13.07.2015 Views

Owner's Guide to Project Delivery Methods - CMAA

Owner's Guide to Project Delivery Methods - CMAA

Owner's Guide to Project Delivery Methods - CMAA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PrefaceThis document is an introduc<strong>to</strong>ry guide for owners who face the choice of delivery methods fortheir projects, and for the construction and program managers whose role it is <strong>to</strong> advise ownersand <strong>to</strong> manage the design and construction process utilizing the most appropriate method.While not intended <strong>to</strong> be an exhaustive analysis of each delivery method, this guide provides acomparison among the various available methods, an outline of the pros and cons of each, and anoverview of the role of a program manager or agency construction manager in each deliverymethod.There are many delivery methods in use <strong>to</strong>day, but virtually all of them are variations of the fourmost common methods that are the subject of this document. Closely related <strong>to</strong> project deliverymethods are procurement strategies, contractual arrangements, and compensation methods.While not the focus of this document, there is a brief discussion that <strong>to</strong>uches on how thesecontract strategies align with the various delivery methods.<strong>Project</strong> delivery methods will continue <strong>to</strong> evolve. This guide is thus a reflection of <strong>to</strong>day’sconstruction market, and will be periodically updated <strong>to</strong> reflect future developments. Thecharacteristics of each delivery method are objectively presented in keeping with <strong>CMAA</strong>’s policy ofremaining delivery method neutral.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!