12.07.2015 Views

Fuel Procurement Plan for the Lake Tahoe Basin - Placer County ...

Fuel Procurement Plan for the Lake Tahoe Basin - Placer County ...

Fuel Procurement Plan for the Lake Tahoe Basin - Placer County ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Biomass – Organic matter in trees, agricultural crops and o<strong>the</strong>r living plant material.Carbohydrates are <strong>the</strong> organic compounds that make up biomass. These compounds are<strong>for</strong>med in growing plant life through photosyn<strong>the</strong>sis, a natural process by which energyfrom <strong>the</strong> sun converts carbon dioxide and water into carbohydrates, including sugars,starches and cellulose.Board Foot – The amount of wood contained in an unfinished board 1 inch thick, 12inches long, and 12 inches wide (abbreviated “BF”). Common units as related to saw logvolume measurement include 1,000 BF or MBF and 1,000,000 BF or MMBF.Bone Dry Ton – Traditional unit of measure used by industries (pulp/paper, biomasspower) that utilize biomass as a primary raw material. One bone dry ton (BDT) is 2,000pounds of biomass (usually in chip <strong>for</strong>m) at zero percent moisture. Typically biomasscollected and processed in <strong>the</strong> <strong>for</strong>est is delivered “green” to <strong>the</strong> end use facility at 50%moisture. One BDT (assuming 50% moisture content) is two green tons (4,000 pounds at50% moisture content).British Thermal Unit – The quantity of heat required to raise <strong>the</strong> temperature of onepound of water from 60 degrees F (Fahrenheit) to 61 degrees F at a constant pressure ofone atmosphere.Chip – A small piece of wood typically used in <strong>the</strong> manufacture of pulp/paper, compositepanels, fuel <strong>for</strong> power/heat generation, and landscape cover/soil amendment.Cogeneration – The combined generation of both heat and power at one facility using<strong>the</strong> same fuel source.Ecosystem Services – The processes by which <strong>the</strong> environment produces resources thatinclude clean water, timber, recreation, and wildlife habitat.Generation – The process of creating electricity. Typically generation is accomplishedto supply electricity to an on-site facility and/or <strong>for</strong> sale to an electric utility.Green Ton – Traditional unit of measure used by industries (pulp/paper, biomass power)that utilize biomass as a primary raw material. One green ton (GT) is 2,000 pounds ofbiomass (usually in chip <strong>for</strong>m) with no correction <strong>for</strong> moisture content.Hazardous Forest <strong>Fuel</strong>s – Woody biomass material that poses a substantial fire threat tohuman or environmental health.Kilowatt – A standard unit <strong>for</strong> expressing <strong>the</strong> rate of electrical output.Megawatt – One thousand kilowatts. Enough electricity to support approximately 750 to1,000 households.<strong>Fuel</strong> <strong>Procurement</strong> <strong>Plan</strong> <strong>for</strong> <strong>the</strong> <strong>Lake</strong> <strong>Tahoe</strong> <strong>Basin</strong> Biomass Energy Facility 3TSS Consultants

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!