NNSA Summary by AppropriationFY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015Office of the AdministratorOffice of the Administrator 415,878 418,074 448,267 426,424 430,726 435,069 448,498Congressionally Directed Projects 23,312 13,000 0 0 0 0 0Use of Prior Year Balances 0 -10,320 0 0 0 0 0Total, Office of the Administrator 439,190 420,754 448,267 426,424 430,726 435,069 448,498Weapons Activities AppropriationDefense ProgramsDirected Stockpile Work 1,590,152 1,505,859 1,898,379 1,900,736 1,999,470 2,240,139 2,346,254Science Campaign 316,690 295,646 365,222 397,460 418,823 416,199 394,766Engineering Campaign 150,000 150,000 141,920 149,737 134,996 144,920 145,739Inertial Confinement Fusion Ignition and High Yield Campaign 436,915 457,915 481,548 480,451 475,597 470,994 484,812Advanced Simulation and Computing Campaign 556,125 567,625 615,748 622,940 616,257 615,420 633,134Readiness Campaign 160,620 100,000 112,092 81,697 70,747 69,854 72,584Readiness in Technical Base and Facilities 1,674,406 1,842,870 1,848,970 1,872,546 1,841,325 1,926,568 1,997,764Secure Transportation Asset 214,439 234,915 248,045 251,272 249,456 252,869 261,521Total, Defense Programs 5,099,347 5,154,830 5,711,924 5,756,839 5,806,671 6,136,963 6,336,574<strong>Nuclear</strong> Counterterrorism Incident Response 215,278 221,936 233,134 222,914 222,508 235,300 237,986Facilities and Infrastructure Recapitalization Program 147,449 93,922 94,000 94,000 94,000 0 0Site Stewardship 0 61,288 105,478 101,929 103,536 174,071 205,802Environmental Projects and Operations 38,596 0 0 0 0 0 0Safeguards and <strong>Security</strong>Defense <strong>Nuclear</strong> <strong>Security</strong> 735,208 769,044 719,954 730,944 729,609 728,925 740,649Cyber <strong>Security</strong> 121,286 122,511 124,345 126,046 125,822 125,707 127,189Subtotal, Safeguards and <strong>Security</strong> 856,494 891,555 844,299 856,990 855,431 854,632 867,838Science, Technology and Engineering Capability 30,000 0 20,000 0 0 0 0Congressionally Directed Projects 22,836 3,000 0 0 0 0 0Use of Prior Year Balances 0 -42,100 0 0 0 0 0Total, Weapons Activities 6,410,000 6,384,431 7,008,835 7,032,672 7,082,146 7,400,966 7,648,200Defense <strong>Nuclear</strong> NonproliferationNonproliferation and Verification Research and Development 356,281 317,300 351,568 315,941 317,558 328,194 351,145Nonproliferation and International <strong>Security</strong> 150,000 187,202 155,930 161,083 165,275 169,861 181,741International <strong>Nuclear</strong> Materials Protection and Cooperation 460,592 572,050 590,118 570,798 561,790 558,492 623,670Elimination of Weapons-Grade Plutonium Production 141,299 24,507 0 0 0 0 0Fissile Materials Disposition 41,774 701,900 1,030,713 859,375 1,010,642 789,558 743,600Global Threat Reduction Initiative 404,640 333,500 558,838 599,994 659,926 987,138 1,056,172Congressionally Directed Projects 1,903 250 0 0 0 0 0Use of Prior Year Balances -11,418 0 0 0 0 0 0Total, Defense <strong>Nuclear</strong> Nonproliferation 1,545,071 2,136,709 2,687,167 2,507,191 2,715,191 2,833,243 2,956,328Naval ReactorsNaval Reactors 828,054 945,133 1,070,486 1,099,734 1,171,178 1,226,017 1,310,530Total, Naval Reactors 828,054 945,133 1,070,486 1,099,734 1,171,178 1,226,017 1,310,530Total, NNSA 9,222,315 9,887,027 11,214,755 11,066,021 11,399,241 11,895,295 12,363,556Transfer of Prior Year Balances (Office of the Administrator) -10,000Total, NNSA (OMB Scoring) 9,877,027<strong>National</strong> <strong>Nuclear</strong> <strong>Security</strong> <strong>Administration</strong>/OverviewPage 14FY 2011 Congressional <strong>Budget</strong>
Site Estimates(Dollars in Thousands)FY 2009 FY 2010FY 2011Site Omnibus Approp OA WA NN NR TotalAmes 236 435 0 0 420 0 420ANL 45,501 53,527 0 2,412 63,835 0 66,247BAPL 418,700 434,400 0 0 0 498,900 498,900BNL 39,135 28,350 0 1,876 38,165 0 40,041CH 38,962 15,404 0 14,236 0 0 14,236GA 15,707 22,100 0 22,500 0 0 22,500HQ 355,401 515,174 248,681 356,596 18,712 24,086 648,075ID 1,237 1,299 0 1,364 0 0 1,364INL 212,786 186,457 0 9,945 133,456 93,400 236,801KAPL 302,800 391,800 0 0 0 434,900 434,900KCP 456,103 461,995 0 532,949 2,439 0 535,388KSO 6,106 5,881 7,078 0 0 0 7,078LANL 1,563,230 1,488,040 0 1,636,838 233,537 0 1,870,375LASO 19,874 19,805 20,021 0 0 0 20,021LBNL 6,541 5,717 0 0 5,506 0 5,506LLNL 1,121,277 1,077,345 0 1,051,070 108,755 0 1,159,825LSO 18,564 18,914 19,759 0 0 0 19,759NBL 1,150 3,769 0 221 988 0 1,209NETL 3,359 1,050 0 0 0 0 0NRL 6,027 2,104 0 2,060 0 0 2,060NRLFO 0 18,300 0 0 0 19,200 19,200NS 755,064 618,382 81,414 265,055 235,866 0 582,335NTS 288,259 265,159 0 228,669 106,570 0 335,239NVSO 105,937 103,627 19,485 78,495 0 0 97,980OR 215 240 0 0 223 0 223ORISE 13,819 15,663 0 15,007 3,473 0 18,480ORNL 183,016 183,901 0 5,874 276,717 0 282,591OSTI 631 773 0 771 0 0 771PN 10,905 0 0 0 0 0 0PNNL 237,219 330,140 0 11,834 281,185 0 293,019PSO 12,813 12,902 14,396 0 0 0 14,396PX 526,567 534,706 0 532,317 218 0 532,535RL 1,463 1,385 0 1,418 0 0 1,418RSL 0 0 0 0 9,464 0 9,464SNL 1,165,794 1,124,875 0 1,141,953 187,275 0 1,329,228SR 34,130 134,356 0 0 217,408 0 217,408SR/MOX 0 494,238 0 0 465,788 0 465,788SR/WGI 0 0 0 0 80,000 0 80,000SRNL 2,216 2,100 0 1,650 0 0 1,650SRS 247,367 335,782 0 191,685 147,529 0 339,214SRSO 31,176 7,750 6,194 1,516 0 0 7,710SSO 14,611 14,352 15,217 0 0 0 15,217ST 8,245 0 0 0 0 0 0UR/LLE 55,370 59,939 0 62,477 0 0 62,477Y-12 866,573 907,227 0 832,343 53,073 0 885,416YSO 39,647 40,084 16,022 5,704 16,565 0 38,291PYBal -11,418 -52,420 — 0 0 0 0Grand Total 9,222,315 9,887,027 448,267 7,008,835 2,687,167 1,070,486 11,214,755<strong>National</strong> <strong>Nuclear</strong> <strong>Security</strong> <strong>Administration</strong>/OverviewPage 15FY 2011 Congressional <strong>Budget</strong>
- Page 1: DOE/CF-0047Volume 1Department of En
- Page 5 and 6: Office of the AdministratorWeapons
- Page 7 and 8: Volume 1Table of ContentsPageApprop
- Page 9 and 10: Department of EnergyAppropriation A
- Page 11 and 12: National Nuclear Security Administr
- Page 13 and 14: The NNSA is funded through four app
- Page 15 and 16: Although no change to the existing
- Page 17 and 18: and the intensive process of tuning
- Page 19: The U.S. continues to work with the
- Page 24 and 25: Outyear Direct-Funded Maintenance a
- Page 26 and 27: Office of theAdministratorPage 20
- Page 28 and 29: Page 22
- Page 30 and 31: accountable organization through th
- Page 33 and 34: Significant Program Shifts• Begin
- Page 35 and 36: Office of the AdministratorFunding
- Page 37 and 38: (dollars in thousands)FY 2009 FY 20
- Page 39 and 40: Historically Black Colleges and Uni
- Page 41 and 42: Funding Profile by Category(dollars
- Page 43 and 44: Funding Profile by Category (contin
- Page 45 and 46: Congressional Directed ProjectsFund
- Page 47 and 48: Weapons ActivitiesPage 41
- Page 49 and 50: Table of ContentsPageAppropriation
- Page 51 and 52: Weapons ActivitiesProposed Appropri
- Page 53 and 54: Weapons ActivitiesOverviewAppropria
- Page 55 and 56: In addition, select programs within
- Page 57 and 58: The NNSA will continue to meet tran
- Page 59 and 60: FY 2009ActualAppropriationFY 2010Cu
- Page 61 and 62: simulation capability, and certific
- Page 63 and 64: FY 2009ActualAppropriationFY 2010Cu
- Page 65 and 66: Directed Stockpile WorkFunding Prof
- Page 67 and 68: DSW also interfaces with other miss
- Page 69 and 70: Weapons Systems Cost DataA classifi
- Page 71 and 72:
FY 2009 AccomplishmentsLife Extensi
- Page 73 and 74:
defined in Section 3113 (a)(2) of t
- Page 75 and 76:
(dollars in thousands)FY 2009 FY 20
- Page 77 and 78:
(dollars in thousands)FY 2009 FY 20
- Page 79 and 80:
(dollars in thousands)FY 2009 FY 20
- Page 81 and 82:
(dollars in thousands)FY 2009 FY 20
- Page 83 and 84:
(dollars in thousands)FY 2009 FY 20
- Page 85 and 86:
FY 2011 vs.FY 2010($000)• W78 Sto
- Page 87 and 88:
FY 2011 vs.FY 2010($000)• Plutoni
- Page 89 and 90:
Major Item of EquipmentMajor Items
- Page 91 and 92:
Science CampaignFunding Profile by
- Page 93 and 94:
The Advanced Radiography subprogram
- Page 95 and 96:
Performance IndicatorsFY 2006Result
- Page 97 and 98:
Certification includes the accompli
- Page 99 and 100:
(dollars in thousands)FY 2009 FY 20
- Page 101 and 102:
Explanation of Funding ChangesAdvan
- Page 103 and 104:
Engineering CampaignFunding Profile
- Page 105 and 106:
ensure that the proper investment i
- Page 107 and 108:
Performance IndicatorsFY 2006Result
- Page 109 and 110:
FY 2009 AccomplishmentsEnhanced Sur
- Page 111 and 112:
Detailed Justification(dollars in t
- Page 113 and 114:
Explanation of Funding ChangesFY 20
- Page 115 and 116:
Inertial Confinement Fusion Ignitio
- Page 117 and 118:
schedule, and budget baseline. Repo
- Page 119 and 120:
Annual Performance Results and Targ
- Page 121 and 122:
Performance IndicatorsFY 2006Result
- Page 123 and 124:
schedule. Cryogenic layers meeting
- Page 125 and 126:
The ICF Campaign will continue to p
- Page 127 and 128:
(dollars in thousands)FY 2009 FY 20
- Page 129 and 130:
IgnitionExplanation of Funding Chan
- Page 131 and 132:
Advanced Simulation and Computing C
- Page 133 and 134:
Additionally, the ASC program and t
- Page 135 and 136:
Performance IndicatorsFY 2006Result
- Page 137 and 138:
Major Out-year Priorities and Assum
- Page 139 and 140:
(dollars in thousands)FY 2009 FY 20
- Page 141 and 142:
(dollars in thousands)FY 2009 FY 20
- Page 143 and 144:
Capital Operating Expenses and Cons
- Page 145 and 146:
Readiness CampaignFunding Profile b
- Page 147 and 148:
Annual Performance Results and Targ
- Page 149 and 150:
FY 2009 AccomplishmentsStockpile Re
- Page 151 and 152:
Detailed Justification(dollars in t
- Page 153 and 154:
(dollars in thousands)FY 2009 FY 20
- Page 155 and 156:
Advanced Design and Production Tech
- Page 157 and 158:
Major Item of EquipmentMajor Items
- Page 159 and 160:
Readiness in Technical Base and Fac
- Page 161 and 162:
Construction/Execution Readiness EI
- Page 163 and 164:
Performance IndicatorsFY 2006Result
- Page 165 and 166:
Detailed Justification(dollars in t
- Page 167 and 168:
(dollars in thousands)FY 2009 FY 20
- Page 169 and 170:
(dollars in thousands)FY 2009 FY 20
- Page 171 and 172:
(dollars in thousands)FY 2009 FY 20
- Page 173 and 174:
(dollars in thousands)FY 2009 FY 20
- Page 175 and 176:
Institutional Site SupportFY 2011 v
- Page 177 and 178:
Capital Operating Expenses and Cons
- Page 179 and 180:
TotalEstimatedCost (TEC)(dollars in
- Page 181 and 182:
11-D-801, TA-55 Reinvestment Projec
- Page 183 and 184:
TRP II Overall Scope: Consists of s
- Page 185 and 186:
(dollars in thousands)Appropriation
- Page 187 and 188:
7. Schedule of Total Project CostsF
- Page 189 and 190:
08-D-802, High Explosive Pressing F
- Page 191 and 192:
5. Financial Schedule(dollars in th
- Page 193 and 194:
(dollars in thousands)Appropriation
- Page 195 and 196:
07-D-140 Project Engineering and De
- Page 197 and 198:
07-01: Consolidate and Renovate Com
- Page 199 and 200:
(dollars in thousands)Appropriation
- Page 201 and 202:
7. Schedule of Total Project CostsF
- Page 203 and 204:
06-D-140, Project Engineering and D
- Page 205 and 206:
TA-55 Reinvestment (TRP) Phase I ha
- Page 207 and 208:
06-02: TA-55 Reinvestment Project P
- Page 209 and 210:
Fiscal Year Appropriations Obligati
- Page 211 and 212:
(dollars in thousands)PreviousTotal
- Page 213 and 214:
06-D-141, Uranium Processing Facili
- Page 215 and 216:
The UPF will reduce annual operatin
- Page 217 and 218:
(dollars in thousands)Appropriation
- Page 219 and 220:
7. Schedule of Total Project CostsF
- Page 221 and 222:
04-D-125, Chemistry and Metallurgy
- Page 223 and 224:
RLOUB Facility(dollars in thousands
- Page 225 and 226:
The project is being conducted in a
- Page 227 and 228:
(dollars in thousands)Appropriation
- Page 229 and 230:
(dollars in thousands)Appropriation
- Page 231 and 232:
(dollars in thousands)Appropriation
- Page 233 and 234:
7. Schedule of Total Project Costs(
- Page 235 and 236:
over a million and a half square fe
- Page 237 and 238:
Secure Transportation AssetOverview
- Page 239 and 240:
Annual Performance Results and Targ
- Page 241 and 242:
Secure Transportation AssetOperatio
- Page 243 and 244:
(dollars in thousands)FY 2009 FY 20
- Page 245 and 246:
Capital Operating Expenses and Cons
- Page 247 and 248:
Detailed Justification(dollars in t
- Page 249 and 250:
Nuclear Counterterrorism Incident R
- Page 251 and 252:
Annual Performance Results and Targ
- Page 253 and 254:
FY 2009 Accomplishments• Deployed
- Page 255 and 256:
Detailed Justification(dollars in t
- Page 257 and 258:
(dollars in thousands)FY 2009 FY 20
- Page 259 and 260:
(dollars in thousands)FY 2009 FY 20
- Page 261 and 262:
FY 2011 vs.FY 2010($000)Nuclear Cou
- Page 263 and 264:
Facilities and Infrastructure Recap
- Page 265 and 266:
Annual Performance Results and Targ
- Page 267 and 268:
Annual Performance Results and Targ
- Page 269 and 270:
(dollars in thousands)FY 2009 FY 20
- Page 271 and 272:
Capital Operating Expenses and Cons
- Page 273 and 274:
Site StewardshipFunding Profile by
- Page 275 and 276:
Annual Performance Results and Targ
- Page 277 and 278:
FY 2009 AccomplishmentsThe Site Ste
- Page 279 and 280:
(dollars in thousands)FY 2009 FY 20
- Page 281 and 282:
Capital Operating Expenses and Cons
- Page 283 and 284:
11-D-601, Sanitary Effluent Reclama
- Page 285 and 286:
Project JustificationThe primary ju
- Page 287 and 288:
Total Estimated Cost (TEC)6. Detail
- Page 289 and 290:
Environmental Projects and Operatio
- Page 291 and 292:
Safeguards and SecurityFunding Prof
- Page 293 and 294:
Defense Nuclear SecurityFunding Pro
- Page 295 and 296:
FY 2009 AccomplishmentsZero-Based S
- Page 297 and 298:
Detailed Justification(dollars in t
- Page 299 and 300:
(dollars in thousands)FY 2009 FY 20
- Page 301 and 302:
• Program ManagementFY 2011 vs.FY
- Page 303 and 304:
08-D-701, Nuclear Materials Safegua
- Page 305 and 306:
5. Financial Schedule(dollars in th
- Page 307 and 308:
Total Estimated Cost (TEC)6. Detail
- Page 309 and 310:
y a dedicated project team and mini
- Page 311 and 312:
Cyber SecurityFunding Profile by Su
- Page 313 and 314:
Annual Performance Results and Targ
- Page 315 and 316:
Detailed Justification(dollars in t
- Page 317 and 318:
• Cyber Security (Homeland Securi
- Page 319 and 320:
Science, Technology and Engineering
- Page 321 and 322:
Annual Performance Results and Targ
- Page 323 and 324:
Detailed Justification(dollars in t
- Page 325 and 326:
Explanation of Funding ChangesFY 20
- Page 327 and 328:
Congressionally Directed ProjectsFu
- Page 329 and 330:
Defense NuclearNonproliferationPage
- Page 331 and 332:
Table of ContentsPageAppropriation
- Page 333 and 334:
Defense Nuclear NonproliferationPro
- Page 335 and 336:
Defense Nuclear NonproliferationOve
- Page 337 and 338:
PerformanceAll of the programs with
- Page 339 and 340:
NNSA's Next Generation Safeguards I
- Page 341 and 342:
worldwide. GTRI directly supports t
- Page 343 and 344:
summary level to help senior manage
- Page 345 and 346:
Historically Black Colleges and Uni
- Page 347 and 348:
Nonproliferation and Verification R
- Page 349 and 350:
Annual Performance Results and Targ
- Page 351 and 352:
FY 2009 Accomplishments• Complete
- Page 353 and 354:
(dollars in thousands)FY 2009 FY 20
- Page 355 and 356:
Capital Operating Expenses and Cons
- Page 357 and 358:
Nonproliferation and International
- Page 359 and 360:
Annual Performance Results and Targ
- Page 361 and 362:
FY 2009 AccomplishmentsNuclear Safe
- Page 363 and 364:
The NIS funding profile also will p
- Page 365 and 366:
(dollars in thousands)FY 2009 FY 20
- Page 367 and 368:
(dollars in thousands)FY 2009 FY 20
- Page 369 and 370:
(dollars in thousands)FY 2009 FY 20
- Page 371 and 372:
(dollars in thousands)FY 2009 FY 20
- Page 373 and 374:
• Dismantlement and TransparencyE
- Page 375 and 376:
International Nuclear Materials Pro
- Page 377 and 378:
sustainability planning, nuclear se
- Page 379 and 380:
Performance Indicatorsconverted to
- Page 381 and 382:
Detailed Justification(dollars in t
- Page 383 and 384:
(dollars in thousands)FY 2009 FY 20
- Page 385 and 386:
(dollars in thousands)FY 2009 FY 20
- Page 387 and 388:
(dollars in thousands)FY 2009 FY 20
- Page 389 and 390:
• Second Line of DefenseFY 2011 v
- Page 391 and 392:
Elimination of Weapons-Grade Pluton
- Page 393 and 394:
Annual Performance Results and Targ
- Page 395 and 396:
FY 2009 Accomplishments• The Seve
- Page 397 and 398:
Explanation of Funding ChangesZhele
- Page 399 and 400:
Fissile Materials DispositionFundin
- Page 401 and 402:
Annual Performance Results and Targ
- Page 403 and 404:
Detailed Justification(dollars in t
- Page 405 and 406:
(dollars in thousands)FY 2009 FY 20
- Page 407 and 408:
(dollars in thousands)FY 2009 FY 20
- Page 409 and 410:
U.S. Surplus Fissile Materials Disp
- Page 411 and 412:
Capital Operating Expenses and Cons
- Page 413 and 414:
99-D-143, Mixed Oxide Fuel Fabricat
- Page 415 and 416:
3. Baseline and Validation Status(d
- Page 417 and 418:
(dollars in thousands)Appropriation
- Page 419 and 420:
6. Details of Project Cost Estimate
- Page 421 and 422:
10. Acquisition ApproachThe procure
- Page 423 and 424:
99-D-141-02, Waste Solidification B
- Page 425 and 426:
(dollars in thousands)TEC, TEC,OPC
- Page 427 and 428:
Other Project Cost (OPC)(dollars in
- Page 429 and 430:
FY 2008FY 2009PerformanceBaseline(d
- Page 431 and 432:
99-D-141-01, Pit Disassembly and Co
- Page 433 and 434:
CD-0 - Approve Mission NeedCD-1 - A
- Page 435 and 436:
project and design efforts will be
- Page 437 and 438:
(dollars in thousands)Appropriation
- Page 439 and 440:
7. Schedule of Total Project Costs(
- Page 441 and 442:
Global Threat Reduction Initiative
- Page 443 and 444:
applications. The Convert subprogra
- Page 445 and 446:
Performance Results and Targets(R =
- Page 447 and 448:
Detailed Justification(dollars in t
- Page 449 and 450:
(dollars in thousands)FY 2009 FY 20
- Page 451 and 452:
HEU Reactor ConvertExplanation of F
- Page 453 and 454:
Congressionally Directed ProjectsFu
- Page 455 and 456:
Naval ReactorsPage 449
- Page 457 and 458:
Naval ReactorsProposed Appropriatio
- Page 459 and 460:
Naval ReactorsOverviewAppropriation
- Page 461 and 462:
Annual Performance Results and Targ
- Page 463 and 464:
training, and logistics. Headquarte
- Page 465 and 466:
Department of Energy Working Capita
- Page 467 and 468:
Detailed Justification(dollars in t
- Page 469 and 470:
(dollars in thousands)FY 2009 FY 20
- Page 471 and 472:
(dollars in thousands)FY 2009 FY 20
- Page 473 and 474:
(dollars in thousands)FY 2009 FY 20
- Page 475 and 476:
(dollars in thousands)FY 2009 FY 20
- Page 477 and 478:
Explanation of Funding ChangesFY 20
- Page 479 and 480:
Capital Operating Expenses and Cons
- Page 481 and 482:
Outyear Major Items of Equipment(do
- Page 483 and 484:
Outyear Funding Profile by Category
- Page 485 and 486:
Explanation of Funding ChangesFY 20
- Page 487 and 488:
10-D-904, Naval Reactors Facility (
- Page 489 and 490:
(dollars in thousands)Prior Years F
- Page 491 and 492:
10-D-903, KSO Security Upgrades, Sc
- Page 493 and 494:
(dollars in thousands)Prior Years F
- Page 495 and 496:
09-D-902, Naval Reactors Facility (
- Page 497 and 498:
(dollars in thousands)Appropriation
- Page 499 and 500:
FY 2009PerformanceBaseline7. Schedu
- Page 501 and 502:
08-D-190, Expended Core Facility (E
- Page 503 and 504:
(dollars in thousands)Appropriation
- Page 505 and 506:
FY 2009PerformanceBaseline7. Schedu
- Page 507 and 508:
07-D-190, Materials Research and Te
- Page 509 and 510:
5. Financial ScheduleTotal Estimate
- Page 511 and 512:
FY 2009PerformanceBaseline(dollars
- Page 513 and 514:
Site Funding Summary(dollars in tho
- Page 515 and 516:
FUNDING BY PROGRAM:BETTIS ATOMIC PO
- Page 517 and 518:
FUNDING BY PROGRAM:KANSAS CITY PLAN
- Page 519 and 520:
ACTIVITIES:Directed Stockpile Work
- Page 521 and 522:
Cyber SecurityThe NNSA Cyber Securi
- Page 523 and 524:
ACTIVITIES:Naval ReactorsThe KAPL
- Page 525 and 526:
OUT-YEAR FUNDING:(dollars in thousa
- Page 527 and 528:
Power (HEPP) system. Also, LLNL wil
- Page 529 and 530:
Inertial Confinement Fusion Ignitio
- Page 531 and 532:
energy goals and result in cost avo
- Page 533 and 534:
FUNDING BY PROGRAM:LOS ALAMOS NATIO
- Page 535 and 536:
The site is aligned with nuclear se
- Page 537 and 538:
As part of operations at the Metrop
- Page 539 and 540:
to effectively address current and
- Page 541 and 542:
engineers in civilian activity, red
- Page 543 and 544:
OUT-YEAR FUNDING:(dollars in thousa
- Page 545 and 546:
equipment, machined hardware, and p
- Page 547 and 548:
Global Threat Reduction Initiative
- Page 549 and 550:
OUT-YEAR FUNDING:(dollars in thousa
- Page 551 and 552:
improve facility system reliability
- Page 553 and 554:
FUNDING BY PROGRAM:SANDIA NATIONAL
- Page 555 and 556:
The SNL’s Science, Technology, an
- Page 557 and 558:
Advanced Simulation and Computing (
- Page 559 and 560:
Stabilization Operations programs,
- Page 561 and 562:
FUNDING BY PROGRAM:SAVANNAH RIVER S
- Page 563 and 564:
• Provide tritium and non-tritium
- Page 565 and 566:
Facilities and Infrastructure Recap
- Page 567 and 568:
FUNDING BY PROGRAM:Y-12 NATIONAL SE
- Page 569 and 570:
• Providing safe and secure stora
- Page 571 and 572:
• Managing legacy material dispos
- Page 573 and 574:
comprehensive GTRI approach to achi
- Page 575 and 576:
ACTIVITIES:Nuclear Counterterrorism
- Page 577 and 578:
ACTIVITIES:Nuclear Counterterrorism
- Page 579 and 580:
FUNDING BY PROGRAM:IDAHO NATIONAL L
- Page 581 and 582:
an opportunity to further develop S
- Page 583 and 584:
Site DescriptionINTRODUCTION:The Oa
- Page 585 and 586:
FUNDING BY PROGRAM:PACIFIC NORTHWES
- Page 587 and 588:
assessments, policy support and non
- Page 589 and 590:
GENERAL PROVISIONS[SEC. 301. None o
- Page 591 and 592:
"(k) WAGE RATE REQUIREMENTS.—All
- Page 593 and 594:
disbursement account to be made ava
- Page 595 and 596:
(2) ADMINISTRATIVE EXPENSES DETERMI
- Page 598:
Office of the AdministratorWeapons