13.07.2015 Views

English (7 MB) - Comprehensive Nuclear-Test-Ban Treaty ...

English (7 MB) - Comprehensive Nuclear-Test-Ban Treaty ...

English (7 MB) - Comprehensive Nuclear-Test-Ban Treaty ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MAJOR PROGRAMME 4:ON-SITE INSPECTIONTESTINGAt the request of the Preparatory Commission, the PTS began to develop initialplans to conduct technical tests, as necessary, of OSI equipment that ithad obtained. On this basis the PTS commenced technical testing of the passiveSeismic Aftershock Monitoring System (SAMS) delivered to it in March 2000.The technical tests are being performed in three phases under direct PTS supervision.Phase A was undertaken at the Vienna International Centre in October,with the participation and assistance of 10 experts in field seismology and localaftershock monitoring from nine States Signatories, an observer and 5 PTS staffmembers. This also afforded an opportunity for the participants to become familiarwith the technical and system functionality of the SAMS and ensured testingtransparency as requested by the Commission. Results from these tests are beingevaluated by the PTS and will be presented in a technical report.SPECIAL ACCOUNTThe PTS proposed the establishment of a special account to facilitate the procurementof equipment, in recognition of the difficulties in completing theprocurement process within the annual budget cycle. The Preparatory Commissionapproved the proposal and an account will be established to operatefrom 2001.28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!