 2" MAXCONC. FTG(4) #5 E.W.1'-9"3'-6" SQUARE144" CONC. SURROUND TO COL. &BASE PLATE1/2" EXPANSION JOINT ALLAROUND COLUMNKALEIDOSCOPE SHELTER FOOTING DETAILNTS4"3" CLR1'-3" 7 3/4"MIN CLRNOTE:CONCRETE:f'c=3000PSIREINF STL: GRADE 60MIN SOIL BEARING CAP: 1000 PSFREMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESRELOCATE/REINSTALL EXISTING TRASH RECEPTACLE6 REMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTING7 REMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 1048 REMOVE EXISTING & INSTALL NEW PCC CURB & GUTTER(MATCH EXISTING) PER CITY OF NORWALK STD. PLAN 105WITH A 12" THICK GUTTER9 INSTALL NEW TOLAR SHELTER, SOLAR LIGHTING, ANDPRESIDIO BENCH PER DETAIL ON SHEET A-4 & SPECIFICATIONSCITY OF NORWALKBUS SHELTER REPLACEMENT PROJECTSHEET:A-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!