12.07.2015 Views

Comments on Draft 7 SERC UFLS Standard_PRC-006-SERC-01_ ...

Comments on Draft 7 SERC UFLS Standard_PRC-006-SERC-01_ ...

Comments on Draft 7 SERC UFLS Standard_PRC-006-SERC-01_ ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1Comment Form for: <strong>Draft</strong> 7 of the <strong>SERC</strong> Underfrequency Load Shedding (<strong>UFLS</strong>)Regi<strong>on</strong>al Reliability <strong>Standard</strong> (<strong>PRC</strong>-<strong>006</strong>-<strong>SERC</strong>-<strong>01</strong>)Please use this form to submit comments <strong>on</strong> <strong>Draft</strong> 7 of the <strong>SERC</strong> <strong>UFLS</strong> Regi<strong>on</strong>al Reliability<strong>Standard</strong>. <str<strong>on</strong>g>Comments</str<strong>on</strong>g> must be submitted by March 24, 2<strong>01</strong>1. You must submit the completedform by e-mailing it to the <strong>SERC</strong> manager of Reliability <strong>Standard</strong>s at regstd@serc1.org withthe words <strong>SERC</strong> <strong>UFLS</strong> in the subject line. If you have questi<strong>on</strong>s, please c<strong>on</strong>tact Pat Huntley(704-940-8228) or phuntley@serc1.org.DO:DO NOT:Do use punctuati<strong>on</strong> and capitalizati<strong>on</strong> as needed.Do use more than <strong>on</strong>e form if resp<strong>on</strong>ses do not fit in the spaces provided.Do submit any formatted text or markups in a separate WORD file.Do not submit a resp<strong>on</strong>se in an unprotected copy of this form.Commenter Informati<strong>on</strong>Group Name (if applicable): Domini<strong>on</strong>C<strong>on</strong>tact Name:Louis SladeOrganizati<strong>on</strong>:Electric Market PolicyTeleph<strong>on</strong>e: 804-819-2871Email:louis.slade@dom.comBackground:<strong>SERC</strong> plans to develop regi<strong>on</strong>al reliability standards as required to supplement NERCstandards using the <strong>SERC</strong> Regi<strong>on</strong>al <strong>Standard</strong>s Development Procedure. Development ofthese standards will be in accordance with NERC’s schedule. This includes development ofa <strong>SERC</strong> regi<strong>on</strong>al standard addressing <strong>UFLS</strong>.From July 2, 2008 through August 15, 2008, NERC posted for comments draft requirementsfor regi<strong>on</strong>al <strong>UFLS</strong> standards in a document titled, “<strong>UFLS</strong> Regi<strong>on</strong>al Reliability <strong>Standard</strong>Characteristics.” From April 21, 2009 through May 21, 2009, NERC posted for commentsthe sec<strong>on</strong>d draft of the <strong>UFLS</strong> program requirements, including a proposed c<strong>on</strong>tinent-widestandard. <strong>Draft</strong> 3 of the NERC standard was posted for a 35-day comment period from June11, 2<strong>01</strong>0 through July 16, 2<strong>01</strong>0, with an initial ballot the last 10 days of the period. <strong>Draft</strong> 3was not approved. <strong>Draft</strong> 4 was developed in resp<strong>on</strong>se to the comments received, and wasballoted from July 24, 2<strong>01</strong>0 through August 3, 2<strong>01</strong>0. <strong>Draft</strong> 4 was not approved. The NERCstandard drafting team developed <strong>Draft</strong> 5 of the standard and posted it for ballot. The ballotpassed and the NERC Board of Trustees subsequently approved the standard <strong>on</strong>November 4, 2<strong>01</strong>0.Notes for draft <strong>SERC</strong> <strong>UFLS</strong> <strong>Standard</strong>;<strong>Draft</strong> 1 of the <strong>SERC</strong> <strong>UFLS</strong> standard <strong>on</strong>ly c<strong>on</strong>tained the applicability secti<strong>on</strong> and therequirements. It was posted for comments from September 19, 2008 through October 20,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!