renewable energy in zaanstad: from theory to practice - e-harbours
renewable energy in zaanstad: from theory to practice - e-harbours
renewable energy in zaanstad: from theory to practice - e-harbours
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1. In the first phase the theoretical plans of Zaanstad will be translated <strong>to</strong> practical plans.<br />
Possible locations for the large scale implementation of solar and w<strong>in</strong>d <strong>energy</strong> will be<br />
identified. In this phase different scenarios <strong>in</strong> terms of capacity (solar/w<strong>in</strong>d) will be taken<br />
<strong>in</strong><strong>to</strong> account.<br />
2. In the second phase the distribution network of the identified locations will be reviewed. The<br />
network will be simulated with the power system analysis simulation software DIgSILENT<br />
PowerFac<strong>to</strong>ry. After that the problems and bottlenecks <strong>in</strong> terms of power quality will be<br />
identified.<br />
3. The third phase exists of review<strong>in</strong>g and <strong>in</strong>vestigat<strong>in</strong>g the potential problems which have been<br />
identified <strong>in</strong> phase two. Solutions for these problems will be proposed. In this phase the<br />
potential rollout of a Smart Grid <strong>in</strong> Zaanstads municipality will be <strong>in</strong>vestigated. In these<br />
<strong>in</strong>vestigations both technical and f<strong>in</strong>ancial aspects will be taken <strong>in</strong><strong>to</strong> account.<br />
4. In the last phase the results of the research will be analyzed and described <strong>in</strong> the form of a<br />
report. Conclusions will be drawn and recommendations will be given <strong>to</strong> Zaanstad.<br />
For the graduation project the follow<strong>in</strong>g plann<strong>in</strong>g has been made:<br />
6.4 ORGANIZATION<br />
Figure 19. Plann<strong>in</strong>g of the graduation project<br />
The student will carry out an eight month dur<strong>in</strong>g research project – <strong>from</strong> May 2012 until December<br />
2012 – for the municipality of Zaanstad. The student will be located at the consultancy company<br />
Resourcefully <strong>in</strong> Amsterdam, which is hired by Zaanstad. Another important organization is the<br />
project is the owner of the distribution network Alliander, which will be the supplier of <strong>in</strong>formation<br />
about the distribution network. Below the personal <strong>in</strong>formation of the student is shown.<br />
Furthermore the contact <strong>in</strong>formation of the other organizations is shown.<br />
Name Michel Verburg<br />
Organization E<strong>in</strong>dhoven University of Technology<br />
Student number 0728060<br />
Education Susta<strong>in</strong>able Energy Technology (Master)<br />
Faculty Electrical Eng<strong>in</strong>eer<strong>in</strong>g<br />
32