ItemNo.Description of work Unit Qty Rate(Rs.)Amount(Rs.)4 Providing hard core with stoneboulders soling including laying,packing, filling, interstices with goodquality spalls, dry and wet mechanicalmeans, binding with good qualitymoorum / sand with all bye workscomplete for soling as perspecifications and instructions ofEngineer in charge.5 Providing and laying in position plaincement concrete 1:4:8 using 40mmand down size graded granite metal,concrete laid in layers not exceeding15 cms thick, including shuttering,labour, etc., well compacting,ramming, curing etc., complete as perinstructions of Engineer in-charge.6 Material and labour complete for theconstruction of random rubblemasonry in CM 1:6 for foundation andwalls (to match the existing level ofthe foundation as well as wall top) upto a height of 4 M. includingexpansion of joints, lead and lift up to4 mts above the ground, scaffoldingetc. as directed by Engineer-incharge.7 Labour complete for the constructionof random rubble masonry in CM 1:6with dismantled stone of existing wallfor foundation and walls (to match theexisting level of the foundation as wellas wall top) up to a height of 4 M.including expansion of joints, lead andlift up to 4 mts above the ground,scaffolding etc. as directed byEngineer-in-charge.Cu. M 72Cu. M 60Cu. M 200Cu. M 50012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!