13.00 QUARRIES AND APPROACH ROAD13.01 Where required, CONTRACTOR shall locate suitable quarries for stone aggregate, sand and borrow areaand satisfy himself of the quality and quantity of the materials required for construction. CONTRACTORshall make his own arrangements for obtaining the quarries and establish source of required materials ofappropriate quality.13.02 CONTRACTOR shall not extract any materials from OWNER‟s land except with the prior written consent ofOWNER. Permission to quarry materials from OWNER‟s land for bonafide use of the works may be givento the extent of the quantities available at the sole discretion of OWNER, failing which the Contractor shallmake his own arrangements.13.03 Washing of sand/gravel, stone aggregate for concrete/filter material shall be done where the percentage ofdeleterious materials is more than that specified in the Bureau of Indian Standards (BIS) specification.13.04 <strong>The</strong> approach roads to work site, quarries, borrow areas and dumping areas should be laid /provided andmaintained by CONTRACTOR, wherever necessary, at his cost.13.05 Removal of overburden in quarries and its disposal, wherever necessary shall be done by CONTRACTORat his cost, in conformity with the direction of the ENGINEER/State Authorities as applicable.13.06 Construction of roads and/or the use of existing roads by CONTRACTOR for the transportation ofmaterials, machinery, supplies, fuels etc., and to serve for all his other requirements to and from the Worksite or on the work, shall have the prior approval of ENGINEER/State Authority.14.00 COMMUNICATION LINES AND NATURAL WATER RESOURCES14.01 CONTRACTOR shall not close any communication lines without the permission of ENGINEER.CONTRACTOR shall also not obstruct any natural lines of drainage without the prior written approval ofENGINEER.15.00 COMMUNICATION FACILITIES15.01 CONTRACTOR shall provide, maintain and operate at his cost all communication facilities as may benecessary for safe and efficient performance of the Work.16.00 PERMITS & LICENCES16.01 CONTRACTOR shall secure and pay for all licences and permits which he may require to comply fully withall laws, ordinances and/or regulations of the proper public authorities in connection with the performanceof the Work.16.02 CONTRACTOR shall be responsible for all losses / damages and shall defend, indemnify and saveharmless OWNER and ENGINEER in accordance with Article 41 hereof. Indemnify OWNER from andagainst all damages and liability which may arise out of the failure of CONTRACTOR to secure and pay forany such licenses and permits or to comply fully with any and all applicable laws, ordinances andregulations.17.00 LEVIES FOR ENTRY INTO PORT AREA AT MANGALORE17.01 It is the responsibility of CONTRACTOR to pay the Port authorities the charges levied for entry of menand vehicles into Port area at the rates fixed by them.18.00 MATERIALS18.01 <strong>The</strong> work is for complete job including labour and supply of all materials. Unless otherwise specified,CONTRACTOR shall make his own arrangements for cement, steel, stone ballast, stones, stone chips,sand and other construction materials as required for satisfactory completion of the Work.18.02 In case of materials supplied by OWNER, the CONTRACTOR shall ensure that only the requiredquantities of materials are indented and got issued. Any such materials remaining unused and in perfectlygood condition at the time of completion or termination of the contract shall be returned to OWNER at a46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!