12.07.2015 Views

P - Transmission

P - Transmission

P - Transmission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AECOMPuketoi Wind Farm Technical Report145.3 Soil Resistivity Test and ModellingSoil resistivity testing has not been conducted in the area for the developed design. Test data is howeveravailable near the National Grid connection point and also for similar wind farm developments in the area(specifically Tararua and Te Rere Hau wind farms). Using this available data, the soil resistivity in the area ischaracterised by a two layer profile, comprising a very high resistivity (±1500m) top layer with nominal thicknessof 2m and a high resistivity (

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!