13.07.2015 Views

ILLINOIS NATURE PRESERVES COMMISSION - Illinois DNR

ILLINOIS NATURE PRESERVES COMMISSION - Illinois DNR

ILLINOIS NATURE PRESERVES COMMISSION - Illinois DNR

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Exhibit C• No more than 10 cfs of water may be pumped. A determination should be made in the field that this rateof pressure would not negatively harm aquatic fauna if they were near screened intake pipes/hoses.• The District Heritage Biologist (DHB) will determine the route of access and location for pumpplacement, electrical lines, etc.• The DHB must approve any removal of trees or other vegetation required for pump placement. If treesneed to be removed, they should be less than six inches in diameter (DBH).• The project will be reviewed by the I<strong>DNR</strong> through its Comprehensive Environmental Review Process.Citations:1Demissie, M., L. Keefer, Y. Lian, F. Yue, and B. Larson. 2008. Hydrologic and Hydraulic Modeling andAnalyses for the Cache River for the Purposes of Evaluating Current Conditions and Alternative RestorationMeasures. Center for Watershed Science, <strong>Illinois</strong> State Water Survey, Champaign, IL. 121 pp. Contract Report2008-01. Prepared for the Cache River Joint Venture Partnership.2<strong>Illinois</strong> Environmental Protection Agency. 2008. <strong>Illinois</strong> Integrated Water Quality Report and Section 303(d)List-2008. <strong>Illinois</strong> Environmental Protection Agency, Springfield, <strong>Illinois</strong>. IEPA/BOW/08-016.6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!