13.07.2015 Views

Thiess Mining Capability Brochure, 2011

Thiess Mining Capability Brochure, 2011

Thiess Mining Capability Brochure, 2011

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MOBILE PLANTCASE STUDYOPTIMALPERFORMANCEA productive mine demands the rightplant. <strong>Thiess</strong> has built a reputation fordelivering greater value and certainty byintroducing efficiencies and continuallystriving for lower cost mining methods.Using ultra-class mining equipment offersgreater economies of scale – integral tolowering costs.THE BIGGEST GEARNothing illustrates the strength of therelationship between <strong>Thiess</strong> and clientPeabody Energy Australia better than thelatest contract to operate the enduringBurton Coal Mine in North Queensland.The secret to our success at the mineis the commitment to using the biggestgear in the business. A second LiebherrR9800 is operating at the mine and beingserviced by a fleet of Caterpillar 797 dumptrucks. The result of this muscle is the costeffective removal of overburden, nearly30 per cent of which is being removedfor the second time as we go back intoareas of Burton first mined in 1996.10,000 HOURS OF TYRE LIFEThe <strong>Thiess</strong> Tyre Life Improvement Programis another example of the way our teamconstantly looks to improve performance.The program has achieved more than10,000 hours of tyre life on our Caterpillar793 haul trucks at Lake Vermont. A numberof tyres from across our sites have lastedmore than 13,000 hours.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!