13.07.2015 Views

Felix Tellez - SFERA

Felix Tellez - SFERA

Felix Tellez - SFERA

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Operating TemperaturaThermodinamic CycleAvailability of HeatstorageSTE with Central Receiver Systems F. TéllezDistinguished by the heat transfer fluid, there are threeCRS options in competence:Direct SteamGeneration< 290º C Saturated290-550 ºC Superheated550-650 ºC SupercríticRankine(or integration aspreheating in CC)¿!Presurized steam vesel~ 30 mintos(Nitrate) MoltenSaltsAtmospheric &Presurized Air565 ºC 750-900ºCRankine(or integration aspreheating in CC)YesTwo tanks(hot/cold) ~15 hRankine / Brayton(or integration in topof CC)YesPebbles Beds(termocline) ~3 hCapacity Factor (full loadequivalent) 2.200 h/year 2200 - 5.700 3.500 h/yearh/yearOverall Annual13-16 % 14-18 % 14-18 %EfficiencyEstimated cost ofelectricityCommercial Situation(actuales / potenciales)0,17-0,23€/kWh-aPS10, PS20 (Saturado),eSolar (Sobrec.)Brightsource E (Supercrit.)0,14-0,17€/kWh-aGemasolar/SolarTresRockedyne/SolarReserveAbu-Dhabi?0,13-0,16 ¿?€/kWh-a(1ª versión PS10)Pending ¡!Slide 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!