13.07.2015 Views

English (7 MB) - Comprehensive Nuclear-Test-Ban Treaty ...

English (7 MB) - Comprehensive Nuclear-Test-Ban Treaty ...

English (7 MB) - Comprehensive Nuclear-Test-Ban Treaty ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MAJOR PROGRAMME 1:International Monitoring System“The International Monitoring System shall comprise facilities for seismological monitoring,radionuclide monitoring including certified laboratories, hydroacoustic monitoring,infrasound monitoring, and respective means of communication, and shall be supportedby the International Data Centre of the Technical Secretariat.”(ARTICLE IV, PARAGRAPH 16)The year 2000 saw an important advancement of the International MonitoringSystem (IMS). The site survey programme, which determines whether stationlocations shown in the <strong>Treaty</strong> are suitable, is nearing completion. Installationswere completed at 27 additional stations, and the first 11 stations werecertified as meeting all PTS technical requirements. A major effort was made todevelop efficient procedures to connect stations to the data processing pipelineof the International Data Centre (IDC). From April 2000, the PTS assumed responsibilityfor routine station management, an activity that was previously carriedout by the prototype IDC (pIDC) in the United States of America. Considerableeffort was devoted to planning long term operation and maintenanceof IMS stations.IMS COMMISSIONINGAbrief summary of the status of the commissioning in each of the IMS technologies,giving the main highlights for 2000, is presented below. The statusof the site survey and station installation programmes at the end of 2000 issummarized in Tables 1 and 2.IMS Station Type Complete/ Under Way Contract Not StartedNot RequiredPendingTable 1. Status of the Site SurveyProgramme as of 31 December 2000Primary seismic 45 0 0 5Auxiliary seismic 104 7 0 9Infrasound 41 5 4 10Hydroacoustic 6 3 1 1Radionuclide 50 10 8 12IMS Station Type Complete/ Under Way Contract Not StartedSubstantiallyPendingMeets SpecificationsPrimary seismic 20 9 0 21 aAuxiliary seismic 60 8 5 47 bInfrasound 7 16 6 31Hydroacoustic 23 0 6Radionuclide 9 15 18 38Table 2. Status of the Station InstallationProgramme as of 31 December 2000a Thirteen of these stations are operational but require someupgrades. The remaining 8 do not yet exist.bTwenty-five of these stations exist but require a major upgrade.The remaining 22 do not yet exist.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!