12.07.2015 Views

bus shelter replacement project - City of Norwalk

bus shelter replacement project - City of Norwalk

bus shelter replacement project - City of Norwalk

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5' GRADETRANSITIONAS APPLIES1 916' - 8 3 8"5' GRADETRANSITIONAS APPLIES% EXIST.% VARIESSIGN5' MINCLEARPER PLAN2% MAXBENCH3 OR 4TRASH4' - 8"% VARIES% EXIST.18"5 OR 65 OR 6REMOVAL LIMITS PER PLAN1 97 8AS APPLIES~108"5' MINCLEAR3 OR 4 9'-2 3/4"7'-3"39 3/4"1345REMOVE & DISPOSE OF EXISTING CLEAR CHANNEL BUSSHELTER, BENCH AND/OR TRASH RECEPTACLE AS APPLIESINSTALL NEW PRESIDIO TRASH RECEPTACLERELOCATE/REINSTALL EXISTING TRASH RECEPTACLEREMOVE EXISTING, RELOCATE AND INSTALL NEW 12' I-STOPPOLE & FOOTING6 REMOVE EXISTING, REPLACE & INSTALL NEW 12' I-STOPPOLE IN EXISTING FOOTING7 REMOVE EXISTING & INSTALL NEW 4" PCC SIDEWALK PERCITY OF NORWALK STD. PLAN 1048 REMOVE EXISTING & INSTALL NEW PCC CURB & GUTTER(MATCH EXISTING) PER CITY OF NORWALK STD. PLAN 105WITH A 12" THICK GUTTER9 INSTALL NEW TOLAR SHELTER, SOLAR LIGHTING, ANDPRESIDIO BENCH PER DETAIL ON SHEET A-4 & SPECIFICATIONSCITY OF NORWALK1 9BUS SHELTER REPLACEMENT PROJECTTYPICAL TOLAR SHELTER INSTALLATION DETAILS4'-8"SHEET:A-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!