13.07.2015 Views

Operations Review (Part 1) - Anglo Platinum

Operations Review (Part 1) - Anglo Platinum

Operations Review (Part 1) - Anglo Platinum

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Operations</strong> <strong>Review</strong> (continued)Overview: ProjectsPolokwane SmelterSite activities commenced in early November 2001. The smelter is now substantiallycomplete and commissioning has commenced.Slag-cleaning Furnace (Waterval Smelter)Under normal practice, slag is returned to the primaryconcentrate-smelting electric furnaces to recover containedmetal values. However, with the rising amount of UG2concentrates being treated, the recycling of chromecreates constraints in the furnaces due to the elevatedmelting point of the slag. The project has been designed toalleviate this condition, raise the recovery of the containedmetal values and create additional capacity in the primaryfurnaces.PMR ExpansionThe PMR is undergoing de-bottlenecking to enable theGroup’s 2006 target of 3,5 million annual ounces ofplatinum to be met. Construction commenced on the GoldRapid progress has been madein the construction of the newPolokwane Smelter.Solvent Extraction and Insoluble Metals plants inDecember 2002. Earthworks are complete and civilsconstruction has started. The final phase of the debottleneckingwill be completed by the end of 2005.58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!