13.07.2015 Views

ISO/RTO Council Comments on ERO NOPR - IESO

ISO/RTO Council Comments on ERO NOPR - IESO

ISO/RTO Council Comments on ERO NOPR - IESO

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

200510075145 Received FERC OSEC 10/07/2005 03:11:00 PM Docket# RM05-30-000comprise less than an entire interc<strong>on</strong>necti<strong>on</strong>. Moreover, the statute does not require theCommissi<strong>on</strong>, in its review of a reliability standard, to afford either the <strong>ERO</strong> or a regi<strong>on</strong>alentity formed <strong>on</strong> an interc<strong>on</strong>necti<strong>on</strong>-wide basis the benefit of any presumpti<strong>on</strong> that aproposed reliability standard meets the statutory standards.The Commissi<strong>on</strong> must be careful that its implementati<strong>on</strong> of these provisi<strong>on</strong>spromotes str<strong>on</strong>g and clear reliability standards for the North American power grid, anddoes not lead to balkanizati<strong>on</strong> of that grid <strong>on</strong> reliability matters. The <strong>ERO</strong>’s clearc<strong>on</strong>tinent-wide reliability standards should be both str<strong>on</strong>g and broad—designed in thefirst place with awareness of such regi<strong>on</strong>al implementati<strong>on</strong> issues as local gridtopography and reliance <strong>on</strong> organized markets. Regi<strong>on</strong>al variances in standards can thenbe targeted to legitimate regi<strong>on</strong>al needs, leaving any further regi<strong>on</strong>al or local c<strong>on</strong>cerns tobe addressed through implementati<strong>on</strong>, and thus not end up swallowing C<strong>on</strong>gress’ overallintent that there be a single internati<strong>on</strong>al electric reliability organizati<strong>on</strong> promulgatingreliability standards. Neither the Commissi<strong>on</strong> nor the <strong>ERO</strong> should “over-read” therebuttable presumpti<strong>on</strong> language (which is <strong>on</strong>ly an evidentiary procedure) as carteblanche for creating a vastly different system of standards development and regulatoryoversight between the western and eastern interc<strong>on</strong>necti<strong>on</strong>s. The Commissi<strong>on</strong> alsoshould make clear that it will respect the technical expertise of a regi<strong>on</strong>al entity organized<strong>on</strong> less than an interc<strong>on</strong>necti<strong>on</strong>-wide basis 6 and the fact that some such regi<strong>on</strong>s may needto have more stringent reliability rules.6The existing regi<strong>on</strong>al reliability councils, whether or not formed <strong>on</strong> aninterc<strong>on</strong>necti<strong>on</strong>-wide basis, have c<strong>on</strong>siderable expertise in the specificcharacteristics of the porti<strong>on</strong>s of the bulk power system in their regi<strong>on</strong>s; and withcoordinating how operati<strong>on</strong>s in their regi<strong>on</strong> impact other operators in such regi<strong>on</strong>,or impact other regi<strong>on</strong>s in the relevant interc<strong>on</strong>necti<strong>on</strong>. For example, the existing8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!