03.12.2012 Views

renewable energy in zaanstad: from theory to practice - e-harbours

renewable energy in zaanstad: from theory to practice - e-harbours

renewable energy in zaanstad: from theory to practice - e-harbours

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. In the first phase the theoretical plans of Zaanstad will be translated <strong>to</strong> practical plans.<br />

Possible locations for the large scale implementation of solar and w<strong>in</strong>d <strong>energy</strong> will be<br />

identified. In this phase different scenarios <strong>in</strong> terms of capacity (solar/w<strong>in</strong>d) will be taken<br />

<strong>in</strong><strong>to</strong> account.<br />

2. In the second phase the distribution network of the identified locations will be reviewed. The<br />

network will be simulated with the power system analysis simulation software DIgSILENT<br />

PowerFac<strong>to</strong>ry. After that the problems and bottlenecks <strong>in</strong> terms of power quality will be<br />

identified.<br />

3. The third phase exists of review<strong>in</strong>g and <strong>in</strong>vestigat<strong>in</strong>g the potential problems which have been<br />

identified <strong>in</strong> phase two. Solutions for these problems will be proposed. In this phase the<br />

potential rollout of a Smart Grid <strong>in</strong> Zaanstads municipality will be <strong>in</strong>vestigated. In these<br />

<strong>in</strong>vestigations both technical and f<strong>in</strong>ancial aspects will be taken <strong>in</strong><strong>to</strong> account.<br />

4. In the last phase the results of the research will be analyzed and described <strong>in</strong> the form of a<br />

report. Conclusions will be drawn and recommendations will be given <strong>to</strong> Zaanstad.<br />

For the graduation project the follow<strong>in</strong>g plann<strong>in</strong>g has been made:<br />

6.4 ORGANIZATION<br />

Figure 19. Plann<strong>in</strong>g of the graduation project<br />

The student will carry out an eight month dur<strong>in</strong>g research project – <strong>from</strong> May 2012 until December<br />

2012 – for the municipality of Zaanstad. The student will be located at the consultancy company<br />

Resourcefully <strong>in</strong> Amsterdam, which is hired by Zaanstad. Another important organization is the<br />

project is the owner of the distribution network Alliander, which will be the supplier of <strong>in</strong>formation<br />

about the distribution network. Below the personal <strong>in</strong>formation of the student is shown.<br />

Furthermore the contact <strong>in</strong>formation of the other organizations is shown.<br />

Name Michel Verburg<br />

Organization E<strong>in</strong>dhoven University of Technology<br />

Student number 0728060<br />

Education Susta<strong>in</strong>able Energy Technology (Master)<br />

Faculty Electrical Eng<strong>in</strong>eer<strong>in</strong>g<br />

32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!