12.07.2015 Views

Heating Helper

Heating Helper

Heating Helper

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER 1 - STEAMB. Dropped Header PipingSTEAM SUPPLY MAIN - SLOPE DOWN FROMHIGH POINT ABOVE BOILER AND DRIP ENDSOF MAINS INTO WET RETURN - LOW POINTOF SUPPLY MAIN TO BE NOT LESS THAN 28"ABOVE WATER LINEMINIMUM PIPE SIZEMST288 / MST396 / MST513 MST629PIPE DISCHARGE TO WITHIN 6"OF FLOOR OR DRAINRISERKEEP COLD BOILERFILLED TO NORMALWATER LINEN.W.L.24" MINSAFETY VALVERISEREQUALIZERGLOBE VALVE31 1/8 (MIN)31 7/8 (MAX)WATERMETERFLOORLINE2" GRAVITYRETURNBOILERMAKE-UPWATERREAR OFBOILERRETURNNOTE: FOR BEST PERFORMANCE, TWO RISERSARE STRONGLY RECOMMENDEDSUPPLY MAIN TO BE TAKEN OFF TOP OFHEADER VERTICALLY OR AT A 45° ANGLE24" MINADDITIONAL SUPPLY MAINS(AS REQUIRED)HARTFORD RETURNCONNECTIONPREFERRED PIPINGALTERNATE PIPINGTEECLOSE OR SHOULDERNIPPLE ONLYGATE VALVESTEAM-WET RETURNPITCH DOWN TO BOILERPROVIDE DRAIN VALVES FORFLUSHING BOILER AND SYSTEMN.W.L.ALTERNATE PIPING METHOD27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!