13.07.2015 Views

Margaret Thornton - Fraser Valley Regional District

Margaret Thornton - Fraser Valley Regional District

Margaret Thornton - Fraser Valley Regional District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ekset Contracting Ltd.Page 11 a f 11Permit No.G-7-118Thrusday ApriJ 12. 201235. Upon completion of resource extraction activities: unless otherwise stated by theChief Inspector;i. all machinery, equipment and building superstructures shall be removed,11. concrete foundations shall be covered and revegetated unless, because ofdemonstrated impracticality, they have been exempted by the Inspector,andiii.iv.all scrap material shall be removed from the site and disposed of in anappropriate manner.Pit walls, residual stockpiles and waste dumps shall be contoured to slopesno steeper than 2:1 (2 horizontal to I vertical).v. Natural drainages shall be re-established.VI.Access roads and the pit floor shall be ditched and scarified whereapplicable.vii.Enclosed drainage structures shall be removed and replaced with stableself maintaining installation.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!