Felix Tellez - SFERA
Felix Tellez - SFERA
Felix Tellez - SFERA
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Availability‣ PS10 has been in operation almost all the 6317 sunny hours since21.06.07 up to 31.12.08.‣ Total plant availability in this period is larger than 96%.‣ Receiver availability in the period is larger than 99%.STE with Central Receiver Systems F. TéllezSlide 56