13.07.2015 Views

March 14, 2012 - Toho Water Authority

March 14, 2012 - Toho Water Authority

March 14, 2012 - Toho Water Authority

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

70.00Interview Summary Points60.0050.0040.0058.0847.2552.0030.0032.4220.00Bill2Pay FirsTech High Cotton SureBillKey considerations for validating the recommendation for Bill2Pay over the other vendorsinclude the following:Weighting of RFP Scoring Criteria: Pricing is a very important consideration,making up 30% of the overall ranking. However, other key criteria includingqualifications, methodology and staff comprise 70% of the score. Establishing theseweightings during RFP creation was thoughtfully done to ensure that the mostqualified firm having the highest quality solution could be selected as long as thoseadvantages outweighed the pricing differences.Explanation of Cost: Each vendor was asked to provide a Best-and-Final Offer forthe services outlined in the RFP. In order to view the costs equally, the EvaluationTeam created two scenarios to apply the vendor’s cost to. The first scenario lookedat the costs for a “typical month” for only <strong>Toho</strong> IV implementation. The secondscenario looked at the costs for a “typical month” for a full system implementation.4 | P age

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!