- Page 1: DOE/CF-0047Volume 1Department of En
- Page 5 and 6: Office of the AdministratorWeapons
- Page 7 and 8: Volume 1Table of ContentsPageApprop
- Page 9 and 10: Department of EnergyAppropriation A
- Page 11 and 12: National Nuclear Security Administr
- Page 13 and 14: The NNSA is funded through four app
- Page 15 and 16: Although no change to the existing
- Page 17 and 18: and the intensive process of tuning
- Page 19 and 20: The U.S. continues to work with the
- Page 21: Site Estimates(Dollars in Thousands
- Page 25 and 26: Office of theAdministratorPage 19
- Page 27 and 28: Office of the AdministratorProposed
- Page 29 and 30: Office of the AdministratorOverview
- Page 31: Annual Performance Results and Targ
- Page 34 and 35: Office of the AdministratorFull Tim
- Page 36 and 37: Detailed Justification(dollars in t
- Page 38 and 39: (dollars in thousands)FY 2009 FY 20
- Page 40 and 41: Explanation of Funding ChangesFY 20
- Page 42 and 43: Funding Profile by Category (contin
- Page 44 and 45: Support Services by Category(dollar
- Page 46 and 47: Detailed Justification(dollars in t
- Page 48 and 49: Weapons ActivitiesPage 42
- Page 50 and 51: Page 44
- Page 52 and 53: Page 46
- Page 54 and 55: Outyear Appropriation Summary by Pr
- Page 56 and 57: The proposed stockpile management p
- Page 58 and 59: process and estimate. This process
- Page 60 and 61: FY 2009ActualAppropriationFY 2010Cu
- Page 62 and 63: FY 2009ActualAppropriationFY 2010Cu
- Page 64 and 65: Historically Black Colleges and Uni
- Page 66 and 67: Outyear Funding Profile by Subprogr
- Page 68 and 69: (2) Stockpile Systems; (3) Weapons
- Page 70 and 71: Annual Performance Results and Targ
- Page 72 and 73:
Stockpile Services• Met scheduled
- Page 74 and 75:
Detailed Justification(dollars in t
- Page 76 and 77:
(dollars in thousands)FY 2009 FY 20
- Page 78 and 79:
(dollars in thousands)FY 2009 FY 20
- Page 80 and 81:
(dollars in thousands)FY 2009 FY 20
- Page 82 and 83:
(dollars in thousands)FY 2009 FY 20
- Page 84 and 85:
Life Extension Programs (LEP)• W7
- Page 86 and 87:
Weapons Dismantlement and Dispositi
- Page 88 and 89:
Capital Operating Expenses and Cons
- Page 90 and 91:
Page 84
- Page 92 and 93:
the development of improved predict
- Page 94 and 95:
Annual Performance Results and Targ
- Page 96 and 97:
FY 2009 AccomplishmentsPrimary Asse
- Page 98 and 99:
Detailed Justification(dollars in t
- Page 100 and 101:
(dollars in thousands)FY 2009 FY 20
- Page 102 and 103:
Capital Operating Expenses and Cons
- Page 104 and 105:
• Consolidation of Category I/II
- Page 106 and 107:
Annual Performance Results and Targ
- Page 108 and 109:
Performance IndicatorsFY 2006Result
- Page 110 and 111:
• Updated and completed, the comp
- Page 112 and 113:
(dollars in thousands)FY 2009 FY 20
- Page 114 and 115:
Capital Operating Expenses and Cons
- Page 116 and 117:
The ICF Campaign, a vital component
- Page 118 and 119:
array of diagnostic and measurement
- Page 120 and 121:
Performance IndicatorsZ Facility Ex
- Page 122 and 123:
FY 2009 AccomplishmentsNational Ign
- Page 124 and 125:
accelerated flyer plates have been
- Page 126 and 127:
Detailed Justification(dollars in t
- Page 128 and 129:
(dollars in thousands)FY 2009 FY 20
- Page 130 and 131:
Capital Operating Expenses and Cons
- Page 132 and 133:
capabilities of these tools, such a
- Page 134 and 135:
Annual Performance Results and Targ
- Page 136 and 137:
FY 2009 AccomplishmentsPredictive C
- Page 138 and 139:
Detailed Justification(dollars in t
- Page 140 and 141:
(dollars in thousands)FY 2009 FY 20
- Page 142 and 143:
Integrated CodesExplanation of Fund
- Page 144 and 145:
Page 138
- Page 146 and 147:
prioritizing material needs and ava
- Page 148 and 149:
Performance IndicatorsNonnuclear Re
- Page 150 and 151:
• Advanced technology of the chip
- Page 152 and 153:
(dollars in thousands)FY 2009 FY 20
- Page 154 and 155:
Explanation of Funding ChangesStock
- Page 156 and 157:
Capital Operating Expenses and Cons
- Page 158 and 159:
Page 152
- Page 160 and 161:
RTBF program provides unique contri
- Page 162 and 163:
Annual Performance Results and Targ
- Page 164 and 165:
FY 2009 Accomplishments• Exceeded
- Page 166 and 167:
(dollars in thousands)FY 2009 FY 20
- Page 168 and 169:
(dollars in thousands)FY 2009 FY 20
- Page 170 and 171:
(dollars in thousands)FY 2009 FY 20
- Page 172 and 173:
(dollars in thousands)FY 2009 FY 20
- Page 174 and 175:
Operations of FacilitiesExplanation
- Page 176 and 177:
At Pantex, funding will support the
- Page 178 and 179:
TotalEstimatedCost (TEC)Constructio
- Page 180 and 181:
Outyear Construction Projects(dolla
- Page 182 and 183:
CD-0 - Approve Mission NeedCD-1 - A
- Page 184 and 185:
5. Financial Schedule(dollars in th
- Page 186 and 187:
6. Details of Project Cost Estimate
- Page 188 and 189:
Page 182
- Page 190 and 191:
D&D Start - Start of Demolition & D
- Page 192 and 193:
(dollars in thousands)Appropriation
- Page 194 and 195:
FY 2009PerformanceBaselie7. Schedul
- Page 196 and 197:
CD-0 - Approve Mission NeedCD-1 - A
- Page 198 and 199:
commissioned, and in operation at a
- Page 200 and 201:
Total Estimated Cost (TEC)6. Detail
- Page 202 and 203:
Page 196
- Page 204 and 205:
CD-0 - Approve Mission NeedCD-1 - A
- Page 206 and 207:
(dollars in thousands)Appropriation
- Page 208 and 209:
additional 25 years. The project wi
- Page 210 and 211:
06-05, Uranium Processing Facility,
- Page 212 and 213:
9. Required D&D InformationAreaArea
- Page 214 and 215:
3. Baseline and Validation StatusTE
- Page 216 and 217:
FY 2011 activities include prelimin
- Page 218 and 219:
6. Details of Project Cost Estimate
- Page 220 and 221:
and available for demolition since
- Page 222 and 223:
(fiscal quarter or date)CD-0PEDD&DC
- Page 224 and 225:
ScopeThe CMRR project consists of d
- Page 226 and 227:
RLUOB Equipment Installation (REI)(
- Page 228 and 229:
(dollars in thousands)Appropriation
- Page 230 and 231:
(dollars in thousands)Appropriation
- Page 232 and 233:
Total Estimated Cost (TEC)6. Detail
- Page 234 and 235:
9. Required D&D InformationAs direc
- Page 236 and 237:
Page 230
- Page 238 and 239:
The STA current capacity will meet
- Page 240 and 241:
FY 2009 Accomplishments• Safely a
- Page 242 and 243:
Detailed Justification(dollars in t
- Page 244 and 245:
Explanation of Funding ChangesFY 20
- Page 246 and 247:
Secure Transportation AssetProgram
- Page 248 and 249:
Explanation of Funding ChangesFY 20
- Page 250 and 251:
and strengthening relationships wit
- Page 252 and 253:
Annual Performance Results and Targ
- Page 254 and 255:
The NCTIR outyear budgets will conc
- Page 256 and 257:
(dollars in thousands)FY 2009 FY 20
- Page 258 and 259:
(dollars in thousands)FY 2009 FY 20
- Page 260 and 261:
Emergency Response (Homeland Securi
- Page 262 and 263:
Capital Operating Expenses and Cons
- Page 264 and 265:
FIRP is complementary to the ongoin
- Page 266 and 267:
Performance Indicators(Long-term Ou
- Page 268 and 269:
Detailed Justification(dollars in t
- Page 270 and 271:
Explanation of Funding ChangesFY 20
- Page 272 and 273:
Page 266
- Page 274 and 275:
accordance with regulatory requirem
- Page 276 and 277:
Performance IndicatorsFY 2006Result
- Page 278 and 279:
Detailed Justification(dollars in t
- Page 280 and 281:
Operations and Maintenance• Envir
- Page 282 and 283:
Page 276
- Page 284 and 285:
TEC,Construction3. Baseline and Val
- Page 286 and 287:
5. Financial Schedule(dollars in th
- Page 288 and 289:
7. Schedule of Total Project Costs(
- Page 290 and 291:
Page 284
- Page 292 and 293:
Estimates of Security Cost Recovere
- Page 294 and 295:
Annual Performance Results and Targ
- Page 296 and 297:
activities contained within the imp
- Page 298 and 299:
(dollars in thousands)FY 2009 FY 20
- Page 300 and 301:
Explanation of Funding ChangesDefen
- Page 302 and 303:
Capital Operating Expenses and Cons
- Page 304 and 305:
4. Project Description, Justificati
- Page 306 and 307:
(dollars in thousands)Appropriation
- Page 308 and 309:
7. Schedule of Appropriation Reques
- Page 310 and 311:
Page 304
- Page 312 and 313:
goals and outcomes for the overall
- Page 314 and 315:
FY 2009 Accomplishments• The Cybe
- Page 316 and 317:
(dollars in thousands)FY 2009 FY 20
- Page 318 and 319:
Capital Operating Expenses and Cons
- Page 320 and 321:
5. Nuclear Weapons Effects Modeling
- Page 322 and 323:
FY 2009 AccomplishmentsWhile this i
- Page 324 and 325:
(dollars in thousands)FY 2009 FY 20
- Page 326 and 327:
Capital Operating Expenses and Cons
- Page 328 and 329:
Detailed Justification(dollars in t
- Page 330 and 331:
Defense NuclearNonproliferationPage
- Page 332 and 333:
Page 326
- Page 334 and 335:
Page 328
- Page 336 and 337:
Outyear Appropriation Summary by Pr
- Page 338 and 339:
existing BN-600 and the BN-800 curr
- Page 340 and 341:
are designed to support the nonprol
- Page 342 and 343:
Validation and VerificationTo verif
- Page 344 and 345:
DOE Nuclear Nonproliferation Activi
- Page 346 and 347:
Page 340
- Page 348 and 349:
technologies, with special emphasis
- Page 350 and 351:
Performance IndicatorsFY 2006Result
- Page 352 and 353:
Detailed Justification(dollars in t
- Page 354 and 355:
Explanation of Funding ChangesFY 20
- Page 356 and 357:
Page 350
- Page 358 and 359:
the development of their nuclear in
- Page 360 and 361:
Performance IndicatorsFY 2006Result
- Page 362 and 363:
• Completed national versions of
- Page 364 and 365:
Detailed Justification(dollars in t
- Page 366 and 367:
(dollars in thousands)FY 2009 FY 20
- Page 368 and 369:
(dollars in thousands)FY 2009 FY 20
- Page 370 and 371:
(dollars in thousands)FY 2009 FY 20
- Page 372 and 373:
(dollars in thousands)FY 2009 FY 20
- Page 374 and 375:
Capital Operating Expenses and Cons
- Page 376 and 377:
BenefitsWithin INMP&C, 7 subprogram
- Page 378 and 379:
Annual Performance Results and Targ
- Page 380 and 381:
FY 2009 Accomplishments:• Complet
- Page 382 and 383:
(dollars in thousands)FY 2009 FY 20
- Page 384 and 385:
(dollars in thousands)FY 2009 FY 20
- Page 386 and 387:
(dollars in thousands)FY 2009 FY 20
- Page 388 and 389:
• Navy ComplexExplanation of Fund
- Page 390 and 391:
Capital Operating Expenses and Cons
- Page 392 and 393:
shut down more than six months ahea
- Page 394 and 395:
Performance IndicatorsFY 2006Result
- Page 396 and 397:
Detailed Justification(dollars in t
- Page 398 and 399:
Capital Operating Expenses and Cons
- Page 400 and 401:
support MOX cold start-up. An alter
- Page 402 and 403:
FY 2009 Accomplishments• Installe
- Page 404 and 405:
(dollars in thousands)FY 2009 FY 20
- Page 406 and 407:
(dollars in thousands)FY 2009 FY 20
- Page 408 and 409:
(dollars in thousands)FY 2009 FY 20
- Page 410 and 411:
FY 2011 vs.FY 2010($000)• U.S. Su
- Page 412 and 413:
Construction ProjectsTotalEstimated
- Page 414 and 415:
(fiscal quarter or date)CD-0 CD-1PE
- Page 416 and 417:
The MFFF has the following Key Perf
- Page 418 and 419:
(dollars in thousands)Appropriation
- Page 420 and 421:
FY 2009PerformanceBaseline7. Schedu
- Page 422 and 423:
Page 416
- Page 424 and 425:
2. Design, Construction, and D&D Sc
- Page 426 and 427:
5. Financial ScheduleTotal Estimate
- Page 428 and 429:
(dollars in thousands)Appropriation
- Page 430 and 431:
(Related Funding requirements)99-D-
- Page 432 and 433:
Independent Review Team (IRT) compr
- Page 434 and 435:
3. Baseline and Validation Status(d
- Page 436 and 437:
(dollars in thousands)Appropriation
- Page 438 and 439:
6. Details of Project Cost Estimate
- Page 440 and 441:
activities, program ownership, proj
- Page 442 and 443:
Outyear Funding Profile by Subprogr
- Page 444 and 445:
• International material protecti
- Page 446 and 447:
Major FY 2009 AccomplishmentsThroug
- Page 448 and 449:
(dollars in thousands)FY 2009 FY 20
- Page 450 and 451:
(dollars in thousands)FY 2009 FY 20
- Page 452 and 453:
Capital Operating Expenses and Cons
- Page 454 and 455:
Page 448
- Page 456 and 457:
Naval ReactorsPage 450
- Page 458 and 459:
Page 452
- Page 460 and 461:
BenefitsThe National Nuclear Securi
- Page 462 and 463:
Means and StrategiesThe Naval React
- Page 464 and 465:
components in FY 2017 and ship cons
- Page 466 and 467:
Naval Reactors - Operations and Mai
- Page 468 and 469:
(dollars in thousands)FY 2009 FY 20
- Page 470 and 471:
(dollars in thousands)FY 2009 FY 20
- Page 472 and 473:
(dollars in thousands)FY 2009 FY 20
- Page 474 and 475:
(dollars in thousands)FY 2009 FY 20
- Page 476 and 477:
(dollars in thousands)FY 2009 FY 20
- Page 478 and 479:
FY 2011 vs.FY 2010($000)• Plannin
- Page 480 and 481:
Outyear Construction Projects(dolla
- Page 482 and 483:
Naval Reactors - Program DirectionF
- Page 484 and 485:
Detailed Justification(dollars in t
- Page 486 and 487:
Page 480
- Page 488 and 489:
The project is being conducted in a
- Page 490 and 491:
Page 484
- Page 492 and 493:
site will acquire upgrades to the s
- Page 494 and 495:
Page 488
- Page 496 and 497:
4. Project Description, Justificati
- Page 498 and 499:
6. Details of Project Cost Estimate
- Page 500 and 501:
Page 494
- Page 502 and 503:
M-140 shipping containers. The dire
- Page 504 and 505:
(dollars in thousands)Appropriation
- Page 506 and 507:
Page 500
- Page 508 and 509:
4. Project Description, Justificati
- Page 510 and 511:
(dollars in thousands)Appropriation
- Page 512 and 513:
(Related Funding requirements)(doll
- Page 514 and 515:
FY 2009 FY 2010 FY 2011Naval Reacto
- Page 516 and 517:
ACTIVITIES:Naval ReactorsThe broad
- Page 518 and 519:
OUT-YEAR FUNDING:(dollars in thousa
- Page 520 and 521:
infrastructure services including f
- Page 522 and 523:
KNOLLS ATOMIC POWER LABORATORYFUNDI
- Page 524 and 525:
FUNDING BY PROGRAM:LAWRENCE LIVERMO
- Page 526 and 527:
establishing shared user facilities
- Page 528 and 529:
Readiness CampaignThe LLNL supports
- Page 530 and 531:
and services for atmospheric plume
- Page 532 and 533:
Nonproliferation and International
- Page 534 and 535:
OUT-YEAR FUNDING:(dollars in thousa
- Page 536 and 537:
(DARHT) 2nd axis refurbishment, the
- Page 538 and 539:
Program activities in support of nu
- Page 540 and 541:
Global Threat Reduction Initiative
- Page 542 and 543:
FUNDING BY PROGRAM:NEVADA TEST SITE
- Page 544 and 545:
ACTIVITIES:Directed Stockpile Work
- Page 546 and 547:
Site StewardshipIn FY 2011, Site St
- Page 548 and 549:
FUNDING BY PROGRAM:PANTEX PLANTTABL
- Page 550 and 551:
The Pantex Plant stores surplus pit
- Page 552 and 553:
Nonproliferation and International
- Page 554 and 555:
OUT-YEAR FUNDING:(dollars in thousa
- Page 556 and 557:
improving fabrication processes, an
- Page 558 and 559:
Laboratory). Sandia provides the pr
- Page 560 and 561:
shipping terminals within the globa
- Page 562 and 563:
OUT-YEAR FUNDING:(dollars in thousa
- Page 564 and 565:
acceptance, closer integration of a
- Page 566 and 567:
managing and providing WMD training
- Page 568 and 569:
OUT-YEAR FUNDING:(dollars in thousa
- Page 570 and 571:
Engineering CampaignThe Engineering
- Page 572 and 573:
Security Plan (SSSP). In FY 2011, a
- Page 574 and 575:
FUNDING BY PROGRAM:ARGONNE NATIONAL
- Page 576 and 577:
FUNDING BY PROGRAM:BROOKHAVEN NATIO
- Page 578 and 579:
FUNDING BY PROGRAM:CHICAGO OPERATIO
- Page 580 and 581:
Major Changes or Shifts: NoneSite D
- Page 582 and 583:
FUNDING BY PROGRAM:OAK RIDGE NATION
- Page 584 and 585:
equipment maintenance, personnel tr
- Page 586 and 587:
Site DescriptionINTRODUCTION:The Pa
- Page 588 and 589:
Page 582
- Page 590 and 591:
Water Development Appropriations Ac
- Page 592 and 593:
(2) rejected on the basis that the
- Page 594 and 595:
authority provided in this Act: Pro
- Page 596:
Page 590