13.07.2015 Views

Umuziwabantu Municipality IDP 2011/2012 - Ugu District Municipality

Umuziwabantu Municipality IDP 2011/2012 - Ugu District Municipality

Umuziwabantu Municipality IDP 2011/2012 - Ugu District Municipality

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UMUZIWABANTUREVIEWED INTEGRATEDDEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong>INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong>UMUZIWABANTU MUNICIPALITY1 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER 1EXECUTIVE SUMMARY1.1 Introduction and background 81.1.1 Preparation process 91.1.2 Stakeholders in the <strong>IDP</strong> Process 111.2 Legislative Background to the <strong>IDP</strong> 121.2.1 Constitution of Republic of South Africa 121.2.2 Municipals Systems Act 121.2.3 Municipal Planning and Performance Management Regulations 121.2.4 Municipal Financial Management Act 131.2.5 Disaster Management Act 131.2.6 Summary of MEC‟s Comments 14CHAPTER2MUNICIPAL PROFILE AND SITUATIONAL ANALYSIS2.1 Geographic location and size 152.2 Demographics /Population distribution 17-182.3 Socio-Economic analysis 192.3.1 Health Services 192.3.2 HIV and AIDS 202.3.3 Education 222.3.4 Other Social Services 222.3.5 Safety and Security 232.3.6 Community Facilities 242.3.7 Social Services Grant 252.3.8 Local Economic Development 26LED Strategy 26Food Security Program 27Household income 27Economic profile 28Agriculture 29Timber 30Manufacturing 31Competitiveness 322 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Tourism 332.4 BASIC SERVICES AND INFRASTRUCTURE DEVELOPMENT2.4.1 Roads and Storm Water Drainage 342.4.2 Electricity 352.4.3 Water supply 372.4.4 Sanitation 382.4.5 Housing 392.4.6 Waste Removal 41CHAPTER 33 Financial Viability 423.1 Sources of Income 423.2 Financial Viability Determinants 433.2.1.1 Cash Balances 433.2.1.2 Cash Coverage Ratio 433.2.1.3 Liquidity Ratio 433.2.2 Auditor General‟s Report 433.3 Financial Plan 443.3.1 Return on Investments 453.3.2 Expenditure and income 453.4 Financial plan 463.4.1 Finance Strategy 52CHAPTER 44.1 MUNICIPAL TRANSFORMATION AND INSTITUTIONAL DEVELOPMENT4.1.1 Municipal Structure 544.1.2 Municipal Administration 554.1.3 SWOT Analyses 564.1.4 Skills Development 584.1.5 Annual Report 584.1.6 Auditor General‟s Report 584.1.7 Existing Inter-municipal structures 594.1.8 Turn Around Strategy 60CHAPTER 55.1 Good Governance and public participation 615.1.1 Powers and Functions 613 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>5.1.2 Shared Services 625.1.2.1 Internal Audit and Audit Committee 635.1.2.2 Fire Fighting Services 635.1.2.3 Development Planning 635.1.2.4 <strong>IDP</strong> Process Plan 645.1.2.5 Special Programs 645.2.1 <strong>Umuziwabantu</strong> Audit Report Finding 665.2.2 Ward Committee Skills Plan 725.2.3 Environmental Management 73CHAPTER 33.1 Development Strategies 813.2 Strategic Objectives 813.3 Municipal objectives 833.3 Development Strategies 94CHAPTER 77.1 Sector Involvement 1117.1.1 Strategic Objectives 1117.2 Sector Plans/Investments 115CHAPTER 88.1 <strong>Umuziwabantu</strong> Projects for Service Delivery 122CHAPTER 99.1 Spatial development framework and Rationale 139CHAPTER 1010.1 Performance management System 153Chapter 1110.1 Annexure1: Process Plan 15610.2 Annexure 2: Draft Strategic Environment Assessment 15610.3 annexure 3: <strong>Umuziwabantu</strong> Infrastructure Master Plan 15610.4 Annexure 4: SDF 15610.5 Annexure 5: <strong>Ugu</strong> Disaster Management Plan 1564 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>GLOSSARYAGAIDSARTARVASGISABBBEECDWsCFODBSADAEADEATDFADFIDDLADLGTADMDoHDoLDWAFEIAAuditor GeneralAcquired Immune Deficiency SyndromeAntiretroviral therapyAntiretroviralAccelerated Shared Growth Initiative of South AfricaBroad Based Black economic EmpowermentCommunity Development WorkersChief Financial OfficerDevelopment Bank of Southern AfricaDepartment of Agriculture and Environmental AffairsDepartment of Environmental Affairs and TourismDevelopment Facilitation ActDepartment for International DevelopmentDepartment of Land AffairsDepartment of Local Government and Traditional Affairs<strong>District</strong> <strong>Municipality</strong>Department of HousingDepartment of LabourDepartment of Water Affairs & ForestryEnvironmental Impact Assessment5 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>EKZNWEMPEPWP PSCEPWPFBSFETHHHIVHRIASICMAICT<strong>IDP</strong><strong>IDP</strong>RFIGRISRDPIWMPKZNLEDLGSETALMLRADEzemvelo KwaZulu-Natal WildlifeEnvironmental Management PlanEPWP Provincial Steering CommitteeExpanded Public Works ProgrammeFree Basic ServicesFurther Education and TrainingHouseholdsHuman Immune-deficiency VirusHuman ResourcesInvasive Alien SpeciesIntegrated Coastal Management ActInformation Communications TechnologiesIntegrated Development PlanIntegrated Development Plan Representative ForumInter Governmental RelationsIntegrated Sustainable Rural Development ProgrammeIntegrated Waste Management PlanKwaZulu-NatalLocal Economic DevelopmentLocal Government SETALocal<strong>Municipality</strong>Land Redistribution Programme6 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>SDFSEASICSLASTATSSAToRVCTWESSASpatial Development FrameworkStrategic Environmental AssessmentStandard Industrial CodesSustainable Livelihood ApproachStatistics South AfricaTerms of ReferenceVoluntary Counselling and TestingWildlife and Environmental Society of South AfricaGLOSSARY OF LEGISLATIVE ENACTMENTSThe Constitution Republic of South Africa‟s Constitution, Act 108 of 1996The Systems Act Municipal Systems Act, No 32 of 2000The Structures Act Municipal Structures Act, No 117 of 1998DFA Development Facilitation Act, No 67 of 1995MFMA Municipal Finance Management Act, No 56 of 20038 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER ONEINTRODUCTION AND BACKGROUND1.1. INTRODUCTIONThe Integrated Development Plan (<strong>IDP</strong>) is the <strong>Municipality</strong>‟s principal strategicplanning document which ensures co-ordination of the government‟s developmentagenda among its three spheres. Integrated Development Planning is an approachto planning that involves the entire municipality and its citizens in finding the bestsolutions to achieve good long-term development. The <strong>IDP</strong> therefore enhancesintegrated service delivery and development and promotes sustainable, integratedcommunities, providing all services, as communities cannot be developed in afragmented manner. An Integrated Development Plan is a super plan for an areathat gives an overall framework for development. It aims to co-ordinate the work oflocal and other spheres of government in a coherent plan to improve the quality oflife for all the people living in an area. It should take into account the existingconditions and problems and resources available for development. The plan shouldlook at economic and social development for the area as a whole. It must set aframework for how land should be used, what infrastructure and services areneeded and how the environment should be protected. The integrated developmentplanning; as a concept must eliminate unnecessary duplication of effort andstreamline funding in a sustainable manner.9 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>The priorities identified in the <strong>IDP</strong> inform all financial planning and budgetingundertaken by the municipality. The attainment of <strong>IDP</strong> and budget targets anddeliverables must be monitored and evaluated on an ongoing basis to ensure thatthe goals set with the communities are achieved through the use of performancemanagement system (PMS). To achieve this requires the development of aperformance management system which has performance indictors and is monitoredon a monthly/quarterly bases.The <strong>IDP</strong> finds its credence in a manner in which it is developed, through stakeholdermobilization and participation.This is the tool through which the democraticgovernment seeks to reverse the ills of apartheid, which was based on separatedevelopment overwhelmingly bias to the white population of this land at the expenseof the black majority. The <strong>IDP</strong> of any municipality in this country must decisively putthe emphasis on the upliftment and empowerment of blacks in general and Africansin particular through sustainable strategies. This must be evident in the manner inwhich the resources are allocated and programs implemented.The <strong>IDP</strong> is a continuous process whereby municipalities prepare 5-year strategicdevelopmental plans which must coincide with the term of council. These plans arereviewed annually in consultation with communities and stakeholders. These plansseek to promote integration by balancing social, economic and ecological pillars ofsustainability without compromising the institutional capacity required in theimplementation, and by coordinating actions across sectors and spheres ofgovernment.1.1.1 Preparation ProcessThe Integrated Development Plan (<strong>IDP</strong>) review is made up of five phases which areexplained below:Situational Analysis10 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Phase 1: Situational Analysis – A phase which deals with the existing situation in themunicipality and is focused on understanding the type of problem or challengesfacing the communities in each ward.It also determines the de facto situation ofmunicipalities, their priority issues as well as an indication on what the plans shouldbe focusing on.StrategiesPhase 2: Strategies – A phase in whereby the municipality formulates the solution toaddress the problems or challenges once they understand the problem. The strategyphase also include the formulation of the vision that would reflect an ambitious,credible, inspiring and achievable statement about the future of the municipality.Strategies are where the development objective, strategies and vision based on keyissues are formulated.ProjectsPhase 3: Projects – is derived from the strategies, objectives and vision based onkey issues are formulated. This phase is about the design and specification ofprojects for implementation.IntegrationPhase 4: Integration – is to ensure that all sector plans from within and outside themunicipality are aligned and integrated. In this phase the sub programme proposals,which were presented in the preceding phase have to be harmonized in terms ofcontents, location and timing in order to achieve consolidated programmes for themunicipality.Approval11 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Phase 5: Approval – once the <strong>IDP</strong> is completed, it is submitted to the municipalitycouncil for consideration and approval. Approval is the public comments andapproval of the planThe Stakeholders in the <strong>IDP</strong> Process <strong>Municipality</strong>The <strong>IDP</strong> guides the development plans of the municipality through integration ofmunicipal plans and those of sector department. CouncillorsThe <strong>IDP</strong> gives councillors an opportunity to make decisions based on the needs andaspirations of their constituencies. Communities and other stakeholdersThe <strong>IDP</strong> is based on community needs and priorities. Communities have the chanceto participate in identifying their most important needs.The <strong>IDP</strong> process encourages all stakeholders who reside and conduct businesswithin a municipal area to participate in the preparation and implementation of thedevelopment plan. National and provincial sector departmentsMany government services are delivered by provincial and national governmentdepartments at local level. Municipalities must take into account the programmes12 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>and policies of these departments. The departments should participate in the <strong>IDP</strong>process so that they can be guided as to how to use their resources to address localneeds.1.2. LEGISLATIVE BAGROUND TO THE <strong>IDP</strong>1.2.1. Constitution of the Republic of South Africa Act 108 of 1996The Constitution of the Republic of South Africa sets the objectives of localgovernment as:to provide democratic and accountable government for local communities;to ensure the provision of services to communities in a sustainable manner;to promote socio and economic development;to promote a safe and healthy environment; andto encourage the involvement of communities and community1.2.2. Local Government: Municipal Systems Act 32 of 2000In terms of the Municipal Systems Act all municipalities in South Africa must prepareIntegrated Development Plans (<strong>IDP</strong>) for their area of jurisdiction. This act definesthe <strong>IDP</strong> as “single inclusive and strategic plan for the development of themunicipality which:o links, integrates and co-ordinates a municipality‟s sector specific plans;o aligns the resources and capacity of the municipality to the overallDevelopment objectives of the municipality;o forms the policy framework on which annual budgets rest; and13 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>o is compatible with the national and provincial development plans1.2.3. Local Government: Municipal Planning and PerformanceManagement Regulations (2001)These Regulations make provision for the inclusion in the <strong>IDP</strong> of the following:The institutional framework for the implementation of the <strong>IDP</strong>;Investment and development initiatives in the <strong>Municipality</strong>;Key performance indicators and other important statistical information;A financial plan; andA spatial development framework.1.2.4. Municipal Finance Management Act 56 of 2003This Act makes provision for alignment between the <strong>IDP</strong> and the municipal Budget.The Service Delivery and Budget Implementation Plan is the mechanism thatensures that the <strong>IDP</strong> and the Budget are aligned.1.2.5. Disaster Management Act 57 of 2002The Disaster Management Act, (Act 57 of 2002) in which the main features ofdisaster management are described as preventing or reducing of disasters,mitigation, preparedness, response, recovery and rehabilitation.The Disaster Management Act, 2002, provides for the declaration of disastersthrough national, provincial and local level government. In the case whereProvincial and Local authorities have determined that a disastrous droughtoccurred or threatens to occur, the disaster management centre of both theprovince and local municipality must immediately-Initiate efforts to assess the magnitude and severity or potentialmagnitude and severity of the disaster;14 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Inform the National Centres of the disaster and its initial assessment ofthe magnitude and severity or potential magnitude and severity of thedisaster;Alert disaster management role-players in the province that may be ofassistance in the circumstances; andInitiate the implementation of any contingency plans and emergencyprocedures that may be applicable in the circumstances.1.3. SUMMARY OF MEC COMMENTS ON 2009-2010 <strong>IDP</strong>Here below is a summary of comments from the MEC on each national KPA for the2009-2010 <strong>IDP</strong>:MUNICIPAL TRANSFORMATION AND INSTITUTIONAL DEVELOPMENTo Human resources indicate vacant and filled positiono Silent on the Intergovernmental Relationso OPMS does not indicate how performance will be measured in respect of KPA’sLOCAL ECONOMIC DEVELOPMENTo Provide a detailed LED program indicating the state of local economy, opportunitiesand constraints, comparative and competitive advantages, a schedule of catalyticprojects based on a realistic strategy. Also align with National and Provincial specialdevelopment, while noting the location of the municipality along the N2 corridor.BASIC SERVICE DELIVERY AND INFRASTRUCTURE INVESTMENTo No INTGRATED INFRUSTRUCTURE INVESTMENT PLAN IN THE <strong>IDP</strong>o No costing of infrastructure projectso No sector infrastructure plans such as the Energy Sector Plan and Transport PlanFINANCIAL VIABILITY AND MANAGEMENTo Alignment of <strong>IDP</strong> and Budgeto Indicate progress made in implementing financial plan particularly strategies andprogramsGOOD GOVERNANCE AND COMMUNITY PARTICIPATIONo Indicate how the municipality ensures public and stakeholder participation in themunicipal affairs15 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>SPATIAL DEVELOPMENT AND FRAMEWORKo Indicate the <strong>IDP</strong> projects spatially as a means to determine the level of governmentinvestment on the nodes and corridoro Attach the reviewed SDFCHAPTER TWOSITUATIONAL ANALYSIS2.1. GEOGRAPHIC LOCATION AND SIZE<strong>Umuziwabantu</strong> is located to the west of the <strong>Ugu</strong> district hence forming a westernboundary for the <strong>Ugu</strong> district and it borders on the Eastern Cape; Sisonke districtand Umzumbe and Ezinqoleni municipalities to the east. The municipality ranges inaltitude from 200m above sea level at UmzimkhuluRiver in KwaMbotho, to 220mabove sea level in the IngeliMountain. The topography is rugged, with manycatchments and sub catchments of both the Umzimkhulu and Umtamvuna rivers,which are from the northern and southern borders of the municipality.The extent of the <strong>Umuziwabantu</strong> Municipal area is 10 862 ha (1088 km²). This areais constituted as follows:Urban: Harding which is about 2% of the area;Farmland: This constitutes 36%;Forestation: 20%; andTribal Areas: approximately 42%16 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>UMuziwabantu<strong>Municipality</strong> consists of 9 wards; however the delimitation of wardsprocess which is currently on has determined that for <strong>2011</strong> local governmentelections there will be 10 wards. There are six tribal authorities which are within themunicipal boundaries and they are listed here below:o Ward 1: KwaFodo and Dumisa Tribal Areas and farmland.o Ward 2: KwaMbotho and Bashaweni Tribal Areas and farmland.o Ward 3. Harding, part of KwaMbotho Tribal Area and Farmland.o Ward 4. Part of KwaMachi Tribal Area.o Ward 5. Part of KwaMachi Tribal Area.o Ward 6. Part of KwaMachi Tribal Area.o Ward 7. Part of KwaJali and KwaMachi Tribal areas, WezaStateForestand Farmland.o Ward 8. Part of KwaMachi Tribal Area.o Ward 9. Part of KwaJali Tribal Area.The spine road at <strong>Umuziwabantu</strong> is the N2 which connects this municipality withEzinqoleni and Port Shepstone on the east and the Eastern Cape on the south east.Connected to the N2 is R56 road which passes through Umzimkhulu; Ixobho andultimately Pietermaritzburg.TOPOGRAPHY<strong>Umuziwabantu</strong> like other rural municipality within <strong>Ugu</strong> is characterized by thetopography which is not friendly to the delivery of basic services. Its description iswell captured by the <strong>Ugu</strong>‟s Water Services Development Plan:The<strong>Umuziwabantu</strong> area is 1088 km² in extent and is characterized by steeply incisedriver valleys and generally undulating topography. The area is sparsely populatedwith a population density of 88 people per square kilometer. The undulatingtopography and sparse population referred to above are some of the key factorswhich make it very difficult to achieve the RDP standards in service delivery. Thearea of KwaFodo is one of such areas where the terrain and space betweenhouseholds will make almost impossible to achieve the national target. In fact in17 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>some areas a proactive intervention to, firstly, discourage people from building inareas which are difficult to reach even by foot like deep valleys and gorges.Secondly, to encourage those that can afford to relocate to areas which are moreaccessible.2.2. DERMOGRAPHICS /POPULATION DISTRIBUTION18 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Demographics and population distribution guide any planning and developmentprocess, since the people provide labour and entrepreneurship for production andalso consume the output of production. To form a clear picture of socio-economicconditions in the <strong>Umuziwabantu</strong> municipality, it is vital to analyze the size, spatialdistribution, composition and growth pattern of the population, along with changesin these factors and possible future trends and tendencies.DEMOGRAPHIC INFORMATIONKZN UGU UMUZIWABANTUArea Size (Km2)GrowthPopulationHouseholds5 044 1 0880.51 1.710 259 230 709 918 105 5792 234 125 151 620 21 459GenderMaleFemaleSex Ratio47.5 45.8 47,49352.5 54.2 58,08685.7 81.8Population GroupBlackColouredAsian/ IndianWhite86 92 96.31.4 0.6 1.78.2 3.5 1.74.4 3.8 0.419 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>AgeAge (10 - 14)Age (15 - 64)Age ( 65+)Average AgeDependency33.5 35.6 42.161.7 57.9 52.34.8 6.4 5.625.6 26 2462 73 91(Source: STATSSA community Survey 2007)The table shows that approximately 54,5% of the population in <strong>Umuziwabantu</strong> isyounger than 20 years, while a further 5.6 % is 65 years or older. The percentage ofpeople that are 65 years or older is lower than <strong>Ugu</strong>‟s and higher than that ofKwaZulu-Natal and South Africa. This shows high differences in dependency ratiobetween the non working age and those of working age from the municipality.Females form the majority of the population at 55.2% and the balance of 44,3% aremales.In terms of the population breakdown, Africans make up 97, 4% of the population in<strong>Umuziwabantu</strong>. Indians, whites and coloureds, constitutes only 0.4%, 0.5% and 1.7of the population in <strong>Umuziwabantu</strong> respectively. The population shows an averagegrowth of 1.3% per annum when compared with the 2001 national census statistics.2.3. SOCIO ECONOMIC ANALYSISThe purpose of the socio-economic analysis is to give a synopsis of <strong>Umuziwabantu</strong> interms of the physical, demographic, social and economic features. The situationalanalysis and statistics presented in this chapter indicate the developmentalchallenges facing <strong>Umuziwabantu</strong>, such as poverty, unemployment and servicedelivery backlogs. The programmes and projects in this <strong>IDP</strong> are informed by thisscenario.20 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>2.3.1. Health Services<strong>Umuziwabantu</strong> <strong>Municipality</strong> currently has one (1) hospital, St Andrews Hospital; ninepermanent clinics (8), one of which is a municipal clinic and 3 mobile clinics. Thereare two clinics which are newly constructed at KwaMbotho and Santombe(KwaFodo). There is an additional one referred to as a cross border clinic because ofits location in both jurisdictions of <strong>Umuziwabantu</strong> and Izinqoleni municipalities, theKaNikwe Clinic. Weza clinic which was built in partnership with private company issubject to review of the contract between the owners and stakeholders. Given thepopulation of <strong>Umuziwabantu</strong> this number of health service points is not sufficient.There is a big influx of patients of the neighbouring villages e.g. Umzimkhulu to thehealth service centres in town also adding strain to the services is the neighbouringprovince Eastern Cape Bizana in particular.The Living Standards Assessment Survey conducted by the Global Research andMedical Network released in April 2004 indicated that the most commonly usedfacilities are clinics at 48% followed by private doctors at 33% and 25% ended upusing hospital services. Given the increase in the number of clinics since then, it isexpected that the number of people who use the clinic as the first point of contactwith the health services would have increase.2.3.2 HIV AND AIDSIt is impossible at this point of our history to speak about the social issues and nottalk about the HI virus and AIDS. This is due to its impact in the economy, familystructures and family expenditure patterns. Here below is a comparative table onHIV and AIDS Statistics sourced from <strong>Ugu</strong> LED Strategy completed in 2007. It isestimated that approximately 12,343 persons in <strong>Umuziwabantu</strong> were HIV positive in2004. The population infected in <strong>Umuziwabantu</strong> increased by 8,1 % between 1996to 2004 resulting in a total number of infected people increasing from 5.1% in1996 to 13,2% in 2004. The 8.1% rate increase of the infected people in<strong>Umuziwabantu</strong> is lower than 8.4% in both <strong>Ugu</strong> district and the province but higherthan 7.4% of the entire country.21 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Statistics show another increase in AIDS related deaths from 13.4% in 1996 to56.9% in 2004 compared with <strong>Ugu</strong>, the province and the country whose rates are54.4; 57.6 and 47.6 respectively for the same period. During the same period, 1996to 2004, there was virtually no increase in non-AIDS related deaths in most of themunicipalities in <strong>Ugu</strong>, as well as in the rest of KwaZulu-Natal and South Africa.HIV and AIDS Statistics<strong>Umuziwabantu</strong> <strong>Ugu</strong> Kwazulu-Natal South AfricaHIV+Total: 2004 12,343 98,265 1364,030 5,021,067Annual Growth:1996-200413.6 13.4 13.2 16.9% of Population1996 5.1 5.3 5.8 3.52004 13.2 13.7 14.2 10.9DeathsTotal: 2004 1,647 13,348 172,512 687,280% AIDS Related1996 13.4 11.8 13.2 7.82004 56.9 54.4 57.6 46.7Annual Growth:1996-200422 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Non-AidsRelated0.5 0.5 0.8 1.1AIDS related 31.4 32.2 32.5 35.4Source: <strong>Ugu</strong> LED Strategy (2007)In terms of access to ARVs, only the hospital, St. Andrews is equipped todispense the ARVs excluding of course private doctors. The 2005-2006 statisticsshows that only about 1012 people were on ARVs through the local hospital. As perthe resolutions of the HIV and AIDS in the <strong>Ugu</strong> district an <strong>Ugu</strong>district AIDS Councilhas been established to coordinate the activities, programs and campaigns.One of the reasons why this forum was established was to minimize duplication bydifferent government departments; NGOs, the district and local municipalities.2.3.3 EducationEducation is the core function of the department of education and not of themunicipality. However, given the nature of the role the <strong>IDP</strong> must play inintergovernmental relations and the impact of skills in the economy at large it iscritical to consider. This department of Education is one of those departments whichhave aligned its boundaries to match those of local government.The statistics of 2001 estimated that 35.8% of <strong>Umuziwabantu</strong> population wasattending schools and that less than 8% of the population had completed Matric.The Standard of Living Assessment Survey estimated that 58% of this number travelon foot to school with 10% of these taking more than an hour to get to school.There is only one library in the municipality located in municipal offices in town.Needless to say that one small library cannot cope with more than 33 000 learners.Access to libraries is still the privilege of the few that resides in town or can afford totravel to town access the services.23 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>There are 60 schools within <strong>Umuziwabantu</strong> composed of 45 primary and 15secondary schools. Only one of these schools is a special school catering for childrenliving with disabilities.2.3.4 Other Social ServicesExcluding education which has been discussed above there are three otherdepartments which fall under social services: Departments of Social Welfare andPopulation Development; Home Affairs and Safety and Security. The services offeredby these departments were among the most discussed during the stakeholdersmeetings. The biggest concern with the three of them is their accessibility.Communities have to travel to town for their services as their functions are notdecentralized. Upon arrival, more especially with Home Affairs and Social Welfare,hours are spent on the queues with no guarantee that they shall get serviced on theday. Home Affairs specifically, is grossly understaffed.Social Welfare and Population Development is the better staffed of the two,however, the problem of overcrowding remains an issue. This department has aserious problem of space as well. They are currently using park homes as offices,which are not the best setting for their service. As a result people queue outsideoffices in different kinds of weather. With police stations, besides the issue ofstaffing, the biggest problem is that there is only one police station within<strong>Umuziwabantu</strong> as a whole.<strong>IDP</strong> representative meetings have led Social Development Department to develop arotational strategy for all wards, by developing a rotational programme so that eachward can be given more attention as opposed to the past where people will all comeat once from all wards and some bound to not receiving assistance because of highnumbers. In addressing its challenge of space, the Department of SocialDevelopment is in process of identifying potential sites for construction of offices.2.3.5 Safety and security24 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>There is only one police station in the <strong>Umuziwabantu</strong> municipality which is situatedin town. The entire community is depending on this police station‟s services. Inpursuit to reduce crime, the establishment of Community Police Forums (CPF) andemergency zoning of villages need to be an area of focus.The Community Justice programme must be structured and strengthened to resolveon small cases. In addition to the inadequacy of this service, the existing PoliceStation lack equipment and vehicles. The municipality within the ensuing financialyear will be engaging the Provincial Department of Safety Liaison and the PoliceCommissioner regarding the possibility to improving accessibility of this service interms of building new police stations, equipping the existing ones and strengtheningof partnership especially in terms of sharing the available resources.The lack of or shortage of safety and security services, leads to communityconfusion whereby other people e.g. Ward 5 are serviced by Ezinqoleni policestation.It was strongly felt by almost all stakeholders that decentralization of social servicesoperations to MPCCs will be an answer to their problems. This is in line with the newthinking of the municipality to move away from provision of community halls intobuilding multi-purpose facilities which in terms of this plan the South African PoliceService could access space from such facilities.2.3.6 Community FacilitiesThe municipality shows enormous progress in the provision of community facilitiescompared to the previous era where development in communities was dominated bythe construction of community halls; sewing centres and crèches. These structureswere not based on sustainability principle and there were no operations andmaintenance plans projected. These structures were built by governmentdepartments; transitional authorities and the district municipality. Most of thesestructures are underutilized and are, consequently vandalized. Proper maintenanceplans need to be developed to safe guard these properties.25 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>There are also no management structures in place to run these facilities. In manyinstances these facilities were constructed and not handed over to the community,hence they are not maintained and not on the municipal asset register. There isgenerally little improvement on looking after community halls, crèches andmultipurpose centres. There is barely a plan to sustain their operations andmaintenance. Although in some wards, committees have been established to servicethese centres, a master plan embedded on principles of self sustainability must bedeveloped and decentralised to all wards.There is one functional and fully-fledged community library which was built by thedepartment of Sports, Arts and Culture. It is located in Harding on the municipalpremises.Given high number of users, more space or extension is required in thenear future. It is worth-noting, that the culture of learning has been instilled in<strong>Umuziwabantu</strong> as we witness more and more members of the public registering asmembers at the library.2.3.7 Social Services GrantsType of Grant Number Paid Amount in RandsOld Age Pension 4956 R4,311,720.00 (per month)Disability Grant 4422 R3,847,140.00 (per month)Foster Care Grant 1128 R699,360.00 (per month)Combined Grant (CDG+FCG) 24 R35,760.00 (per month)Grant-In-Aid 12 R2,400.00 (per month)Care Dependency Grant 228 R198,360.00 (per month)26 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Child Support Grant 11197 R2,239,400.00 (per month)Grand Totals 21967 R11,334,140.00 (per month)Average to be spent for the year2008/2009R136,009,680.00Given the high levels of poverty referred to here above, there is high reliance onsocial grants by families for survival. As shown below, 20% of the population wasreceiving government grants during 2009-2010 financial year. This figure had grownby 15.6% between 2007 and 2008.SASSA 20010The figures above show that: More than 20% of <strong>Umuziwabantu</strong> population receives social grants The biggest number of recipient, by far are children, receiving the childsupport grant. The number of children receiving the child support grant is more than 50%of the total number of recipients at<strong>Umuziwabantu</strong>.2.3.8 Local Economic DevelopmentThe <strong>Umuziwabantu</strong> municipality has, like most predominantly rural municipalities inthe province and throughout the country, high levels of poverty, unemployment andinadequate economic growth to provide good quality of life to most of its residents.LED StrategyThe <strong>Umuziwabantu</strong> LED Strategy was completed in January 2008 as envisaged inthe original <strong>IDP</strong>. It is has been adopted by Council to become a legal municipaldocument and included in <strong>IDP</strong> as a sector plan that informs all local based economicdevelopment strategies.27 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Currently LED projects underway include the following:Ingeli trails, Wind generatedEnergy, Honey production, Bean production, training programmes for bothcooperatives and SMMEs and formalising their registration, formation ofumuziwabantu chapter business chamber of commerce and informal traders club. Inthestrategy, it appears that <strong>Umuziwabantu</strong> area has high potential for production ofmaize, wheat and sugar cane, other crops and plantations. People in the communityare encouraged to form groups of cooperatives in order to access theseopportunities. The municipal council has decided not to renew contracts of expiringlease of lands occupied by former advantaged counterparts, in pursuit ofencouraging previously disadvantaged people to use the land in future. Besides,certain areas like Gundrift, the topology of soils allows mining of tiles and mudrelated products, this opportunity need further exploration and lobbying to relevantbusiness partners.Food Security ProgramThe municipality is one of the two in the district which are beneficiaries from theFlemmish funded food security programme. This project is targeting the alreadyorganized groups and schools. It intervenes by providing the main infrastructureneeded to unlock the potential of existing projects and by providing seeds andimplements. Tremendous achievements have been made through the program as anestimated amount of 500 families have been touched since its inception. Theprogramme is funded for a period of four years with an estimate amount of R5m.Household IncomeHousehold income is one of the most important determinants of poverty levels in themunicipal area. The ability to meet basic needs is largely determined by the level ofincome earned by the households. Poverty is often defined as the lack of resourcesto meet the basic needs.Here blow is the individual monthly income based on census 2001.28 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Table: Individual monthly incomeIndividual monthly income (2001)Persons 2001None 9369R1 – 400 453R401 – 800 1104R801 – 1600 78R1601 – 3200 63R3201 – 6400 33R6401 – 12800 12R12801 – 25600 3R25601 – 51200 0R51201 – 102400 3R102401 – 204800 3Over R204801 0* Latest census information: STATSSA 2001The table above shows a high number of people at <strong>Umuziwabantu</strong>whodo not haveincome any source of income. This is a challenge because the lack of income is dueto a number of issues such as unemployment and lack of opportunities for selfemployment. Lack or no income in a household is a direct contributing factor topoverty and also requires the municipality to closely look at the issues of indigentsupport.ECONOMIC PROFILELocation of formal employment opportunities in <strong>Umuziwabantu</strong> in 2004SECTOR <strong>Umuziwabantu</strong> <strong>Ugu</strong>29 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Number of FormalEmployment Opportunitiesin <strong>Ugu</strong> (2004)6,176 67,926Percentage per Sector:Agriculture, forestry andfishing20.8 18.1Mining 0.4 0.6Manufacturing 14.4 12.1Electricity & water 0.1 0.6Construction 4.8 4.6Wholesale & retail trade;cateringandaccommodation14.2 15.9Transport & communication 1.5 1.7Finance and businessservicesCommunity, social andother personal services5.1 9.319.2 20.4Generalservicesgovernment19.5 16.7Source: <strong>Ugu</strong> LED Strategy (2007)The above table sourced from <strong>Ugu</strong> LED strategy indicates that only 6 176 formalemployment opportunities existed at <strong>Umuziwabantu</strong>.This shows a decline in thenumber of people who are employed if compared with 2001 statistics, which is notgood at all as it puts pressure on the government grants and the few that areemployed. One of the biggest contributors to this decline has been the poorperformance of Hans-Marensky group, one of the biggest timber processing firms inthe country employing thousands in the Umuziwaantu area. In the last few yearsthis firm laid off hundreds of its workforce. The table also indicates that the sectorthat employs the biggest number of people is forestry at 20.8, followed bygovernment at 19.5. the Living Standards Assessment indicated that 60% of the30 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>total number of the employed are unskilled labourers. This can be attributed to thelow level of skills and a shortage of entrepreneurial skills to create more jobs. Thisalso means that most of the raw material processed leaves the area unprocessed, ifthat was not the case the market would have had more skilled labour force.Economic Resource ProfileThe main economic activity in the <strong>Umuziwabantu</strong><strong>Municipality</strong> is farming, subsistencefarming and retail businesses. The retail business which is the core of Harding townis showing very slow growth.AgricultureIn the agricultural sector there is a marked division between the commercial sector(first economy) and the subsistence sector (subsistence agriculture). Furthermore,the commercial sector involves both primary production and agro-processingactivities.TimberForestry is an important crop serving the furniture and pulp industries. Largecommercial plantations are located mainly in the high rainfall areas near Harding.Timber is grown for hardwoods (for poles, pulp and bark – wattle and gum), andsoftwood (for logs - pine). Small and medium scale growers focus on hardwood forpulp production.The <strong>Ugu</strong> Agricultural sector plan indicted that there are various growers that areinvolved in <strong>Umuziwabantu</strong><strong>Municipality</strong> and they can be summarized as privatefarmers (Harding), Mondi (Harding), SappiForests (Harding), Masonite (Harding) andNCT Forestry Co-op (Harding). Sappi and Mondi have promoted small-scale growerswith access to communal traditional land but the long time period between plantingand harvesting means that the benefits are not readily evident.Subsistence AgricultureWith the exception of small scale maize growing, limited small-scale woodlots, thetraditional authority areas are generally characterised by subsistence agriculture.31 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>This comprises livestock raising (mainly cattle, goats and household chickens),dryland cropping and homestead gardening. Many rural people have multiplelivelihood strategies. They are involved in a range of agricultural activities but alsorely largely on social grants (pension and child support grants), salaries andremittance.Inland, the density of housing is reduced and grazing land is more available forlivestock. While livestock keeping is not primarily for commercial purposes, livestockdo play important roles in rural communities. While generating some cash throughsales in time of need, they are also a source of food (eggs, meat and milk), draughtpower for ploughing and a range of social benefits (e.g. lobolo).KZN Department of Economic Development - GIJIMA FundThe list below summarizes some of the projects that have received funding throughthe Gijima Programme. Port Shepstone – <strong>Ugu</strong> Market Depot System - Capacitate emerging ruralfarmers by linking them with the <strong>Ugu</strong> Fresh Produce Market Development –create infrastructure including bulk bins, forklifts and refrigeration (as apilot collection depot is proposed to be established –one at <strong>Umuziwabantu</strong>). The LED Strategy SMME DevelopmentMANUFACTURING Agri-processingAccording to the <strong>Ugu</strong>Agric Sector Plan 2007, this sector is well-developed in<strong>Umuziwabantu</strong> most notable various timber mills and processing plants primarily inthe areas around Harding. High employment numbers in these sectors stresses theimportance of the sector for <strong>Umuziwabantu</strong>.Timber and Timber Products32 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>This sector covers a whole range of activities from logging and stripping to sawingand finally the manufacture of items such as construction materials (doors, windowframes and others), furniture and other household items.There is however, a lot thatstill needs to be done for timber beneficiation before it leaves the region. Trade and CommerceThis provides an overview of the economy for <strong>Umuziwabantu</strong> municipality. It isevident that the trade and commerce sector contributes a significant portion of theoverall economy in the municipalities. It accounts for around 50% of GDP in the<strong>Umuziwabantu</strong> municipality as stated in the <strong>Ugu</strong> Trade and Commerce sector plan.Table: Gross Geographic Product Profile of <strong>Umuziwabantu</strong><strong>Municipality</strong> Economy(GDP, 2004).Sector<strong>Umuziwabantu</strong>Agriculture 20.12Mining 0.66Manufacturing 19.30Electricity and water 0.19Construction 2.53Transport and communication 6.71Trade; catering and accommodation 17.67Finance and business services 4.93Community, social and otherpersonal services9.5933 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>General government services 18.31Total 100Source: QuantecEasydataCompetitivenessThe information provided in the above tables is by no means exhaustive as variousfactors impact on the profitability of businesses and industries. Amongst others,competition is influenced by the following: Factor endowments – the availability of resources and their level ofdevelopment. Distance to markets – transport costs has a huge impact on unprocessedprimary products such as timber, mining and other agricultural products. . Infrastructure – poor infrastructure impacts negatively on the profitabilityand viability of industries. Provision of roads and electricity and otherspecific infrastructure requirements are critical for the survival and growth ofexisting industries and growth of new ones. Within this context governmentaction can play a strategic role in mitigating these costs. Rivalry of competition – competition may facilitate or inhibit the emergenceof new industries. The shortage of timber supplies and scramble for newforestry resources is a good thing for economies such as uMuziwabantu.This makes it because of easy access to markets and available support andpartnerships from established forestry companies such as Mondi, SAPPI, NCTand Hans Merensky. Government Action – by developing appropriate support strategies forindustry to invest in depressed local economies such as uMuziwabantu newbusinesses can emerge. Through incentives, appropriate by-laws and othersupport mechanisms government can play a positive or negative role inattracting new investments and the expansion of existing ones.Tourism34 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong><strong>Ugu</strong> family of municipalities have successfully established a tourism entity which isresponsible for the promotion of Tourism in the entire district. Already, theassociation is in a process of establishing a tourism office in the area of<strong>Umuziwabantu</strong> and has already established a tourism areal committee.2.4 BASIC SERVICES AND INFRASTRUCTURE DEVELOPMENTThe level and quality of a country‟s infrastructure is the backbone of economy anddetermines the extent to which external investors may choose the country as aninvestment destination.2.4.1 Roads and Storm water drainageThe <strong>Umuziwabantu</strong> municipality is responsible for the construction, maintenance andupgrading of access roads within the area of jurisdiction. There are two primaryroads that form the spine of <strong>Umuziwabantu</strong> roads network that is the N2 whichconnects this municipality with Ezinqoleni and Port Shepstone on the east and theEastern Cape on the south west and R56 which connects to N2.The condition of Harding roads is very poor. Most of them need to be re-done;patching them can only be a temporary measure. Historically, there are only tworoads which were properly constructed: Hawkins (Bizana) and Murchison streets.The rest of the roads were gravel roads which were covered with the black top to35 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>reduce dust. Given the significant increase of traffic in the last 10 years and the lackof proper maintenance, this black top has deteriorated to an extent that in someroads there is more of gravel surface than tar. As a result the town is dusty andunpleasant to drive in.During the last three years, the municipality has dedicated more than R20m to theupgrade Harding Roads. This excludes the R15m investment made by the provincialgovernment as part of the Small Town Rehabilitation program which is currentlybeing implemented. The current reconstruction of these roads is taking into accountthe current and future volumes of traffic.The state of the rural road network remains a concern as most of the communitiesare inaccessibility due to poor conditions of and lack of maintenance of these accessroads.The municipality, while noting that there are a few areas without access to wellmaintained access roads, acknowledges that most areas in <strong>Umuziwabantu</strong> haveaccess roads, and that the priority of building new roads must be balanced againstthat of maintaining the existing ones. A prioritized achievement in the short term willbe the drafting and adoption of a Municipal Road Network Maintenance Plan. Incontrast to maintenance programme, which utilizes external contractors and amachinery-oriented approach, the Municipal Road Maintenance Plan for access roadsseeks to address issues of unemployment and lack of skills through principles ofExtended Public Works Programme (EPWP).Maintenance of the storm water drainage network in town needs to be attended towith urgency. Silt, gravel and refuse regularly clog up the culverts, resulting inponding of storm water on roads. This flooding contributes a lot in the filth of thetown. As part of the roads upgrade, the municipality is redesigning andreconstructing the drainage system of the roads being upgraded.Infrastructure Master Plan36 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>The municipality funded by the DBSA and provincial COGTA has commissioned aninfrastructure master plan for the town. This will improve the future planning andinform the future infrastructural investment.2.4.2 ElectricityThere are two authorities licensed to supply electricity at <strong>Umuziwabantu</strong>, that is, themunicipality and ESKOM. The former is only responsible for the town and the latterfor the entire area, which is mainly rural. It could be estimated that the portioncovered by the municipality is about one percent (1%) of the total area.However, it is now known that in the near future Regional Electricity Distributors(REDs) will take over the function of distributing electricity from the two authorities.This means that by the end of the five year term of the current national andprovincial governments, the municipality and ESKOM will not be the distributors ofelectricity. Although the national government has made a commitment tomunicipalities that they will not be worse off financially as a result of the removal ofthis income generating function, it has not yet been clarified how this will beavoided.About 98 % of households in town have access to electricity with thebalance being the informal settlement next to the low cost housing.ENERGY FOR LIGHTINGKZN <strong>Ugu</strong> <strong>Umuziwabantu</strong>Electricity 71.5 68.2 78.2Gas 0.2 0.2 0Paraffin 2.6 2.6 0.9Candles 24.5 24.5 19.5Solar 0.5 0.5 0.2COMMUNITY SURVEY 2007The 2007 community survey conducted by STATSSA, as shown above, estimatedthat 78.2% households of <strong>Umuziwabantu</strong> have electricity, at least for lighting with19.5% still using candles. The percentage of people using electricity is 10% and 7%37 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>above the district and provincial accessibility level, respectively. The backlog ofabout 21.8% and the pace at which ESKOM has been extending the network,<strong>Umuziwabantu</strong> is one of the municipalities where it is possible to meet the 2014target of the universal access to electricity. The national target for electrifying allhouseholds in South Africa has been extended from <strong>2012</strong> to 2014.Currently, thereare two main electricity projects to be implemented in the 2010-<strong>2011</strong> financial year.These are KwaMbotho and KwaJali projects with a total budget of R20.8m.In terms of the capacity of substations, ESKOM confirms that the existing capacity isenough to carry 100% connection of households. This puts <strong>Umuziwabantu</strong> on anadvantage as connections do not require upgrading of transformers, which is usuallya delaying factor.Alternative Source of Energy<strong>Umuziwabantu</strong> and TPE energies (Cape Town) are piloting a wind power generatedenergy coordinated by <strong>District</strong> in municipalities with higher altitudes or favourabletopography. Three sites have been earmarked, that include the IngeleMountain nearand facing Ingeli Forest Lodge, a hilltop in Ward 9 and a site near fontein sportground as potential sites. This alternative source of energy will correlate to creatingjob opportunities and also to increase current revenue generated by themunicipality. The municipality has started engaging Department of Energy andEskom to discuss licensing and programme of action.Free Basic ElectricityMore than five thousand households are receiving the first 50kw of electricity free onmonthly basis. This is part of the municipal indigent support on basic services.2.4.3 Water supply38 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>In terms of delegated powers and functions, the function of water and sanitationservice delivery rests with <strong>Ugu</strong><strong>District</strong><strong>Municipality</strong>. As Water Service Authority(WSA), UGU DM is responsible for ensuring water and sanitation access, planning ofprojects, regulation of projects, and overseeing water provision. As Water ServiceProvider (WSP), UGU DM is responsible for providing water and sanitation services,both effectively and efficiently, maintaining customer relations, and billing.Although water provision is in the UGU DM competency, planning of projects is donejointly with local municipalities and budgeted for by the district.Based on the statusquo, all urban residents have water in their houses or within the RDP standards incase of Kwamazakhele where residents get their water from the public waterstandpipes.Access to water remains a challenge for rural communities; this is shownby huge backlog of lack of access to basic services. The table below is extractedfrom the <strong>Ugu</strong>‟ WSDP and it shows estimated backlog per tribal authority.AreaEstimated Population with Estimated Population with aAdequate Water Services Backlog of Water ServicesBashaweni 982 0KwaMachi/Isibonda 22867 27879KwaFodo 5496 3023KwaMmbotho 5030 2552KwaJali/Nhlangano i 8069 6230Dumisa/Thokozani 0 1838TOTAL42444 41522The same document estimates that an amount of R 73,055,000.00is needed to dealwith the existing backlog by 2009. This plan is here annexed as a sector plan.Public Inputs on Water ServicesoWater backlog in rural areas: all rural wards raised access to clean wateras one of the key priorities. This problem is reflected on the backlog tableabove. In areas where the water reticulation has been implemented it is still39 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>oovery far from meeting the RDP standard of all households being at most200m away from the standpipe. In many communities people still walk longdistances to fetch water from the stand pipe or unsafe source.Partially working water systems: this problem is mainly experienced inrural areas where because of low pressure, it is said, certain areas end uphaving no water.More resources needed for temporary water supply methodssystems: this refers to spring protection, borehole and water tanks2.4.4 Sanitation servicesMany households in Harding town are using septic tanks and conservancytanks with MazakheleTownship using the VIP system, a very inappropriatesystem in an urban setting. These systems are not the best for both the usersand the environment, full waterborne system is required to ensure sustainableand environmentally healthy development. A big problem with conservancytanks are sewage overflows. It is not uncommon to have sewage overflowsinto the storm water drainage, more especially during the rainy seasons.The WSDP estimates that an amount of R 26,625,000 is needed for Harding tobe on waterborne system excluding Greenfields and Mazakhele projects whichare treated as separate projects. If included the costs moves up to + R58million. This project, of converting into a waterborne system in town hascommenced and is anticipated to take three years.The table below shows an estimated backlog in rural areas. These areas areprovided with VIP toilets.Estimated Population Estimated Population withAreawith Adequate Backlog of SanitationSanitation Services ServicesBashaweni 0 982KwaMachi/Isibonda 5047 45699KwaFodo 4025 449440 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Estimated Population Estimated Population withAreawith Adequate Backlog of SanitationSanitation Services ServicesKwaMmbotho 3542 4040KwaJali/Nhlangano i 5866 8433Dumisa/Thokozani 0 1838TOTAL18480 65486It must be noted that in terms of the rural housing program funded by theDepartment of Housing, where a subsidized house is approved, the VIP toiletis also provided. This means that <strong>Ugu</strong>, the DoH and <strong>Umuziwabantu</strong> shouldwork closely to ensure that there is no duplication of the same service. Infact, if this is well coordinated, the estimated time to do away with thebacklog will be shortened and costs estimated by the district reducedsignificantly.2.4.5 HousingLike in many rural areas most houses in rural areas of <strong>Umuziwabantu</strong> are mudhouses and they have a low resistance and easily collapse during storms.KwaJali and KwaMachi are areas which are susceptible to storms. In 2007alone, more than 70 houses collapsed during the storms leaving casualties andat one fatality one.As far as subsidized housing projects are concerned, there are both urban andrural housing projects. The table here below indicates the housing projectsalready approved by the Department of Housing. The majority of these housesare to be built in rural areas. By the end of 2009 all 8128 houses should havebeen completed.In rural projects, no rural scheme project is underway pending the allocationand plan from Department of Housing. On the urban programme Greenfields is41 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>on progress and for KwaMazakhele the DFA process has been approved morethan 900 people are already occupying these houses.Name of ProjectHarding: Greenfields Project 338Winterton Harding: Phase 1 900IzibondaKwaMachi Rural Housing Project 1000Nhlangwini/KwaFodo Rural Housing Project 1000KwaJali Tribal Authority Area Ward 7 andPortion of 9Number ofUnits890KwaDumisa Rural Housing Project 1000KwaMbotho Rural Housing Project 1000MazakheleWinterton Phase 3 1000Bashaweni Rural Housing Project 1000TOTAL 81282.4.6 Waste RemovalThe majority of the population, about 95%, of <strong>Umuziwabantu</strong> uses their owndump to dispose their refuse. Only about 5% of the residents benefit from themunicipal services, the majority of whom reside in and around Harding town.This is still very far from the national target of every household getting a refuseremoval service at least once a week by 2014. This target will require heavyinvestment which the municipality cannot afford from the current levels offunding.42 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER THREE3 FINANCIAL VIABILITYThis KPA is concerned with the municipality‟s ability to manage its financial resourcesin sustainable manner. There are few indicators which point at whether themunicipality is viable or not. This section is analyzed using the latest auditedfinancial statements (2008-2009) and the approved budget (2009-2010).3.1 Sources of IncomeHere below is a split between grants and internally generated funding for themunicipal budget(2009-2010)43 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Municipal Budget, 0 , 0Revenue, 61.1Grants andsubsidies, 38.9Grants and subsidiesRevenueAs can be seen on the pie chart above, the municipal operations are 38.9% fundedthrough grants and subsidies and the balance of 61.1% is generated internally. Thefollowing the main sources of income:ElectricityProperty ratesRefuse removalOther (licensing; rentals; fines etc)3.2 Financial Viability DeterminantsHere below are viability results as calculated by the Provincial Treasury using thelatest audited financial statements and the adopted budget.3.2.1.1 Cash Balances Cash balances at the end of each year (for the last three years) indicatesthat the municipality has sufficient cash to cover unspent portion of theunspent conditional grants.3.2.1.2 Cash Coverage Ratio The cash coverage ratio indicates that the available cash can coverapproximately 8 months fixed operating expenditure.44 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong> The cash coverage ratio appears to be reasonable over the 3 financial yearsand indicates that cash on hand is being effectively used.3.2.1.3 Liquidity RatioThis ratio indicates the extent to which current assets can be used to cover shortterm liabilities. This ratio is good for <strong>Umuziwabantu</strong> as it was 2.06 for 2008-2009All ratios which are used to test the viability of the municipality show an excellentperformance by the municipality. Like in many municipalities the key challenge is theincreasing debtors.3.2.2 Auditor General’s reports2004/05 2005/06 2006/07 2007/2008 2008/2009 2009/2010Qualified Qualified Qualified Unqualified Unqualified UnqualifiedThe above table shows the history of the municipality‟s financial statementsreliability. There has been a positive change since 2007. The national target set bythe national government is for all municipalities to have clean audit by 2014. Thehuman resources available at the disposal of the municipality suggest that thenational target is attainable.3.3 FINANCIAL PLANIntroduction<strong>Umuziwabantu</strong> <strong>Municipality</strong> has recognised that in order to be successful, the Budget andthe <strong>IDP</strong> Process must be linked. The purpose of this section in the <strong>IDP</strong> document is to createa medium and long term strategic financial framework for allocation of resources and toensure financial viability and sustainability of municipality. The financial Plan is an integralcomponent of the <strong>IDP</strong> as it addresses:oEstablishment of Financial management Systems45 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>ooProvision of resources over a 3-5 year planning periodThe balancing of the factor relating to income with objectives established during the<strong>IDP</strong> Process.The Budget Format and content for the MTEF period 2008/09 to 2010/13 was informed bycircular 28 of the MFMA. Budget assumptions were informed by circular 41 where expensesare increased with an average of 6% and salaries with 8.5%. The same assumptions will beapplied in the determination of tariffs when applicable and required.All Departments within the <strong>Municipality</strong> were involved in the Budget discussions thatresulted in this multi-year Budget. The focus was on key service delivery challenges withinthe municipal area and municipal administration whilst acknowledging the political contextand its associated financial implications and priorities of the council. Challenges such asovertime, acting allowances, temporary workers, leave provision, infrastructure maintenancebudget, and repairs were considered.The budget was submitted to the Finance Portfolio committee for consideration andassessment and the draft budget as tabled before council for noting.Grant dependency remains the biggest problem of the municipality and due to the economicprofile of local citizens. In terms of credit control policy, Free Basic services are provided tothe indigent to ensure that unemployment has a minimum effect to the standard of livingand payment levels.3.3.2 Return on InvestmentsThis is a ratio of gained or lost (realized or unrealized) on an investment relative to theamount of money invested. The amount of money gained or lost may be referred to asinterest, profit/loss, gain/loss, or net income/loss. The money invested may be referred toas the asset, capital, principal, or the cost basis of the investment. ROI is usually expressedas a percentage rather than a fraction. Municipalities are encouraged to invest in order togain profits. The municipality has reviewed its investment policy to optimal maximize itspotential to make more profits in order to increase their service delivery.3.3.3 Expenditure and Income46 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>The municipality has increased its monitoring and safeguarding procedures to preventfraudulent and corruption practices.47 | P a g e


3.4 Financial Plan and BudgetBudget Projections- <strong>2011</strong>/2014PROJECTEDCAPITAL FUNDINGMedium Term Revenue and ExpenditureFrameworkBudget YearBudget YearTABLEBudget Year+1+2<strong>2011</strong>/12 <strong>2012</strong>/13 2013/14CAPITAL FUNDING BY SOURCE Budget Budget BudgetR'000 R'000 R'000E F GNational GovernmentAmounts allocated / gazetted for thatyear 38 288 42 368 45 149Amounts carried over from previousyears 0 0 0Total Grants & Subsidies - NationalGovernment 38 288 42 368 45 149Provincial GovernmentAmounts allocated / gazetted for thatyear 0 0 0Amounts carried over from previousyears48 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Total Grants & Subsidies - ProvincialGovernment 1 200 1 254 1 310<strong>District</strong><strong>Municipality</strong>Amounts allocated for that year 0Amounts carried over from previousyears 0Total Grants & Subsidies - <strong>District</strong>Municipalities 0 0 0Total Government Grants &Subsidies 39 488 43 622 46 459Public Contributions & Donations 0Accumulated Surplus (Own Funds) 0External Loans 0TOTAL FUNDING OF CAPITALEXPENDITURE 39 488 43 622 46 45949 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>PROJECTED OPERATING EXPENDITUREMedium Term Revenue and ExpenditureFrameworkBudgetYearBudgetYearTABLE 2Budget Year+1+2<strong>2011</strong>/12 <strong>2012</strong>/13 2013/14OPERATING EXPENDITURE BY VOTE Budget Budget BudgetR'000 R'000 R'000E F GExecutive & Council 7, 302 128 7,705 081 8,169 166Finance & Admin 8,934 344 9,583 014 10,327 197Planning & Development 1,488 1,645 1,727Health 31 0 0Community & Social Services 2,499 2,624 2,756Housing 465 488 513Public Safety 350 368 386Sport and Recreation 439 461 496Environmental Protection 0 0 0Waste Management 2,729 2,866 3,009Road Transport 6,075 6,379 6,921Electricity 11,551 12,116 12,70950 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>OPERATING EXPENDITURE BY VOTE 43,872 44,741 47,200PROJECTEDREVENUEMedium Term Revenue and ExpenditureFrameworkBudget YearBudget YearTABLE 1Budget Year+1+2<strong>2011</strong>/12 <strong>2012</strong>/13 2013/14REVENUE BY SOURCE Budget Budget BudgetR'000 R'000 R'000E F GRevenue by SourceProperty rates 6,502 6,596 6,967Property rates - penalties imposed andcollection chargesService charges - electricity revenue fromtariff billings 11,552 11,942 13,490Service charges - refuse removal fromtariff billings 2,734 2,866 2,930Service charges – other 657 730 734Rental of facilities and equipment 436 447 520Interest earned - external investmentsInterest earned - outstanding debtors51 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Fines 2,830 3,000 3,000Licenses and permits 2,953 3,723 3,790Government grants & subsidies 16,208 15,439 15,769Total Revenue By Source 43,872 44,741 47,20052 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Risk Assessment and ManagementThis refers to the proactive mechanism of managing potential hazards to the municipalsystems. Risks defined as either of external or internal origin must be minimized in theorganization. The municipality has engaged a process of developing a risk managementpolicy for 2009/10. Amongst other things the policy will deal with potential risks at strategic,operational and financial levels and procedures to be followed in due course.Revenue enhancement measuresThe municipality has filled vacancies in the unit and hence provided training to the new staffto improve efficiency and productivity in the usage of billing system. Amongst otheractivities, the municipality has created a register for indigent. To promote higher recovery,the municipality shall afford discounts to willing debtors.Revenue by SourcesoooooooooEquitable shareOther grants ( MIG/ DOH/DED/DLGTA)VAT RecoveryLicences and PermitsInterest Earned-Outstanding DebtorsOther Service ChargesInterest Earned- External InvestmentsRental of Equipment and FacilitiesFines53 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Workplace Skills PlanThe Skills Plan has revealed that, the municipality require reviewing the organogram to fitthe new position of Supply Chain Manager (Level 3) in order to be a devoted manager of thesection unlike at present moment where Manager Expenditure is also Head of SCM Unit.3.4.1 Finance StrategySound Financial Management and Planning remain a top priority of<strong>Umuziwabantu</strong><strong>Municipality</strong>. Therefore the following strategies and policies have beendeveloped or underdevelopment to ensure that a good financial steed in maintained.Budget Policy (Reviewed)The Budget Policy gives guidance to the basis, format and information thatmust be included in the budget documentation. In addition to the policy thebudget process is supported by a range of circulars which include annualbudget assumptions.Indigent Policy:ReviewedThe aim of this policy is to create an enabling environment in which afinancially sustainable municipal service can be offered, given that many ofthe residents cannot afford to pay for those services due to socio-economichardships.Asset Management Policy: ReviewedoThe purpose of this policy is to ensure that Municipal Fixed Assets are: Acquired Safeguarded Controlled Accounted for, and Disposed OffIn terms of Municipal Finance Management Act (MFMA) Act 56 of 2003 requirementsand applicable accounting pronouncements.54 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Debt and Credit Control: ReviewedThe strategic aim of this policy is to create an environment in which theobjectives of credit control and debt collection can be realised.Petty Cash Policy: ReviewedThis policy is there to give guidance with regard to purchases of small itemswhilst fostering adherence to the SCM policy.Payments Policy:ReviewedThis policy is there to ensure that the municipality pays for goods andservices that have been delivered to the municipality and within voted funds.It further ensures that there are appropriate internal controls with regard topaymentsAnticorruption Strategy:ReviewedThe aim of the policy is to assist prevent corruption expenditure budget andensure that the municipality does not incur unauthorised expenditure beforecompilation of the adjusted budget.Investment Policy: ReviewedThe document aims to guard the activities of responsible financial officials tomanage cash flow and municipal investmentsSupply Chain Management Policy:ReviewedThis policy is there to control acquisition procedures and to ensuretransparency and fairness.Fleet Management Policy: ReviewedThis policy exists to control the usage of vehicles and procedures to befollowed when involved in accident55 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER FOUR4.1 MUNICIPAL TRANSFORMATION AND INSTITUTIONALDEVELOPMENT4.1.1 Municipal Structure<strong>Umuziwabantu</strong> municipality is a category B municipality using an executivecommittee system. <strong>Umuziwabantu</strong> Council has a total of 18 councillors four of whomare full time. There are two political parties represented in council; the AfricanNational Congress and Inkatha Freedom party with the former being represented by12 councillors (66.67%) and the latter by 6 (33.33).Council has five portfolio committees: Finance; budget and Corporate Services Planning; Housing; LED and infrastructure Community Services Human Settlement Forum <strong>IDP</strong> ForumPORTFOLIO COMMITTEE TERMS OF REFERENCEFinance; budget andCorporate Services Municipal finance including billing; Municipal rating and taxation; Municipal insurance; Municipal banking and investments; Loans and governmental subsidies; Grants in aid Labour Relations Occupational Health and SafetyCommunity Services Squatting; Groups with special needs (youth; women;elderly and the disabled); Street Vending; Education, crèches, welfare in general andreligious services; HIV and AIDS Business licensing;56 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Planning; LED; Housingand Infrastructure<strong>IDP</strong> FORUMHuman SettlementForum Cemeteries and crematoria; Refuse removal, refuse dumps and solid wastedisposal; Cleansing, road and storm water maintenance;and Building maintenance Disaster management Traffic services Fire fighting services Local economic development; Promotion of industrial development; Land matters; Rendering of basic services Electricity and gas reticulation; Storm water management systems in rural andurban areas; Capital roads items and construction; Storm water capital items; Housing Projects; Housing development; and Housing Projects administration Coordinate and facilitate <strong>IDP</strong> Projects Debates and review <strong>IDP</strong> objectives Integrates sectoral and other stakeholdersstrategic plans Propose recommendations to both Exco andCouncil Integration and formulation of projects Housing development; and Housing Projects administration4.1.2 Municipal administrationThe administration, as appropriately delegated, has a responsibility to support theCouncil in exercising its powers and functions in the followings ways: It has to support the political structures in performing the political functions.These include the Council itself, the offices of the Speaker, the Mayor andthe Executive Committee as well as Council Committees.57 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong> It also has a responsibility to support the functioning of communityparticipation structures as required in Chapter 4 of the Municipal SystemsAct. These include ward committees. Lastly, it has to ensure that services that are incidental to the exercise of themunicipality‟s powers and functions are delivered.The current municipality council has eighteen councillors while the new council willhave nineteen councillors and 155 staff. The administration has four departments:MUNICIPAL MANAGERCHIEF FINANCIALOFFICERCOORPERATESERVICES MANAGERMANAGER TECHNICALSERVICE Finance Technical Services Corporate Services Office of the Municipal ManagerThere is a possibility of creating another directorate which will incorporate fire anddisaster management issues especially that <strong>Umuziwabantu</strong> has over 20% coveredwith forestation. The municipal organogram is reviewed annually with the <strong>IDP</strong>.58 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>4.1.3 SWOT AnalysisStrengthsWeaknessesCritical Positions are filledLack of Employment opportunities Good relationship between themunicipality and community Good relationship betweenadministration and politicalleadership No comprehensive and coordinatetourism developmentstrategy Lack of solid partnerships fortourism developmentGood natural attractionsExisting and functional LED forumwith sub sectors within the LED Limited involvement of localcommunities Weak service levelsPolitical StabilityVery limited skills basePoor infrastructure in rural areasSlow land reformOpportunitiesThreatsExcellent opportunities to developLack of financerural areasLabour turnoverIncreasing tourism demand fortourist activities that natureHIV/AIDSreserve can offerCrime New group of travellers indomestic market can be tapped Good comparative advantage Few opportunities to growcapacity in terms of tourismtraining/ mentoring Rural communities have mistrust59 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Large pool of potential labourOther sectors such as agriculture/manufacturing can be linked withtourismForestry can be used for LEDadvancementof tourism seeing it as a „‟whiteman‟s thing‟‟No investment opportunities forSMMEs/ BEE companies4.1.4 Skills DevelopmentThe municipality is facing a big challenge of the shortage of skills more especially inthe technical and finance departments. The shortage of skills presents itself as boththe absence of people and the occupation of positions by under qualified people.During the last three financial years the training and development budget wasmainly utilized in the financial management, project management; trafficmanagement and general management and leadership. These programs includedthe councillor development. A skills development committee has been established toidentify the skills gaps within the municipality and ensure that employees areregistered with accredited institutions to close the gaps.4.1.5 Annual ReportThe Annual Report was tabled to council in February <strong>2011</strong> and the oversight reportwas adopted in March <strong>2011</strong>.4.1.6 Auditor General’s Report and management response<strong>Umuziwabantu</strong> got an unqualified audit opinion for a third time in succession withthe following matters of emphasis:60 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>NO FINDING CORRECTIVE ACTION RESPONSIBLEPERSON1 Unauthorised expenditure Finance to ensure that the supply CFOR430 459chain management policy is adheredtoo and ensure pre approval for allexpenditures2 Irregular expenditure Finance to ensure that the supply CFOchain management policy is adheredtoo and ensure pre approval for allexpenditures3 Fruitless & wasteful To ensure that only budgeted CFOexpenditureprogrammes and projects areprocessed4 Material losses Aggressive enforcement of the CreditControl, Debt Collection and theftCFOThe responses and a plan to the findings were tabled to both the Audit Committee and tocouncil in the presence of the AG.4.1.7 Existing Inter-Municipal StructuresThe municipality is participating in the following district coordinated structures: <strong>District</strong> Intergovernmental Relations Forum Speakers Forum Municipal Managers Forum Chief Financial Officers (CFOs) Forum HR Managers Forum: HR managers of each municipality comprise this forum Skills Development Facilitators forum: This forum includes HR Managers and SkillsDevelopment Practitioners of the municipalities Disaster management forum LED Chairpersons Forum Planners forum: this forum includes <strong>IDP</strong> managers and Development Planners61 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>4.1.8 Turnaround StrategyIn April the municipality adopted the turnaround strategy as per the cabinetresolution; that each municipality had to develop one for implementation in 2010.Here below are ten focal priorities for the <strong>Umuziwabantu</strong>: Access to electricity, management and maintenance Access roads (new) and maintenance of municipal roads Formalisation of informal settlements Broader public participation policies and plans (Implemented framework) Public Communication strategy Complaints management system and Front desk interface. Delegation of functions between political and administration Councillor Oversight Framework (functioning SCOPA) Improvement of Percentage MIG expenditure Refuse removal and solid waste disposalEach of the above focal priorities is elaborated on under strategies in chapter 6.62 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER FIVE5.1 GOOD GOVERNANCE AND PUBLIC PARTICIPATIONIn terms of section 151 of the Constitution, the executive and legislative authorityof a municipality is vested in its Municipal Council.5.1.1 Powers and functions of <strong>Umuziwabantu</strong> Local <strong>Municipality</strong>Specific functions and the way that the responsibilities for these functions areallocated to the 3 different spheres of government are detailed in Schedules 4 and 5of the constitution. Schedules 4B and 5B identifies those functions allocated to localgovernment.These Schedules read together with section 84 of the Local Government: MunicipalStructures Act provide the distinction between services which can be delivered bydistrict municipalities and those which can be run by the local municipalities.<strong>Umuziwabantu</strong> <strong>Municipality</strong> has been allocated powers and functions reflected in thefollowing table in terms of the Constitution and the Municipal Structures Act no 117of 1998. Over and above the MEC for local government determined that the districtfunctions of fire fighting and roads are allocated to <strong>Umuziwabantu</strong>.Part B of Schedule 4 Part B of Schedule 51. Air pollution2. Building regulations3. Child care facilities4. Electricity reticulation5. Fire-fighting services6. Local tourism7. Municipal airport8. Municipal planning13. Amusement facilities14. Billboards and displayadvertisement in public places15. Cemeteries, funeral parloursand crematoria – including theDM function16. Cleansing17. Control of public nuisance18. Control of undertakings that sell63 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>9. Municipal transport10. Pontoons, fairies, settees, piersand harbours excluding theregulations of international andnational shipping11. Storm water managementsystem12. Trading regulationsliquor to the public19. Facilities for theaccommodation care and burialof animals20. Fencing and fences21. Licensing and controlling ofundertakings that sell food tothe public22. Local sport facilities23. Markets24. Municipal abattoirs25. Municipal parks and recreation26. Municipal roads – including theDM function27. Noise pollution28. Pounds29. Public places30. Refuse removals, refuse dumpsand solid waste disposals –including the DM function31. Street trading32. Street lighting33. Traffic and parking34. Municipal public works only inrespect of the needs of themunicipalities – including theDM function5.1.2 Shared Services<strong>Ugu</strong> family of municipalities identified several functions which were seen to be verycostly and complicated for each municipality to establish. The advantages of sharingservices are: Benefitting out of the economies of scale Sharing of experience Ability to recruit the scarce resource persons jointly Planning at a macro level64 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>The following services have been established as the shared services or in theprocess of being established:5.1.3 Internal Audit and the Audit CommitteeThe <strong>Ugu</strong> family of municipalities <strong>Municipality</strong> established an Audit Committee as anindependent advisory body in terms of Section 166 (1) of the Local Government:Municipal Finance Management Act, 2003 (the MFMA). The Audit Committeeestablished in terms of Section 166(1) of the MFMA also fulfils the functions of aperformance management audit committee constituted in terms of Regulation 14(2)of the Local Government: Municipal Planning and Performance ManagementRegulations, 2001. The internal audit as well is established and services all sevenmunicipalityAll municipalities contribute financially and have the equal share of time. This is mostsuccessful shared service to date.5.1.4 Fire Fighting ServicesThis service is shared in a different manner. Given the vastness of the district areathe municipalities were clustered in two groups of three in terms of geographicproximity. <strong>Umuziwabantu</strong> is in the same cluster with Ezinqoleni and the HibiscusCoast <strong>Municipality</strong>. The cluster will have a central command but the resources aredecentralized equitably to three municipalities.5.1.5 Development Planning Shared ServicesThis shared service includes the following functions: Strategic Planning Spatial planning Development Administration Performance Management Information Management65 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Building Inspections and Control5.1.6 <strong>IDP</strong> Process PlanThe 2010 / <strong>2011</strong> <strong>IDP</strong> Review Process Plans of the <strong>District</strong> and its Local Municipalitieswere prepared in line with the <strong>IDP</strong> Framework Plan of the district as agreed by allthe Municipalities in the <strong>District</strong>. In 2008 the <strong>Ugu</strong> <strong>District</strong> <strong>Municipality</strong>, in pursuit ofthe relevant legislative directives, adopted its 2010/<strong>2011</strong> <strong>IDP</strong> Review FrameworkPlan to guide its process plans and consequently, the <strong>IDP</strong> process plans of both thedistrict itself and the local municipalities within the area of its jurisdiction. This wasdone in consultation with the local municipalities through <strong>IDP</strong> Managers Forums, <strong>IDP</strong>Representative Forums, Steering Committees, EXCO and the Councils of therespective municipalities.The <strong>IDP</strong> Framework Plan provides the linkage for binding relationships to beestablished between the district and its family of local municipalities. In so doing,proper consultation, co-ordination and alignment of the review process of the <strong>District</strong><strong>Municipality</strong> and its various local municipalities has been maintained. The ProcessPlan is attached overleaf as an Annexure.5.1.7 SPECIAL PROGRAMMES<strong>Umuziwabantu</strong> has launched the following functions/ structures:◦ People with Disabilities Forum◦ <strong>Umuziwabantu</strong> Youth Council (local level)◦ Youth Forums at ward level◦ <strong>Umuziwabantu</strong> Gender council (local level)◦ Gender forums at ward level◦ Senior citizens‟ Forum◦ Arts and culture forum◦ <strong>Umuziwabantu</strong> Local Aids Council66 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>For each of these programmes there is dedicated funding and two managerialpositions have been created in the Municipal Manager‟s Office for youth and for allother special programs. Through these structures the municipality ensure that thepublic is consulted on continuous bases, as resolutions taken from these structuresfilter through to the community services portfolio committee ultimately the council.SPECIAL FOCUS GROUPSGENDER, PEOPLE WITH DISABILITIES AND YOUTHGroup Programme Long TermGoalsBudgetTime FrameHIV/AIDS Council reestablishedEmpowermentand skillsDonePEOPLEDISABILITIESWITHForum has beenEstablishedEmpowermentand skillsR750 000DoneYOUTH Youth Councils Empowerment,education andskills developmentDoneSENIOR CITIZENSForum has beenDoneEstablishedWOMENForum has beenEmpowermentDoneEstablishedand skills67 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>5.2 GOOD GOVERNANCE5.2.1 <strong>Umuziwabantu</strong> Audit Report Findings for year end 30 June 2010Here below are the findings of the Auditor General‟s Office for the financial yearending in June 2010 and the action plan:NO FINDING CORRECTIVE ACTION COMPLETIONDATEFANANCIALS MATTERS OF EMPHASISUnauthorized 1Expenditure – ofR430 459 was incurred as aresult of overspending onDepreciationFruitless 2 & Wasteful Expenditure- ofR7849 was incurred due to interestOn overdue accountIrregular 3 Expenditure- ofR1500 was incurred as propersupply chain procedures werenot followedMaterial 4 Losses amounting tothe value of R1,678 Million wasincurred due to electricitydistribution losses (3,931,215KwH)Material M under spending of thebudget, a under spendingamounted to R 7 876 650.Under spending occurred dueto Housing Projectexpenditure, employee relatedcost, general expenses andThe municipality is to doa thorough analysisbefore engaging withthe budget and willbudgeting accordinglyduring adjustmentBudget TimeThe municipality willmonitor all accounts andensure that all are paidon time.To ensure all SCMprocedures are followedfor all expendituresAggressive enforcementof the Credit Control,Debt Collection andtheftTo engage provincialhousing department toconclude all processesso that project canproceedMarch <strong>2011</strong>December2010December2010October 2010January <strong>2011</strong>RESPONSIBLEGENERALMANAGER ORMANAGERCFOCFOCFOCFOMM, CFO68 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>bulk purchases - electricity<strong>Umuziwabantu</strong> Audit Findings for year end 30 June 2009NO FINDING CORRECTIVEACTIONMATTERS AFFECTING THE AUDIT REPORT1 Expenditure: Lowestquotation not selectedpage 13 of theManagement reportTo enforce thesupply chainmanagement policyParagraph 18.2COMPLETIONDATEJanuary <strong>2011</strong>RESPONSIBLEGENERALMANAGER ORMANAGERCFO2 Interest of overdueaccountPage 13 of theManagementReportThe municipality willmonitor all accountsand ensure that allare paid on time.January <strong>2011</strong>HOD‟S3 Purchases & Payables-Transactions not paidwithin 30 days of receiptof invoicePage 15 of theManagementPortfolioManagement tomake sure allpayments aretimorously and ifthere are issues onthe payment, it besorted out and paidin timeJanuary <strong>2011</strong>HOD‟S4 AOPI- Inadequate contentof the IntegrateDevelopment Plan(Page 15 of theManagementPortfolio)Planning Unit toreview and ensurethat within the PMS,KPI‟s are included.Improvement willbe done on theReview Draft <strong>IDP</strong> tobe tabled to thecouncil 25 of March<strong>2011</strong>January <strong>2011</strong>MM5 AOPI: No performancecontracts in filePage 16 of theManagementManagement toensure that allperformancecontracts are signedDecember 2010MCS/MM69 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Reporttimorously6 AOPI: Reportedinformation not consistentwith planned objectives,indicators and targetsPAGE 17 OF THEManagementReportImprovement willbe done on theReview Draft <strong>IDP</strong> tobe tabled to thecouncil 31 of March<strong>2011</strong>, but it doescontain objectives,Strategies andprojects. The KPIand targets arecontained in thePMS/BIDMarch <strong>2011</strong>MM7 AOPI: Reasons for majorvariances betweenplanned and actualreported targetsPage 17 of themanagement reportA reportingtemplate withcorrective mergerswill be createdMarch <strong>2011</strong>MM8 AOPI: Planned andreported performancetargets not specific andmeasurablePage 20 of themanagement reportA specific target willbe set and it willalso measurable KPIMarch <strong>2011</strong>MM9 AOPI: Incompletereporting on allpredetermined objectivesPage 21 of themanagement reportThe municipalityplanning unit willensure all settargets/objectivesare reportedMarch <strong>2011</strong>MM10 AOPI: Changes to plannedperformance informationnot approvedPage 21 of themanagement reportThe municipality willensure that alladditional adjectivesare approved in theSDBIPJune <strong>2011</strong>MM<strong>Umuziwabantu</strong> Audit Report Findings for year end 30 June 2009NO FINDINGS CORRECTIVEACTION COMPLETION RESPONSIBLE GENERAL70 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>DATEOTHER IMPORTANT MATTERS(EMPLOYEE COSTS)1 Employee Costs –Overtime exceeding 30%of income limitPage 23 of theManagementReport2 Employee Cost – FringebenefitsPage 24 of theManagementReport3 Employee Cost – Nodetails on capturing ofleave formsPage 24 of theManagementReportThe municipality hassuccessfullyestablished controlsto ensure thatemployees don‟texceed the limit setas per basicconditions of serviceManagement willensure that thefollowing isdisclosed correctlyand is included inthe employee‟s IRP5Corporate servicewill ensurecapturing done allleaves takenDecember2010December<strong>2011</strong>January<strong>2011</strong>MANAGER OR MANAGERHOD‟SMM/CFO/MCSMSC4 Lack of procedures foridentifying subsequenteventsPage 25 of theManagementReportProcedures will bedevelopedaccordinglyJanuary<strong>2011</strong>MM5 Inventory – Stock lossapprovalPage 26 of theManagementReportManagement toprovide mitigationstrategies to preventstock loss, and toensure approval bycouncilJanuary<strong>2011</strong>MCS/CFO6 Fixed assets – Control forclassification of leasesPage 26 of theManagementLease agreementswill monitored toensure control isappliedJanuary<strong>2011</strong>MCS71 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>ReportNO FINDING CORRECTIVEACTION7 Fixed Assets –Reconciliation for GL andFAR done once instead ofmonthlyReconciliation willdone monthlyJanuary<strong>2011</strong>RESPONSIBLEGENERAL MANAGEROR MANAGERMCSPage 27 of theManagementReport8 Fixed Assets – FixedAssets register does notcomply with the format ofthe policyPage 27 of theManagementReportFixed assets registertemplate will bechanged to be I linewith the format onthe policyJune <strong>2011</strong>MCS/HOD‟s9 Fixed Assets – Assets arenotbar-codedPage 29 of theManagementReportCoding of all assetsto be doneJune <strong>2011</strong>MCSNO FINDING CORRECTIVEACTIONOPERATIONAL EXPENDITURE10 Expenditure – Controls onreceipt of goods notimplementedControl measureswill be put in placeCOMPLETION DATEJune <strong>2011</strong>RESPONSIBLEGENERAL MANAGEROR MANAGERMCS/HOD‟sPage 29 of theManagementReport72 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>11Procurement and contractmanagement – No specificmeasures included in thefraud prevention planPage 30 of theManagementReportTo review the fraudplan to ensure theinclusion of controlmeasuresJune <strong>2011</strong>MCS/HOD‟sREVENUE12Revenue – Lack ofmonitoring anddocumentation of finesPage 31 of theManagementReportDocumentation offines to be createdand monitoringmechanism to beestablished.June <strong>2011</strong>M Tech Services/MM13Revenue – Electricitydisconnection not donetimorouslypage 31 of theManagementReportTechnical serviceshave been engagedand disconnectionwill be performedtimorously.January<strong>2011</strong>M Tech Service73 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>5.2.2 Ward Committee skills PlanWard committees were established in 2006 in all nine wards of the municipality andare all functional. To ensure a professional co-ordination of information from thecommunities to the municipality the functionality of this structure is critical.Therefore SALGA through the office of the Speaker has conducted skills audit forward committee members to survey the levels of education and skills. Theprogramme is aimed at enabling local government to develop through serviceproviders adequate interventions to skill ward committees so that they can executetheir duties as the mediator between people and Council better. <strong>Umuziwabantu</strong><strong>Municipality</strong> has committed itself to pay seating allowances or stipends to membersof ward committees a sum of R250 Monthly.Programmes Budget estimates Execution DateMonthly Meetings R20 250.00 Once every MonthQuarterly workshops R100 000.00 QuarterlyPublic Education R50 000.00 n/a<strong>IDP</strong>/Budget Road shows R110 000.00 April/ May.74 | P a g e


5.2.3 ENVIRONMENTAL MANAGEMENT<strong>Umuziwabantu</strong> Strategic Environment Assessment (SEA)The SEA is a Strategic environmental management tool which guides development ofthe municipality, informed decision-making and environmental and socio-economicprojects. The SEA project is funded by the Department of Agriculture, Environmentand Rural Development and the <strong>Ugu</strong> <strong>District</strong> <strong>Municipality</strong>. The objective of such astudy (SEA) is to have a „detailed environmental layer‟ augmenting the <strong>IDP</strong> process.o the SEA becomes the foundation to integrated sustainable planning;o informs the <strong>IDP</strong> and its spatial development framework (SDF) ;o delivers a strategic environmental management plan (SEMP);o is able to guide day to day development applications;The draft SEA Document is attached as an annexure73 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Strategic Priority Departments Indicator Status Quo ResponsiblepersonHere below is the status quo of the environmental management at <strong>Umuziwabantu</strong>74 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>EnvironmentalSector Plans1 SEAs in the pipeline(Ph1) –<strong>Umuziwabantu</strong><strong>Ugu</strong>/DAEARD–Env ServicesIWMP – <strong>District</strong>-wide.Tender awarded<strong>Ugu</strong> DM,Greeninginitiatives Greening projectsNursery for traditionalhealers for medicinalplantsDEARDEKZN WIldlife Invasive AlienSpecies Programe –<strong>Umuziwabantu</strong> LM –R2,3m.EnvironmentalEducation andAwareness Educators andlearners, youth,traditional healersand leaders, CDWs,<strong>Ugu</strong>/DAEARD–Env Services Workshop onenvironmentconducted forcouncillorsDAEARD,EKZNW, UGUDMEnvironmentalImpactManagementSupport and advisoryrole to thecompetent authorityonbiodiversity/ecosystem specialist advice Authorization issuingfor the submittedand qualifyingprojects.Ms BiancaMcKelveyDAERD – UGURegionalOfficeEKZN-WildlifeDAEARD - Toolkit - Guidelinedocumentdeveloped forconsultants detailingwhat exactly EKZNWlooks for during EIAsto avoid delays in EIAand land-useUGU RegionalOffice, UGUDM75 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>changeapplications.Thisdocumentestablishes normsand standards for (i)undertakingspecialistinvestigations, and (ii)the incorporation ofspecialist findingsandrecommendationsinto a project SEA development –proactive tools thatcould potentiallyreduce the length ofEIAsLawenforcementVoluntarycompliancebiodiversityconservationtoEKZN-WIldlifeThrough daily visible patrolsthat are carried out by FieldRangers along fences, trails &at night.Awarenessprogrammes thatfoster compliance,e.g. (compliance,awareness research,monitoring andeducation)programmeAnti-Poachingprogramme throughfield rangersvehicles in field to react topoaching terrestrial FieldRangers & officers within <strong>Ugu</strong>to deal with poachinghotspots(DAEARD Outside the76 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>protected areasunder the KZNOrdinance – permits,licenses for keepingin captivity offauna/flora, permitsfor trimming trees,etc-UMuziwabantu 1Conservation ManagerComplaints on noncompliance/illegaldevelopments–StrategicPriority 10:building adevelopmentalstate includingimprovementof publicservices andstrengthensdemocraticinstitutions,AllgovernmentdepartmentsDecentralizationnNo of offices on theS. Coast –offices inALL LMs with...Live broadcasts onRadio stations, webbasedsystems andmagazines forcomplaints/compliments, telephonehotline for someprogrammesEKZNWManagement;DAEARDDEA- NationalRegional/districtOffice with 5directoratesDeployed officials forprojectmanagement andimmediateassistance77 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>TABLE 2: MORE DETAILED INFORMATION FROM THE ABOVE TABLETABLE 2: Project/Program Progress Report Template for 2009/2010 Financial Year(on what was plannedlast year for <strong>Umuziwabantu</strong>)Programand ProjectProjectdescriptionTargetedbeneficiarypermunicipalityand wardExpectedoutcomesProgress todateChallenges Budget Responsible personGreeningProjectsIdentification anddevelopment greeningprojects forlow incomehouses1.Jobcreation2.PlantingTrees3.Trainingpeople4.GreeningHousesThebeneficiaries do nottend thetrees e.g.wateringthem, leftto livestockto graze onTheft oftrees by bypassersashouses arenot fencedoffDAEARD –UGuRegionalOffice –- Thestipendgiven topeopleplantingthe trees istoo little.- Funds arenotsufficient tocompletethe projectsonce off.- Otherbeneficiaries do notlike/takethe trees atall.EnvironmentalEducationandEnvironmentaleducationfor focus<strong>Ugu</strong> DMand LM (perschedule)EnvironmentalawarenessandSomerolledoutwhileMonitoringandensuringthat theDAEARD –UGu<strong>District</strong>Office – (in78 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>awarenessgroups e.g.youth,traditionalleadersandhealers,plannersandengineers,educators,clean-upcampaignsinformationsharingsomeare atplanningstagetrainedbeneficiaries docascadetheknowledgeto thecommunities at largecollaboration with<strong>Ugu</strong> DMand othermemberdepartments andpublicentities)Development anddissemination ofinformationmaterial tobeneficiariesStrategicenvironmental planningStrategicEnvironmentalAssessment(SEA) andIntegratedWasteManagement Plan(IWMP)<strong>Umuziwabantu</strong> LM(SEA);Strategicenvironmentalmanagement tools toguidedevelopment,informeddecisionmakingandenvironmental andsocioeconomicprojectsSEA inthestatusquophaseSEA –R500,000fromDAEARD,R150,000from<strong>Ugu</strong>DM;DAEARD –UGuRegionalOffice<strong>Ugu</strong> DMMuziwabantu LMLawenforcementEnforcement andCompliancemonitoringto projectsauthorised<strong>District</strong> andall LocalMunicipalitiesCompliancemonitoringandenforcement by allThis isanongoingexercisedirected bydemandLimitedPersonnelandvehiculartools toenabletimeousresponseLack ofenvironmentalawarenessR0, 0079 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>by thepublic anddeliberatenoncompliance by thosewho areaware.Lack ofenforcement tools tootherinstitutionshenceresponsibilities shifted toDAEARD.Environmental lawenforcement vscooperativegovernanceEnvironmental ImpactManagementConductingenvironmental impactassessmentfor all thesubmittedprojectsthat fallunder listedactivities inthe EIARegulations<strong>Ugu</strong> DMandapplicantLMInformeddecisionmakingonthe natureofdevelopment inappropriate spotsThis isanongoingexercise<strong>Municipality</strong> notfactoring intimerequired forEIA inprojectplanning.Perceptionthat EIAprocessdelaysdevelopment.R0, 00 DAEARD –UGu<strong>District</strong>Office –80 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER SIX6 DEVELOPMENT STRATEGIES6.1 VISIONUMUZIWABANTU VISION STATEMENTTo be a preferred investmentdestination with superior and sustainable servicedelivery.6.2 MISSION STATEMENT<strong>Umuziwabantu</strong> shall create an environment that is attractive to investors,thereby creating jobs and improving the quality of life.6.2.1 STRATEGIC OBJECTIVESTo promote social cohesion and provision of social amenitiesTo ensure sustainable infrastructure investmentTo strategically plan towards development of human capitalTo ensure alignment and integration of strategies, programmes andprojectsTo promote economic development programs and related activities for amixed economy.To proactively plan to reconcile land reform and land claims programmesto sustainable local economic development.Intensify provision of free basic services targeting indigent groupsTo create an enabling environment for local economic development81 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>To vigilantly plan and manage our environmental resourcesTo enhance fight against the spread HIV/AIDS pandemic and otherdiseases82 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>6.2.2 MUNICIPAL STRATEGIC OBJECTIVESKPA: INFRASTRUCTURE AND SERVICESElectricityObjectives Strategies ProjectsTo ensure universal access to electricityUpgrade and maintain existing electricityinfrastructureErection of Electricity mastProvision of free basic electricityReplacement of all updated meters in HardingElectricity MastElectrification of rural householdsInvestigate and implement alternate energyPriority: RoadsObjectives Strategies ProjectsTo ensure effective maintenance , upgrade andconstruction of roads to improve the transport systemwithin the municipalityAlign specific projects with the departments sothat the investment by both spheres iscoordinated and focused Greenfield Roads upgrade Upgrade of Xambu Road in Ward 2 Road Connection to Ncabhela School inWard 9 Upgrade of Peter Mokaba Road in Ward583 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>To develop the maintenance schedule or plan of allroads within <strong>Umuziwabantu</strong>To ensure that all ruralareas are accessible by 2010Compilation of a maintenance scheduleConstruction of access roads in line with theDepartment of Transport’s standardsIdentification of areas which are not accessible Upgrade of Mlolweni to Esikhulu Roadin ward 9 Upgrade of Hawkins StreetDevelopment of a maintenanceschedule for all roadsConsultation of the Department of Transport inall roadconstruction projectsTo grade all rural roads annually Development of grader program for all wards Continuous maintenance of all rural roadsPriority: HousingObjectives Strategies ProjectsTo ensure completion of existing projectsStatus of existing projects needs to bedetermined and ways to ensure timeouscompletion should be found.Finalization of existing projectsIdentify projects which have beenstalled/blocked and solutions to the problemsmust be implemented.84 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>To provide housing to people living in rural areasTo provide housing to individuals living in informalsettlements.To ensure affordable housing for middleincome/subsidy earnersPriority: Waste ManagementInvolvement of Amakhosi in the process iscriticalIdentification of households living in informalsettlementsProvision of houses to low/middle incomeearnersInspection of buildings and properties to ensurecompliance building standardsRural Housing Developmentslums clearance (Mazakhele)Low cost Housing developmentBuilding InspectionsObjectives Strategies ProjectsTo ensure proper registration of the landfill siteTo identify the new developments and assess thecollection service needs that are requiredTo ensure integrated waste management system whichbenefits all residentsConsultation of the department environmentaffairs on procedures and regulationsIncorporation of new developments for a wastedisposal serviceProvision of an integrated waste managementsystemRegistration of landfill siteNew Developments identification andassessmentDevelopment of an integrated wastemanagement planPurchase of skip binsUpgrading of existing land-fill site85 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>To assess the staffing needs on a regular basis andensure that the staff compliment complies with servicedelivery requirements for the <strong>Umuziwabantu</strong><strong>Municipality</strong>Disaster managementContinued training and succession planning toensure continued service deliveryStaff trainingObjectives Strategies ProjectsTo vigilantly plan and manage our environmentalresourcesCreating fire prevention awareness to thecommunitiesFire-fightingFire Inspection & ComplianceRural Fire preventionDisaster prevention, mitigation andpreparednessEstablishment of Disaster Management PlanEnsure preparedness and response to disasters uponoccurrenceDisaster Management PlanTo ensure sustainable infrastructure investment Upgrading of Disaster Management Centre Upgrade of Disaster Management CentreKPA: SOCIAL AND ECONOMIC DEVELOPMENTPriority: Local Economic Development (LED)86 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Objectives Strategies ProjectsTo review the Local Economic Development Strategy Review and implementation of LED Strategy Municipal Wide LED Strategy ImplementationTo establish partnerships with the private business andcommunities to expand local investment anddevelopment opportunitiesTo encourage agricultural and manufacturing projects(Encourage the diversification of the local economy andvalue adding)To support SMMEs, Cooperatives, NGOs and CBOsDevelopmentTo formulate an marketing/investment strategyfor <strong>Umuziwabantu</strong> <strong>Municipality</strong>Priority: Vulnerable groupsEstablish institutional capacity within themunicipality to attend to LED projects.Audit of the agricultural and manufacturingprojectsEstablish strong relations between themunicipality and Farmers AssociationsEstablish Committees with local businessesCreate a SMMEs, Coops, NGOs and CBOsProgrammeMarketing/Investment StrategyInstitutional Capacity BuildingAgricultural and manufacturing projectsEstablishment of CommitteesEstablishment of BusinessChamberCompile a database for SMMEs, Coops, NGOsand CBOsImplement Marketing and Investment strategy87 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Objectives Strategies ProjectsTo ensure that the needs for vulnerable (women,disabled, HIV/AIDS, youth, elderly) groups are takeninto consideration into all Council’s activitiesTo set gender targets (e.g percentage of women whowill be employed on a particular project)To establish an HIV/AIDS Programme or strategyPriority: Social facilitiesFormulate policies to ensure involvement ofvulnerable groups in the Council’s activitiesPresentation of vulnerable groups incommitteesSetting gender targetsEmployment of disabled peopleEstablishment of an HIV/AIDSProgramme/StrategyEstablish local AIDS STRUCTURESFormulation of youth policy framework and forall other vulnerable groupsAssess the number of women and disabledemployed in infrastructural projectsHIV/AIDS StrategyAwareness CampaignObjectives Strategies ProjectsTo ensure that all communities have access tobasic community facilities and social services by 2010To improve sports facilities and opportunities forthe youth by promoting all sporting codes throughoutDetermine needs for additional social facilitiesthrough consultation programmeSport Development ProgrammeEstablishment of sport structures representativeFormulate a policy for the location and provisionof community facilitiesConsultation ProgrammeSports activities and programmes88 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>the <strong>Umuziwabantu</strong> municipal areaTo improve conditions of social facilities in rural areasby December 2014 Maintenance of social facilitiesof all municipal wardsSocial Facilities (such community halls)Maintenance Programme for rural areasTo educate communities about proper utilization ofsocial facilitiesPriority: Safety and SecuritySchedule community meetingsCommunity meetingsObjectives Strategies ProjectsTo ensure provision of a safe environment andreduction of crime within the municipal areaTo encourage formation of policing forums in allmunicipal wardsProvision of safety equipment and environmentFormation of community policing forums (CPFs)Acquisition of Breathalyser machinesCrime consultative meetingsDrivers Licence Bookings and leaner licencebookingsCommunity Policing forumsTo ensure proper involvement of all role players indealing with crime preventionPriority: Poverty AlleviationEstablishment of close relations with the roleplayers especially SAPSCompile Crime Prevention Strategy89 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Objectives Strategies ProjectsTo formulate a Poverty Alleviation Programme andRural Development StrategyCompilation of a Poverty Alleviation StrategyImplementation of a Poverty AlleviationStrategyTo prioritize projects that are focusing on povertyalleviationPrioritize and budget for Poverty AlleviationprojectsPreparation of a Rural Development StrategyCommunity projects such as art and craftsKPA: INSTITUTIONAL DEVELOPMENT AND TRANSFORMATIONPriority: Institutional DevelopmentObjectives Strategies ProjectsTo ensure proper planning for a developmentalmunicipality that complies with regulationsTo ensure fully empowered human resource that willfulfil council mandateReview the <strong>IDP</strong> annually using a publicparticipatory approachDevelop and implement an Annual WorkplaceSkills PlanDevelop an <strong>IDP</strong> process planDevelop a credible <strong>IDP</strong> addressing developmentissues within the municipalityAlignment of <strong>IDP</strong>; Budget & PMSPublic Participation MeetingStreamline and improve recruitment and90 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>selection processesTo ensure that Council has sufficient institutionalcapacity to meet the service delivery demandsAssessment of existing and required skills forCouncil staff.Review of the Skills Development PlanTo formulate a detailed communication strategy Formulate a communication plan Implementation of a Communication PlanTo ensure that the level of illiteracy among elementaryemployees is reduced at least by 10% each yearTo ensure the consolidation and implementation ofPerformance Management SystemTo ensure efficient administration and safe keeping ofcouncil recordsTo ensure fully empowered human resource that willfulfil council mandateUp liftment and improvement of the skills withinthe organizationReview Performance Management System andFull compliance with section 9(1)(b) ofMunicipal Planning and PerformanceManagement RegulationsEnsure the provision of sound and efficientsecretariat support to the organisationAdherence to the Collective BargainingAgreementEfficient disciplinary processesAdult literacy programsImplementation of PMS and monitoring systemas well as the SDBIPCorrect and timeous agendas to all councilmeetingsFunctional Local Labour ForumDisciplinary cases backlog reduction projectKPA: FINANCIAL MANAGEMENT AND VIABILITYPriority: FinanceObjectives Strategies Projects91 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>To increase the <strong>Umuziwabantu</strong> <strong>Municipality</strong>’s revenuebaseTo ensure the alignment of the Municipal budget withthe <strong>IDP</strong> annuallyTo provide assistance to people who cannot afford topay for servicesPayment of CreditorsTo ensure compliance with the Supply ChainManagement PolicyTo prevent over/fruitless and wasteful expenditureTo ensure sound financial management of themunicipalityTo upgrade the municipal IT and Financial System tocomply with the MPRA.Create a Debt Collection planEnsure that Budgeting and Expenditure alignswith the <strong>IDP</strong>Register all the indigent peopleSubmission of invoices on timeEstablishment SCM bid committeesDevelopment and maintenance of MunicipalSuppliers Databasepayment of Salaries, Wages, Allowances andcreditors timeouslyTo implement new MPRA by June<strong>2012</strong>Implementation of the debt collection planCompilation of a Municipal Financial PlanImplementation of the Indigent PolicyKPA: DEMOCRACY AND GOOD GOVERNANCE92 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Executive and councilObjectives Strategies ProjectsTo establish fully functional public participationstructuresTo ensure that the people of <strong>Umuziwabantu</strong> and thepeople in general are kept informed of municipal affairsEstablishment of ward committeesPublic consultation through meetingsFormation of ward committees in all municipalwards<strong>IDP</strong>/Budget road showsTo engage the public regarding MPRA Public consultation on MPRA Implementation of MPRA93 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>6.2.3 DEVELOPMENT STRATEGIESNational KeyPerformanceAreaLocalEconomicDevelopmentMediumStrategicFrameworkTerm(MTSF), 2009 –2014ProvincialpriorityStrategicfocus areaDecent work Thriving andSpeeding uplivelihoodsgrowth andgrowingtransforming theeconomy.economy tocreate decentwork andsustainableStrategic objectives Strategies Programmes Responsible DepartmentTo transform the localeconomy of in amanner that promotesBBBEE.Broad-BasedBlack EconomicEmpowermentUtilize themunicipalforestation toempower andpromote youngblackentrepreneurs.Proper implementation oftheProcurement.PreferentialProvision of profitableagricultural land to SMMEsof the previouslydisadvantageMM& TREASURYLEDUse Municipalownedland andproperties toleverage BBBEEopportunitiesand generaleconomictransformation.Provision of profitableagricultural land to SMMEsof the previouslydisadvantageLED94 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>To promote economicgrowth of the town ofHarding.Land release Development ofcommercial centresBusinessSupportTo promote integratedbusiness support withspecial focus onSMMEsLobby thesmallEnterpriseDevelopmentAgency (SEDA)service toestablishoffices at<strong>Umuziwabantu</strong>.SMME support systemLEDAgriculturaldevelopmentTo promote agricultureto be the backbone of<strong>Umuziwabantu</strong>economy.Linkage ofsmall farmerswith <strong>Ugu</strong> andother MarketsEstablish strongrelations withthe departmentof Agricultureand Amakhosifor the purposeof encouraging;supporting; andallocating landto smallfarmers.UrbanrehabilitationTo develop and promotesustainable service,trade and commercecentres attractive topotential investors.Reconstructionof roads.UrbanProgrammeRenewal95 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>National KeyPerformanceMediumStrategicTermProvincialpriorityStrategicfocus areaStrategic objectives Strategies Programmes Responsible DepartmentAreaFramework(MTSF), 2009 –2014Basic servicesMassiveAccesstoTo ensure universalUpgradeandReplacement of allTechnical Servicesandprogramme toreliable sourceaccess to electricitymaintainoutdated meters ininfrastructurebuild economicof energyby <strong>2012</strong>.existingHardingdevelopmentandsocialelectricityinfrastructureinfrastructureAlternativeWindenergyLEDenergygenerationsources.WastemanagementTo ensure an integratedwaste managementsystem which benefitsmore residentsEnsuringsufficientcapacityRegistration of newland fill siteTechnical ServicesDevelopment of anintegrated wastemanagement planTechnical ServicesUpgrading of the landfillsiteTechnical ServicesTo ensure affordablehousing for middleincome/subsidy earners.Investigate thebest fundingmethod withtheMiddleDevelopmentincomeTechnical Services96 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>department ofhousing; banksanddevelopers formiddle incomeearners.To eradicate informalsettlementsAlignment ofneedycommunitieswith thefundingprogramSlumsprojectclearanceTechnical ServicesTo ensure effectivemaintenance,upgrade andconstruction of roadsto improve thetransport systemwithin the district.Align projectswith thedepartmentsso that theinvestment byboth spheres isfocused andcoordinated,Construction of roadsTo ensure provision offree basic servicesPut in placegoodmonitoringsystem toprevent overdeteriorationof roads.indigentsupportUpdate theindigent database,Treasury & CorporateCommunicationcampaign identifymore indigentpeople,Treasury& Corporate97 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>EconomicDevelopmentComprehensive ruralRuralRural development Revival ofdevelopmentagricultural,developmenteconomyinstrategy linkedrural areasto land andagrarian reformandfoodsecurityMunicipalStrengthen theSkillsTo ensure successiveSupportIdentify scarce skillsCorporatetransformationskillsandDevelopmentleadership within theinternalwithin the organization.andhumanorganisationupwardTrain internal staff.institutionalresource basemobility.Develop managementdevelopmentEstablishtraining course.mentorshipApply for learnerships inprogrammes.the area of scarce skillsSkills transfer tonewincumbents bydeployment ofexperiencedprofessionals.98 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>National KeyPerformanceMediumStrategicTermProvincialpriorityStrategicfocus areaStrategic objectives Strategies Programmes Responsible DepartmentAreaFramework(MTSF), 2009 –2014Invest in staff trainingCorporateand development.Encourage intermunicipallearning visits.Improving ourcommunication unit tobetter respond andinteract with internaland externalstakeholders.to ensure properimplementation ofPMSImplement amonitoringsystem that is99 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>based on the<strong>IDP</strong>, indicatorstargets andtimeframes.100 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Alignment ofindividualperformancewithorganizationalperformance.101 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>To establish andensure functionality ofall core municipalpolicies and systemsas required byOn goingreview ofmunicipaloperationalsystems.legislations.Establishstandardizedset of businessproceduresTo restructure theinstitutional set up forthe enhanced servicesdeliveryanddevelopment,Revieworganogram byrestructuringexistingdepartmentsand units andfilling up criticalposts toenhance bothmanagementand operationsby focusing ondevelopmentand planning,administrationand water,102 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>SpatialStrategicDevelopmentSafe,spatial planningAll sectorsPlanning andEnvironmentPriority 9:Sustainableof humancapacity andeducationtransformedandManagementResourcesustainableManagementenvironmentand Usecreatinghealthierandsustainablecommunities103 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>All sectorsSector planning (waste,water,biodiversity,coastal, air, estuaries,land-use, tourism,climateAirqualityDAEARDchangemanagementugu DMmitigation andDAEadaptationEnvironmentalImpactDAEARDAssessment<strong>Umuziwabantu</strong> LMugu DMEKZNWDisaster Management CentreAmafaaKwaZulu-NtaliEducationandDAEARDAwareness<strong>Umuziwabantu</strong> LM104 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>ugu DMEKZNWDisaster Management CentreAmafaaKwaZulu-NataliDoESouth African WeatherServicesDAEGreeningDAEARD<strong>Umuziwabantu</strong> LMugu DMNGOs<strong>Umuziwabantu</strong>EKZNWServicesDAEDoEAmafaaKwaZulu-Natali105 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Disease control andmanagementDept of Health<strong>Ugu</strong> DMDAEARD-Vet servicesTraditional/indigenousknowledge systemHouse of traditionalAuthoritiesAmafaaKwaZulu-NatalDisaster management<strong>Ugu</strong> DMLMSouth African WeatherServicesreduceEnvironmentalImpactDAERDnegativeAssessmentAll SectorsenvironmentalimpactspromoteandCompliance Monitoringand Enforcementsustainableuse of natural106 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>resources<strong>Umuziwabantu</strong>DAEARD<strong>Ugu</strong> DMLMEducationawarenessandDAEARD<strong>Umuziwabantu</strong>WESSA<strong>Ugu</strong> <strong>District</strong>Sector PlanningAmafaaKwaZulu-Natalensure Strategic planning <strong>Umuziwabantu</strong> LM107 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>effectivewaste<strong>Ugu</strong> DMDAEARD<strong>Ugu</strong> DMmanagementMunicipal Solid Waste<strong>Umuziwabantu</strong> LM<strong>Ugu</strong> DMHealth Care Risk WasteDept of Health<strong>Ugu</strong><strong>Umuziwabantu</strong> LMEducationandDAEARDawarenessDept of Health<strong>Ugu</strong><strong>Umuziwabantu</strong> LMpromoteAlienInvasiveDAEARDenvironmentalProgrammeugu DMprotection and<strong>Umuziwabantu</strong> LMbiodiversityNGOsconservationEKZNWServices108 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>DAEWESSANGOSEnvironmentalAssessmentImpactDAEARD<strong>Ugu</strong> DMLMLaw enforcementDAEARD<strong>Ugu</strong> DMLMEKZNWWESSANGOS109 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>EducationawarenessandEKZNWDAEWESSANGOSDAEARDugu DM<strong>Umuziwabantu</strong> LMSector PlanningAll sectors110 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER SEVEN7.1 SECTOR INVOLVEMENT7.1.2 IntroductionThe intent of this section is to clearly outline how other spheres of government are positioned to render support to the<strong>Umuziwabantu</strong> to achieve developmental objectives and goals contained in the <strong>IDP</strong> and other strategic tools. This is alsoemphasized by the White Paper on Intergovernmental Relations which is aimed to forge partnerships between government,parastatals, NGOs and CBOs communities in the service delivery of integrated services. It does appear though, some departmentlike Department of Transport are still missing in the equation in terms of participation. However other Departments like SocialDevelopment and Welfare, Home Affairs, SAPS, SASSA and Department of Health and Education were very active and passionatewith the integrated development approach to address problems at <strong>Umuziwabantu</strong>.7.1.3 Strategic Objectives1. To create an enabling environment for local economic developmenta. <strong>Ugu</strong> <strong>District</strong> <strong>Municipality</strong>b. Department of Economic Developmentc. Department of Agriculture and Environmental Affairsd. Eskom2. To plan towards development of human capital111 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>a. <strong>Ugu</strong> <strong>District</strong>b. Provincial Department of Local Government and Traditional Affairsc. Department of Provincial and Local Governmentd. SALGA3. To ensure sustainable infrastructure investmenta. <strong>Ugu</strong> <strong>District</strong> <strong>Municipality</strong>b. Department of Local Government and Traditional Affairs (DLGTA)c. Department of Housingd. Department of workse. Department of Transport4. To promote social cohesion and provision of social amenitiesa. <strong>Ugu</strong> <strong>District</strong> <strong>Municipality</strong>b. Provincial Department of Local Government and Traditional Affairsc. Department of Social Development Department of Sports and Recreationd. SAPSe. Department of Arts Culture and Tourism5. To plan and manage environmental resourcesa. <strong>Ugu</strong> <strong>District</strong> <strong>Municipality</strong>b. Department of Agriculture and Environmental Affairs112 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>c. Department of Local Government and Traditional Affairs6. To facilitate access to free basic servicesa. Department of provincial and local governmentb. Department of Local Government and Traditional Affairs7. To support reconcile land reform to land claimsa. Department of Land Affairsb. Department of Local Government and Traditional Affairs8. To promote an economic development programmesa. Department of Economic Developmentb. Department of Local Government and Traditional Affairsc. Provincial Department of Agriculture and Environmental Affairsd. Eskome. Department of Mineral and Energyf. DOTg. Telkomh. Spoorneti. Department of Public Enterprises113 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>9. To create sustainable and socially cohesive Communitiesa. Department of Transportb. Department of Social Developmentc. SAPSd. DLGTAe. Department of Communication10. To enhance fight against the spread of HIV/AIDS pandemic and other diseasesa. <strong>Ugu</strong> <strong>District</strong> <strong>Municipality</strong>b. Department of Healthc. DLGTAd. NGOse. Department of Social Developmentf. Department of Education114 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>7.1.4 PUBLIC SECTOR INVESTMENT ON UGU FAMILY MUNICIPALITIESMTEF ALLOCATION FOR UGUSECTOR DEPARTMENT2009/102010/11<strong>2011</strong>/12UMUZIWABANTU STRATEGIC DIRECTIONSIn R’000In R’000In R’0001. Office of the Premier 4,446 4,780 5,066 To create a sound and stable Municipal administrationTo promote municipality that is free of AIDS/HIV and TBTo promote tolerance, perseverance and participation indevelopment2. Agriculture and Envio. Affairs 21,141 23,428 24,834 To promote employment and self-employment opportunitiesTo support access to land and land tenure improvementTo create a sustainable physical EnvironmentTo promote municipality that is free of AIDS/HIV and TB3 Economic Development 7,211 3,022 3,250 To promote employment and self-employment opportunities115 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>MTEF ALLOCATION FOR UGUSECTOR DEPARTMENT2009/102010/11<strong>2011</strong>/12UMUZIWABANTU STRATEGIC DIRECTIONSIn R’000In R’000In R’0004. Education 1,176,294 1,305,450 1,396,830 To Facilitate access better quality Education and facilitiesTo promote tolerance, perseverance and participation indevelopment5. Health 821,061 925,067 1,079,052 To promote municipality that is free of AIDS/HIV and TB6. Housing 155,610 207,108 212,992 To Facilitate provision of Housing infrastructureTo support access to land and land tenure improvementTo create a sustainable physical EnvironmentTo create sustainable and socially cohesive Communities7. Community Safety and Liaison 4,734 7,717 6,948 To promote tolerance, perseverance and participation indevelopment8. Local Gov, & TraditionalAffairs47,851 66,678 35,818 To promote employment and self-employment opportunitiesTo create a sound and stable Municipal administration116 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>MTEF ALLOCATION FOR UGUSECTOR DEPARTMENT2009/102010/11<strong>2011</strong>/12UMUZIWABANTU STRATEGIC DIRECTIONSIn R’000In R’000In R’000To advance adequate infrastructure provisionTo advance provision of social amenitiesTo support access to land and land tenure improvementTo create sustainable and socially cohesive Communities9. Transport 197,822 247,707 265,203 To promote employment and self-employment opportunitiesTo advance adequate infrastructure provisionTo create sustainable and socially cohesive Communities10. Social Development 83,885 94,776 117,136 To promote employment and self-employment opportunitiesTo advance provision of social amenitiesTo create sustainable and socially cohesive CommunitiesTo promote municipality that is free of AIDS/HIV and TB117 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>MTEF ALLOCATION FOR UGUSECTOR DEPARTMENT2009/102010/11<strong>2011</strong>/12UMUZIWABANTU STRATEGIC DIRECTIONSIn R’000In R’000In R’000To promote tolerance, perseverance and participation indevelopment11. Works 700 700 700 To promote employment and self-employment opportunitiesTo advance provision of social amenitiesTo Facilitate access to better quality Education and facilities12. Arts, Culture and Tourism 17,858 13,462 9,161 To promote employment and self-employment opportunitiesTo advance provision of social amenitiesTo create a sustainable physical EnvironmentTo create sustainable and socially cohesive CommunitiesTo promote tolerance, perseverance and participation indevelopment13. Sport and Recreation 11,285 15,169 16,012 To promote employment and self-employment opportunities118 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>MTEF ALLOCATION FOR UGUSECTOR DEPARTMENT2009/102010/11<strong>2011</strong>/12UMUZIWABANTU STRATEGIC DIRECTIONSIn R’000In R’000In R’000To advance provision of social amenitiesTo Facilitate access to better quality Education and facilitiesTo create sustainable and socially cohesive CommunitiesSource: Budget Vote 1 of KZN Treasury Department <strong>2011</strong>/127.2 SECTOR PLANSThe municipality realises the need for integration of sector plans in order to achieve cross sectional development that is informed from all spheres ofgovernment the following has list is hereby outline below with status quo of the plans development.PLANCOMMENTS/PROGRESSRESPONSIBLE DEPARTMENT/ROLEPLAYERWorkplace Skills Development Plan Completed and was done internally <strong>Municipality</strong>119 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>PLANCOMMENTS/PROGRESSRESPONSIBLE DEPARTMENT/ROLEPLAYERWaste Management Plan (WMP) Funds have been set aside R700 000 <strong>Municipality</strong> & DEAT, DAEA&<strong>Ugu</strong>Disaster Management Plan Being developed R250 000 <strong>Municipality</strong>Land Use Management Scheme Complete. Funds required for review andimplementation of the scheme.<strong>Municipality</strong>Local Economic Development (LED)nStrategyFunding was secured with Gijima KZN (EU) and thestrategy is complete.<strong>Municipality</strong>; GijimaSpatial Development Framework Being developed with the assistance of DBSA Municipalities and DBSAHousing Sector Plan Complete DOH and <strong>Municipality</strong>HIV & AIDS strategy. Adopted plan used by St. Andrews Department of HealthIT Plan. No IT plan in place. Entered into SLA with SETA SETA and municipalityRisk Management Plan BEING DEVELOPED <strong>Municipality</strong>Internal skills Audit Complete <strong>Municipality</strong>Skills Development Plan. Reviewed Annually <strong>Municipality</strong>120 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>PLANCOMMENTS/PROGRESSRESPONSIBLE DEPARTMENT/ROLEPLAYERProperty Rates Policy Reviewed Annually <strong>Municipality</strong>Credit control and debt collection policy. Reviewed Annually <strong>Municipality</strong>Supply Chain Management Policy. Reviewed Annually <strong>Municipality</strong>Preferential procurement policy Reviewed Annually <strong>Municipality</strong>HR Policies Reviewed Annually <strong>Municipality</strong>Town Planning By-laws Developedoutfor public comments <strong>Municipality</strong> and <strong>Ugu</strong> shared servicesIndigent Policy Reviewed Annually <strong>Municipality</strong>Asset Management Policy Reviewed Annually Local municipality121 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER EIGHT8.1 UMUZIWANATU PROGRAMMES AND PROJECTS FOR SERVICE DELIVERYBetween October and November 2010 the council engaged all communities within the municipality in a process ofreviewing the <strong>IDP</strong> through the <strong>IDP</strong> Road shows. The road shows provided an opportunity to all members of thecommunity a platform to input in the <strong>IDP</strong>. Also councillors through <strong>IDP</strong> Forum prioritised capital projects which havebeen included in the budget for the year under consideration. Here below are the projects and programmesNATIONAL KEY PERFORNCE AREAINFRASTRUCTURE AND SERVICE DELIVERYNo. Project Name Area Funding BudgetBudgetbudget12/13NatureTotal09/1010/11Allocation11/12AllocationbudgetAllocationProjectValueM1 Living stone Phase 3 Ward 3 MIG DONE Infrastructure 2 961 392M2 Holman Street Ward 3 MIG DONE Infrastructure 1 000 000M3 Keate Street Phase 2 Ward3 MIG DONE Infrastructure 600 000M4 Patterson Street Ward 3 MIG DONE Infrastructure 2 000 000M5 Electrification KwaJali and Ward9 Dept. Of R10.8m R5m R5m Infrastructure R20.m122 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>NATIONAL KEY PERFORNCE AREAINFRASTRUCTURE AND SERVICE DELIVERYKwaMbotho (Esabelweni)EnergyM6 Town Rehabilitation Ward3 COGTA R11.5m R3.5m Infrastructure R15mLMTarring of the top part ofShepstone streetWARD 3 Mun Infrastructure TBALM1 Regravelling of D926 Ward 1 Mun TBA TBA Infrastructure TBALM1 Mabhungwini Access Road Ward 2 Mun Done R2.2m Infrastructure R2.2mLM1 Mnukwa Road Ward 2 Mun TBA Infrastructure TBALM1 Xambu Ward 2 Mun R1990 600 Infrastructure R1990 600LM1 Street lights –Greenfields Ward 3 Mun Done R500000 Infrastructure R500 000LM1Naming of streets for Mazakhele andGreenfieldsWard 3 Mun Infrastructure TBALM1 Arts Centre Establishment Ward 3 DSR & AC R5 mil Infrastructure R5 milLM1 Construction of Greenfields Roads Ward 3 Mun R3 Mil infrastructure R3 Mil123 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>NATIONAL KEY PERFORNCE AREAINFRASTRUCTURE AND SERVICE DELIVERYLM1Water Main Pipes atEngqungqumeniWard 5 DM Infrastructure TBALM1 Bridge from KwaNhlanza to Mjika Ward 6 Mun Infrastructure TBALM1LM1LM 1LM.2LM2LM2Upgrade Main Road D862 Mkhoba toEsitezi)Constr. Of Access RdHlabe toKwaNgubelangaBridge connecting Mlolweni andEskhuluAccess Road to Cemetery site andone for EdiphiniConstraction of Sontombe SportFieldConstrction of KweLabasha RoadWard 7 Mun Infrastructure TBAWard 8 Mun R2.1M Infrastructure R2.1MWard 9 Mun R5.2 R3 029 322 Infrastructure R3 029 322Ward 1 Mun Infrastructure TBAWard 1 Mun Infrastructure TBAWard 1 Mun Infrastructure TBA124 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>NATIONAL KEY PERFORNCE AREAINFRASTRUCTURE AND SERVICE DELIVERYLM2LM.2LM.2LM.2LM 2LM 2Construction ofKwaLunda(Kwasihoqo)Sport grounds at Esabelweni, Fihla,kwaGasa, Ndlovini,XambuandMpeshuRecreationalPark (play & soccerground)Bridge constr. Nkondwana,Sangulube, ZibiniRiver,Road fromGadenzima to Ntunini, RD fromMpola to JijintabaConstruction of Ntshangwe toEringiniConstruction of Ntshangwe toNyovelaWard 1 Man Infrastructure TBAWard 2 Mun Infrastructure TBAWard 3 Done R4.5m Infrastructure R4.5Ward 4 Mun Infrastructure TBAWard 4 Mun Infrastructure TBAWard 4 Mun Infrastructure TBALM 2 Construction of Ekwalini to Nhlanza Ward 4 Mun Infrastructure TBA125 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>NATIONAL KEY PERFORNCE AREAINFRASTRUCTURE AND SERVICE DELIVERYLM2 Construction of Gadenzimard Ward 4 Mun Infrastructure TBALM 2Construction of Bridge connectingNgunjini to MzukelwaWard 5 Mun Infrastructure TBALM.2 Sport Ground atKoloni Ward 5 Mun Infrastructure TBALM 2 Construction of Peter Mokaba RD Ward 5 Mun R2 026 830 Infrastructure R2 026LM 2 Sport Ground for Ochingweni Ward 4 Mun Infrastructure TBALM.2 Sport Complex for Mdlangathi Ward 6 Mun Infrastructure TBALM 2 Phumza Community Hall Ward 6 Mun Infrastructure TBALM 2 Renovation of Xhamini Hall Ward 6 Mun Infrastruction TBALM.2Gravelling D914, D1032, Access Rdto all schoolsWard 7 Mun Infrastructure TBALM 2 Construction of Hall at Mkhoba Ward 7 Mun R6 254 325 Infrastructure R6 254 325LM 2 Pedestrian bridge over Weza river Ward 7 Mun Infrastructure TBA126 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>NATIONAL KEY PERFORNCE AREAINFRASTRUCTURE AND SERVICE DELIVERYLM 2 Upgrade of D 862 Ward 7 Mun Infrastructure TBALM.2Gravelling access Rd from Shabalalato Shangase (Mkhoba)Ward 8 Mun Infrastructure TBALM 2 Construction of Jabulani Road Ward 8 Mun Infrastructure TBALM 2LM 2LM.2Construction Hlabe Road toKwaNgubelangaMaintainance of Shabalala road toShangaseBridge Bhudlu to Silangwe, Mfila toEdebheni, Mlolweni to EskhuluWard 8 Mun Infrastructure TBAWard 8 Mun Infrastructure TBAWard 9 Mun Infrastructure TBALM.2 Construction of Ncabhela Road Ward 9 Mun R2 198 923 Infrastructure R2 198 923LM 2 Gravelling of D1033 Ward 9 Mun Infrastructure TBADM.1KwaMbotho water extensionsWard 2 DM 3 000000.00Infrastructure 3 000 000.00DM.2KwaMbotho/ KwaFodo Bulk interlinkWard DM Infrastructure127 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>NATIONAL KEY PERFORNCE AREAINFRASTRUCTURE AND SERVICE DELIVERY1&2DM.3KwaFodo Phase 3 to DumisaWard 1 DM InfrastructureDM.5Harding Weza phase 7Ward 7DM2 000 000.00 20 000000 20000 000InfrastructureDM.6KwaMbotho bulk 1Ward 2 DM InfrastructureDM.7Harding Weza water supply-damWard 7DM5 000 000.0025000000.00 25 000000InfrastructureDM.8KwaFodo phase 2 booster pumpstationWard 1DMR7 000 000.00R 48 000000R 45 000000.00128 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong>NATIONAL KEY PERFORNCE AREA<strong>2011</strong>/<strong>2012</strong>Infrastructure Development & ServicesNo. Project Name Area KPI 10/1111/1212/13NatureTotal Projectbudget AllocationbudgetbudgetValueAllocationAllocationLM.3 Construction of KweLabasha Road Mun Infrastructure TBALM.3 Crèche at Bashaweni Ward 2 Mun Infrastructure TBALM.3 Construction of MPCC Mun Infrastructure TBALM.3Upgrade Access Rd fromNtshangwe to NyomvelaMun Infrastructure TBALM.3 Construction of MPCC Mun Infrastructure TBALM.3Building Construction for old ageHomeMun Infrastructure TBALM.3 Constr. of MPCC at Nkungwini Ward 7 Mun Infrastructure TBA129 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>NATIONAL KEY PERFORNCE AREAInfrastructure Development & ServicesNo. Project Name Area KPI 10/1111/1212/13NatureTotal ProjectbudgetbudgetbudgetValueAllocationAllocationAllocationLM.3Bridge for road connectingRoad D907Mun Infrastructure To Be Allocated(TBA)LM.3 Gravelling D1033 Mun Infrastructure TBA130 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>NATIONAL KEY PERFORNCE AREAInfrastructure Development & ServicesNo. Project Name Area Funding 10/1111/12 budget12/13Nature of ProjectTotalbudgetAllocationbudgetAllocationProjectValueAllocationLM.4Ward 1 Mun To identify fundingTo identifyInfrastructuresourcefundingSantombe Sport FieldssourceTBALM4 Hall at Mpeshu Ward 3 Mun To identifyfundingsourceLM4 Upgrading of Sport complex Ward 3 Mun To identifyfundingsourceLM4 Sport grounds at Ocingweni Ward 4 Mun To identifyfundingsourceLM4 Creche Ward 5 Mun To identifyfundingsourceInfrastructureInfrastructureInfrastructureInfrastructureTBATBATBATBA131 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>LM4 Phumza Community Hall Ward 6 Mun Infrastructure TBALM4WezaBridge for Mbuthumaand KwaJaliWard 8 Mun Infrastructure TBALM 4 Construct. Of MPCC for Engele Ward 9 MunNATIONAL KEY PERFORNCE AREAInfrastructure Development & ServicesNo. Project Name Area Funding 10/1111/1212/13NatureTotalbudgetbudgetbudgetProjectAllocationAllocationAllocationValueLM.5Construction MPCC forWard 1 Mun 0 InfrastructureKwaDumisa/ KwaFodoTBALM.5Construction of MPCC forWard 2 Mun 0 InfrastructureEsabelweniLM.5Zelia Homes – EntranceWard 3 Mun 0 Infrastructure&DrivewaysTBALM.5Access Rd from KwaPhondo toWard 4 Mun R2.2m Infrastructure R2.2m132 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>MavetheniLM.5Sanitation, Nongidi,Ward 5 Mun 0 InfrastructureMbangweni&NgunjiniTBALM.5 PedestrianBridge from Ngqolo Ward 7 Mun 0 Infrastructure TBALM.5Construction of an MPCC nextWard 8 Mun 0 Infrastructureto ClinicLM5Uplifting of bridge fromWard 9 Mun 0 InfrastructureEsikhulu to Esitezi ward 8&9TBAPG1Ward 1Dept. ofInfrastructureSantombe ClinicHealth8 405 000PG2Ward 2Dept. ofInfrastructureKwambotho ClinicHealth6 033 005PG3Ward 4Dept. ofInfrastructurePisgah Clinic (Renovations)Health4 534 950PG4 KwaJali Clinic Ward 9 Dept. of Infrastructure 1 511 994133 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>HealthPG 5 Broiler and piggery KZ214 Dept. of Agric Infrastructure 600 000PG 6 Bean & maize production KZ214 Dept. of Agric Local Econ. Dev 900 000PG 7 Marketing of Bean produce KZ214 Dept. of Agric Good Gov. & Participation 60 000PG 8 Food Security KZ214 Dept. of Agric Spatial Development and Env 660 000PG 9KZ214Sport andAwareness campaignsLocal selectionsRecr.3 333.33PG 10KZ214Sport andGood governanceSelections of sport admin.Recr.12 500PG 11KZ214Sport andSport<strong>District</strong> structuresRecr.6 666.6PG 12KZ214Sport andIndigenous gamesTraining Off. And administrat.Recr.100 000PG 13 Identification of hub KZ214 Sport and Talent Identification 80 000134 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Recr.PG 14KZ214Arts, Culture,Support to Arts & CultureArts and Culture ForumsTourism5000PG 15KZ214Arts, Culture,Vis Arts & Craft DevelopmentVisual Arts & CraftTourism20 000PG 16KZ214Arts, Culture,Craft Arts & workshopCraft DevelopmentTourism20 000PG 17KZ214Arts, Culture,Music, song and DanceMusic, Song and DanceTourism40 000PG 18KZ214Arts, Culture,Theatre workshopTheatre ProjectTourism30 000PG 19KZ214Arts, Culture,Theatre workshopFilm DevelopmentTourism15 000PG21KZ214Dept. of160 000 170 000 180 000 Greening of MazakheleGreening of MazakheleAgric&Enviro366 000PG22KZ214Dept. ofDistr. Interg. Waste ManagtSustainable environmentAgric&Enviro827 000135 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>PG23KZ214Dept. of Agric &Strat. Enviro. ManagementEnvironmental PlanningEnviro670 000PG24<strong>District</strong>Dept. of WaterAlien plant removalSustainable environment&Forest10 000000PG 25<strong>District</strong>Dept. of Agric &60 000 75 000 90 000 Health Educ. programmeHealth empowered commun.Enviro225 000PG 26Clean Air<strong>District</strong>Dept. of Agric&Enviro120 000 150 000 170 000 Air Quality Monitoring440 000PG 27Safe Water<strong>District</strong>Dept. of Agric &EnviroEliminate PollutionTBAPG 29Quality food handled hygiene<strong>District</strong>Dept. ofAgric&EnviroFood safety ControlTBAPG 30Healthy Buildings<strong>District</strong>Dept. of Agric&EnviroPlanning and build controlTBAPG 31Ensure sustainable Coastal<strong>District</strong>Dept. of Enviro andTr3,3 M 3,3 M 0 Sustainable Coastal6,6 MPG 32Environment<strong>District</strong>Dept. of Agric&EnviroIntegrated Coastal PlanTBAPG 33 Environment <strong>District</strong> Dept. A AN Communicable Diseases TBA136 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>8.1.2 HOUSING PROJECTS: UMUZIWABANTUPROJECT NAMENO. OF PROJECT TYPE PROJECT <strong>2011</strong>/12 BUDGET RUNITSSTATUSPG34 MazakheleWinterton Phase 3 1071 Greenfields/slum Activeclearance192 946PG35 IzibondaKwaMachi Rural Housing 1000 Rural Close-out 0PG36 Nhlangwini/Kwafodo Rural Housing 1000 Rural Active 19 150 000PG37 KwaJali Tribal Authority Area Ward 7 & 890 Rural Active 19 500 000Portion of 9PG 38 Bashaweni Rural Housing 1000 Rural Active 1430 000PG 39 KwaDumisa Rural housing 1000 Rural Active 9 789 039PG 40 Harding: Greenfields 338 Rural Close-out 0PG 41 IzibondaKwaMachi Phase 1 Rural housing 1000 Rural Active 0PG 42 KwaMbotho Rural housing 1000 Rural Packaging 700000137 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>138 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER NINE9.1 OVERVIEW OF SPATIAL RATIONALE’Spatial Development FrameworkThe map below indicates the spatial layout of <strong>Umuziwabantu</strong>Local<strong>Municipality</strong> with the intended and potential developments:139 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>140 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>9.1.1 UMUZIWABANTUMUNICIPALITY SPATIAL DEVELOPMENT FRAMEWORK REVIEW09/10 SUMMARY1. INTRODUCTIONThe Spatial Development Framework (SDF) is an integral part of a <strong>Municipality</strong>’s <strong>IDP</strong>(Chapter 5 of the Municipal Systems Act 32, 0f 2000) and should reflect the culmination ofthe other elements of the <strong>IDP</strong>, guided by those development informants, strategies anddevelopment actions, which have a spatial implication. Based on the developmentstrategies identified in the <strong>Umuziwabantu</strong><strong>Municipality</strong>’s <strong>IDP</strong>, the Spatial DevelopmentFramework has taken into account the subsequent critical areas to be developed spatially.• Agricultural Development in the form of :a) enhancing commercial agriculture and promotion of subsistencefarming by providing access to land (StateOwnedLand leaseextension and Land reform) andb) promotion of cooperatives (Training and Mentoring).• Environmental Management or promotion of sustainable tourism and Agriculture;and• Nodal Economic Development.1.1 AIMS OF THE UMUZIWABANTU SPATIAL DEVELOPMENT FRAMEWORKAmongst others the aims of this SDF are:• To promote sustainable functional and integrated settlement patterns• To maximise resources efficiency;• To enhance regional identity and unique character of place.• To ensure conformance with the neighbouring local, district’s and provincial spatialdevelopment frameworks.141 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>2. THE LINK BETWEEN SPATIAL PLANNING AND LAND USE MANAGEMENTIt is important to note that the <strong>IDP</strong>’s Spatial Development Framework is intended to formthe basis for the Land Use Management System for the municipal area, Land UseManagement System referring in this instance to i) the control of development and ii) thefacilitation of development. These two aspects place different requirements on the SpatialDevelopment Framework-on the one hand it must be detailed enough to guide theimplementation of land use rights (by means of Planning Schemes), while on the otherhand it must identify measures to stimulate development.3. UMUZIWABANTU SPATIAL DEVELOPMENT FRAMEWORK3.1 The Development Informant MapsThe development informant maps are a series of maps, which indicates the spatial trendsand diverse issues of the municipality. The following list of maps has been prepared toform the base for this SDF review.Map 1: Landscapes – Topography in relation to IndigenousForests, Rivers and RoadsMap 2:Significant Landscapes and BiodiversityMap 3:Agricultural PotentialMap 4:Land CoverMap 5: Social InfrastructureMap 6: Land Use Management Enabling FrameworkMap 7:<strong>Umuziwabantu</strong> SDF 2001Based on this set of maps, the following key broad spatial trends and issues have beenidentified.142 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>3.2 Movement CorridorsThe Movement Corridors linking the primary nodes, secondary nodes, and rural servicenodes were proposed as follows:• Primary Corridor:• Secondary Corridor:• Tertiary Corridors:a) Primary CorridorsThe primary movement corridor at <strong>Umuziwabantu</strong> is the N2 which connects thismunicipality with Port Shepstone to the east and Kokstad to the west which are theeconomic hubs in the region.b) Secondary CorridorsP59 is a secondary corridor and also provides linkages to Bizana town. P417 is alsoa secondary corridor connecting Harding to Umzimkhulu<strong>Municipality</strong> where thecommunity of Gugwini enjoys a short cut to Harding. P61 which is a loop roadfrom the N2 linking Kwezi and Weza are secondary corridors and mainly serve aspublic transport routes and economic routes for timber. P238 linking with theHarding/ Bizana road (P59) from Kwezi is also a secondary corridor identified.These routes are important linkages with the surrounding municipalities andregular maintenance of these roads and widening is essential as they are used aspublic transport corridors.c) Tertiary CorridorsD250 (to KwaFodo Road), D165 (Kwambotho Road), P 327 (Seaview Road), P 58(KwaMachi Road) are tertiary corridors that provide vital linkages to service satellites inthe municipality and ensure connectivity with service delivery at Rural Service Nodesidentified.143 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>3.3 NodesThe Settlement Hierarchy proposed for the municipal area is as follows:• Primary Node - Administrative and Economic Centre• Secondary Nodes – Distribution Point• Rural Service Nodes - Delivery of Supplementary Services:a) Primary NodeThe primary node for <strong>Umuziwabantu</strong> is Harding since it is the main centre forgovernment offices, trade, manufacturing and employment opportunities. Therefore, itis paramount that Harding be supported and strengthened to ensure its sustainabilityover the long term, thereby protecting the investment that supports the wholemunicipal area. Different kind of land uses encompassing various kinds of trade, socialservices, transportation and residential infill should be encouraged at this node.(Source: <strong>Umuziwabantu</strong> Enabling Land Management Framework, 2005)The accessibility of the Harding area must be maximized not only for the land reformbeneficiaries but for all the municipality’s inhabitants since Harding is the main point forboth first order and second order goods within the municipality. Therefore there is anneed for a Master Plan to be developed for the HardingTown.b) Secondary NodeThe secondary node is at KwaMbonwa within the greater Ikwezi area, this area is whererapid densification is taking place. The secondary node is also located at the junction ofP61, the secondary transportation corridor from Weza to the N2 and Harding and theP238 linking with the Harding/ Bizana road (P59).c) Rural Service NodeThe location of these nodes is usually the most accessible location within an acceptablewalking distance of a particular community.Thesewere identified in Salem, Weza,Hlangano, KwaFodo, Bashaweni and KwaMachi.144 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>3.3 LAND USE AND ENVIRONMENTAL MANGEMENTa) Areas of Conservation Significance / Adventure and Eco TourismAreas of Conservation Significance consist of both private and communal land which haveimportant water and nature conservation values, but do not enjoy formal legal protection.These areas contain natural communities of high nature-conservation value, and alsoimportant grazing resources which occupy virtually the entire zone.The intrinsic bio-diversity value of eco-systems and natural habitats on agriculturalfarmlands provide the basis for eco-tourism diversification and sustainable farmingpractices, thus activities need to be carefully planned in order to integrate with theenvironmental attributes and minimize any negative impactsThis area provides and opportunity for :• Recreation,• Conservation of biodiversity• A tourism attraction node (at Ingeli forests with the trails as the attraction).b) Commercial Agriculture and Eco TourismWell managed agriculture occurs almost throughout the municipality. Future developmentof the municipality should seek to preserve the agricultural land in the area, develop itsspecific potentials and provide for diversification e.g. tourism. In the course of diversifyingto tourism conservation efforts should be applied utilising protection mechanisms such asbio-sphere reserves. Diversification in terms of agricultural production needs to beexplored as the area has potential for wheat, Honeybee production and sugarcane.The major potential within the municipality is timber which covers approximately34000ha in plantations and this need to be preserved in the form of proper environmentalmanagement and disaster management (fire fighting units).c) Substance Agriculture and Eco TourismThis type of farming is a characteristic of the traditional areas. Much of the tribal areasare not cultivated mainly for economic reasons such as deep poverty. The smallsubsistence cultivated plots that are cultivated are often established in unsuitable areas,145 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>the slope is either too steep, the soils are highly eroded or vulnerable seeps or wetlandsare planted up. Subsistence farming within these areas includes livestock raising,Dryland cropping and homestead gardening. Inland, the density of housing is reducedand grazing land is more available for livestock. While livestock keeping is not primarilyfor commercial purposes, livestock do not play a major role in rural communities.There is a need to extend or develop lease agreements with small farmers onstate owned land so they can be productive in order to fight poverty (e.g.Gundriftarea).Cooperatives need to formulated to achieve this and proper training andmentoring need to be undertaken to ensure sustainability of this initiative.d) Land Reform<strong>Umuziwabantu</strong> has 4 prioritised restitution claims that are lodged with the land claimscommission m5 PLRO projects have been transferred.There are no labour tenants’applications.Restitution Claims<strong>Umuziwabantu</strong>Project NameMachi CommunityBombo CommunityMbotho CommunityKwa-FodoProperty DescriptionGundrift, Umtamvuna Drift, WartleRavenhill, Brookside, HawardenKeitdale and Moville FarmsBedford Farm146 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>e) HousingThe following housing projects predominantly consist of insitu upgrading or RuralHousing Projects with the exception of Greenfields projects in Harding and Wintertonareas.Project Name Number of Units StatusHarding Greenfields project 338 CompleteWinterton Harding: Phase 1 900 CompleteIzibondaKwaMachi Rural HousingprojectNhlangwini/ KwaFodo RuralHousing projectKwaJali Tribal Authority Area Ward7 and Portion of 91000 Incomplete1000 Incomplete890 IncompleteKwaDumisa Rural Housing Project 1000 IncompleteKwaMbotho Rural Housing Project 1000 IncompleteMazakheleWinterton Phase 3 1000 IncompleteBashaweni Rural Housing Project 1000 Incomplete4. CONCLUSIONThe <strong>Umuziwabantu</strong> Spatial Development Framework (SDF) provides a broad indication ofwhere different types of development should take place within the municipal area. Assuch it provides general direction to guide decision-making (and thereby contributetowards the creation of integrated and habitable towns and residential areas), aframework for the review of land use management system for the municipal area and aframework for public and private sector investment.147 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>This is a broad desktop SDF review 2010/11 for <strong>Umuziwabantu</strong><strong>Municipality</strong> and in the<strong>2011</strong>/<strong>2012</strong>review, there is a need for a detailed SDF and Strategic EnvironmentalAssessment (SEA) to be prepared which will include:Review and identify the desired Spatial Patterns (Long term vision)Identification of Spatial intervention areas (Short to medium vision)Identification of key strategic intervention areas.Layout Plan for all nodes and urban renewal plans for each node.This will enable the municipality to: Create a more efficient urban form by:- densifiying existing urban nodes in appropriate locations- strengthening secondary service centres- identifying and implementing development corridors promote more flexible land use mix strengthening secondary service centres ensure a more efficient use of infrastructure give preference to those land uses that will assist in achieving the <strong>Municipality</strong>’sVision and particularly the local economic development and environmentalobjectives create an environment conducive to investors and small entrepreneurs optimize the inherent tourism and recreation potential of the area148 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>149 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>150 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>151 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>152 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER TEN10.1 PERFORMANCE MANAGEMENT SYSTEMSPerformance Management is a process which measures the implementation of theorganisation‟s strategy. At Local Government level this has become an imperative,with economic development, transformation, governance, finance and servicedelivery being the critical elements in terms of Local Government Strategy.Performance Management provides the mechanism to measure whether targets tomeet its strategic goals, set by the organisation and its employees, are met. NationalGovernment has also found it necessary to institutionalize and provide legislation onthe Performance Management Process for Local Government.The Municipal Systems Act (MSA), 2000 requires municipalities to establish aperformance management system. Further, the MSA and the Municipal FinanceManagement Act (MFMA) requires the Integrated Development Plan (<strong>IDP</strong>) to bealigned to the municipal budget and to be monitored for the performance of thebudget against the <strong>IDP</strong> via the Service Delivery and the Budget Implementation Plan(SDBIP).In addition, Regulation 7 (1) of the Local Government: Municipal Planning andPerformance Management Regulations, 2001 states that “A <strong>Municipality</strong>‟sPerformance Management System entails a framework that describes and representshow the municipality‟s cycle and processes of performance planning, monitoring,measurement, review, reporting and improvement will be conducted, organised andmanaged, including determining the roles of the different role players.”Performance Management, therefore, is not only relevant to the organisation as awhole, but also to the Individuals employed in the organization as well as theExternal Service Providers and the Municipal Entities. Given this background, it isimportant that a framework for Performance Management be established,153 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>implemented and monitored. This framework therefore describes how themunicipality‟s performance process, for the organisation as a whole will beconducted, organised and managed.How will performance progress be measuredThe Municipal Planning and Performance Management Regulations stipulate that amunicipality‟s Organizational Performance Management System (OPMS) must entaila framework that sets out how the municipality‟s cycle and processes ofperformance planning, monitoring, measurement, review, reporting andimprovement will be conducted, organized and managed, including determining theroles of the different role players.In line with the said legal requirement, this framework should be seen as a policydocument that sets out: The requirements that the <strong>Umuziwabantu</strong> <strong>Municipality</strong>‟s OPMS will need tofulfill; The principles that must inform its development and subsequentimplementation; The preferred performance management model of the municipality; The process by which the system will work; The delegation of responsibilities for different roles in the process; and A plan for the implementation of the systemThe <strong>Municipality</strong> will develop a performance management system which will be usedto monitor and measure progress on municipal performance in terms of servicedelivery as per adopted programmes and projects in the <strong>IDP</strong>. The performancemanagement system will be linked to the Municipal <strong>IDP</strong> and budget to ensure thatwhatever the municipality is doing articulates the municipality‟s vision, objectivesand community aspirations. The performance of the municipality will be reviewedquarterly and corrective measures be implemented where necessary.154 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>Additionally the municipality will ensure that all section 57 employees signperformance contracts aligned to the municipal <strong>IDP</strong> and objectives. The municipalitywill also ensure that employees reporting directly to Head of Departments haveperformance plan to enable a focused performance of the municipality.PMS KEY ELEMENTS PROGRESS AND STATUSELEMENTSPROGRESSOrganisational Performance Management (2008/2009) In place and underSystemreviewSection 57 employees Performance contracts In Place and signed09/10Performance Audit CommitteeIn placeEmployee performance appraisal system 2006 RegulationsAnnual Report 07/082009/2010 draft public commentsreceived waiting adoption by councilQuarterly ReportsConducted on quarterly basesPublic ParticipationConductedCustomer satisfaction surveysNot done155 | P a g e


UMUZIWABANTU REVIEWED INTEGRATED DEVELOPMENT PLAN<strong>2011</strong>/<strong>2012</strong><strong>2011</strong>/<strong>2012</strong>CHAPTER ELEVEN11.1 Annexure 1: Process plan11.2 Annexure 2:<strong>Umuziwabantu</strong> Draft Strategic Environment Assessment11.3 annexure 3: <strong>Umuziwabantu</strong> Infrastructure Master Plan11.4 Annexure 4: <strong>Ugu</strong> <strong>District</strong> <strong>Municipality</strong> SDF11.5 Annexure 5: <strong>Ugu</strong> <strong>District</strong> municipality Disaster Management Plan156 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!