12.07.2015 Views

NOxBOXi Operating Instructions - Bedfont Scientific

NOxBOXi Operating Instructions - Bedfont Scientific

NOxBOXi Operating Instructions - Bedfont Scientific

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

®NOxBOX i<strong>Operating</strong> <strong>Instructions</strong>1 23 4Cylinder replacementEngage trolley brakes tostabilise system prior tochanging cylinder.Fully close cylinder valve.Detach hose from monitor anddepressurise on purge needle.Remove regulator from emptycylinder.5678Remove empty cylinder fromtrolley and replace with newsupply cylinder. Check theconcentration matches thevalue displayed on-screen.Attach regulator to newcylinder.Perform a leak test slowly.Perform a leak test: open the cylinder valveOpen thenthe close.cylindervalve thenclose. Observe gauge for 30Observe gauge for 30 seconds, needle should remainseconds, needle should stationary.remain sta>onary. Purge pressure from hose,then reconnect the hose toinlet port monitor. Open valveon cylinder fully.6www.bedfont.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!