12.07.2015 Views

May 21, 2003 - City of Miami Beach

May 21, 2003 - City of Miami Beach

May 21, 2003 - City of Miami Beach

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Afteraction <strong>May</strong> <strong>21</strong>, <strong>2003</strong> <strong>City</strong> <strong>of</strong> <strong>Miami</strong> <strong>Beach</strong>evaluated the procurement method process previously chosen for Bid Package 1 to determine whether itwould be more effective to handle the first phase f the project under the Job Order Contracting (JOC)program, which was put in place earlier this year to streamline the procurement process for small andmedium sized projects. It was estimated that approximately two (2) to three (3) months would be saved byusing the JOC system as opposed to a traditional bid system. A Notice to Proceed with the construction f BidPackage 1 is anticipated for June or July <strong>of</strong> <strong>2003</strong>.c) The Administration presented the Committee a report <strong>of</strong> the unfunded/under-funded GO Bond-fundedprojects.Item 3.a) Informational items reviewed by the Committee included the calendar <strong>of</strong> Community meetings.b) The Administration reported to the Committee that a CDW #2 for South Pointed Streestcape Project Phase IIwas held on <strong>May</strong> 1, <strong>2003</strong> with <strong>City</strong> Staff, Program Managers, and the project Consulting Team Wolfberg-Alvarez. Approximately a dozen neighborhood residents attended. The Administration advised thecommunity that based upon input received at the first CDW, the Administrating adjusted the funding to includean additional $1 million dollars for requested lighting and s tormwater improvements. The Residents werepleased that the <strong>City</strong> had responded to their lighting and stormwater concerns, and were anxious to moveforward with the proposed improvements.c) The Administration reported to the Committee that the North Shore Park and Youth Center Furniture,Fixtures and Equipment (FF&E) were not included in the construction project. The North <strong>Beach</strong> Youth CenterOversight Committee as pledged to raise $300,000 to fund the FF&E for the Youth Center. The Administrationwill w ork with Parks and Recreation Department to identify any funding needs above and beyond the fundsraised by the North <strong>Beach</strong> Youth Center Oversight Committee that may be needed to fully equip the NorthYouth Center to make it functional.d) The Administration informed the Committee that a resolution appropriating funding in the amount <strong>of</strong>$200,000 includes a contingency <strong>of</strong> approximately $100,000 in case any additional unforeseen conditionsoccur during the renovation <strong>of</strong> the existing building in Phase II, and is anticipated to fund Phase I throughcompletion.e) The Administration reported that the <strong>City</strong> Commission has approved a resolution authorizing theappropriation <strong>of</strong> $150,000 <strong>of</strong> unallocated 1999 General Obligation Fond Parks Funds previously allocated forShane Watersports Center to supplement the Normandy Isle Pool Project Construction Fund.Prepared by the <strong>City</strong> Clerk’s Office Page No. 8M:\$CMB\CITYCLER\AFTERACT\<strong>2003</strong>\Afteractions\aa0305<strong>21</strong>.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!