13.07.2015 Views

Operations Review (Part 1) - Anglo Platinum

Operations Review (Part 1) - Anglo Platinum

Operations Review (Part 1) - Anglo Platinum

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Operations</strong> <strong>Review</strong> (continued)Overview: ProcessingRustenburg Base Metals Refiners (RBMR)S A F E T Y53The LTIFR declined 40% to 0,29 in 2002. Despite this improvement, a fatalityoccurred in January 2002. The BBS initiative continued, with over 50% of personneltrained so far; this programme has also contributed toimproved employee relations across the site.B A S E M E T A L S R E F I N I N GRBMR processes Waterval Converter Matte (WCM) toproduce a precious metals concentrate, for furtherrefining at the PMR, and quality base metal final productsfor sale to customers.The two metallurgical operations, the magneticseparation plant (MC Plant) and the base metal refinery,performed well over the year with both achieving <strong>Anglo</strong><strong>Platinum</strong> record throughputs for precious and base metalsduring the year.The de-bottlenecking of the two metallurgical plants,The new steam generationfacilities at the Base MetalsRefinery have state-of-the-artlow emission designs in order toachieve excellent environmentalcompliance.the MC Plant and the Base Metal Refinery, continuedon schedule, facilitating treatment for the plannedexpansion of precious and base metals.Virtually no emissions will leavethe new steam generation facilityat RBMR’s coal fired boiler stack.50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!