13.07.2015 Views

View - Singapore Technologies Engineering

View - Singapore Technologies Engineering

View - Singapore Technologies Engineering

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SINGAPORE TECHNOLOGIES ENGINEERING LTD Annual Report 201145The Group is involved in a number of projects in Tianjin Eco-City.its long-standing collaboration withbus OEMs to provide electric andhybrid electric buses in GuangzhouKnowledge City, Qingdao and TianjinEco-City. Our other sectors have beenactive in Tianjin as well. On 8 July,ST Electronics was awarded a contractby Sino-<strong>Singapore</strong> Tianjin Eco-CityInvestment & Development Co., Ltdto supply an integrated renewableenergy system for Tianjin GEMS WorldAcademy. The company will implementsolar heating and geothermal energywhich will provide heating, while miniwind turbines and solar photovoltaicpanels will generate electricity withinthe school. In addition, the energymanagement system and interactiveenergy wall display designed byST Electronics will integrate therenewable energy harvested andeducate students about energyconservation.At the same time, we signed an MOUto participate in the Low Carbon LivingLab (LCLL) within the Eco-BusinessPark in Tianjin. This building will be aplatinum-rated office building underthe Tianjin Eco-City’s Green BuildingEvaluation Standards. The first of itskind, the LCLL is positioned as a ‘LivingLab’ test-bed and to demonstrategreen building features and buildingtechnologies in energy saving, carbonfootprint reduction and other areas.Completion is expected to be in 2013.In June, ST Marine’s environmentalengineering arm, STSE, set up abranch office in Tianjin to executeand manage the RMB113m contractsigned in September 2010 for theprovision of a proprietary loop-basedPneumatic Waste Collection Systemto collect recyclables, non-recyclablesand food waste in Tianjin Eco-City’sEco-Business Park. The team hascompleted laying the piping system.STSE has also been busy with projectssecured elsewhere in the region overthe last four years. These includeinstallation and testing of the equipmentfor the Waste Transfer Station inDonghu Newtech Zone in China’sWuhan, Hubei, and partial operationof the Integrated Waste ManagementFacility in Sungai Paku, Brunei. Whencompleted in 2012, the 110-hectareEngineered Landfill at Sungai Paku willbe one of the largest in Asia.ST Electronics, together withAccenture, is in the process ofdelivering Phase 1 of the IntelligentEnergy System (IES) pilot project forthe Energy Market Authority (EMA).This pilot will be conducted intwo phases. Phase 1 will focuson implementing the enablinginfrastructure for the IES. Theseinclude key infrastructure components;advanced metering infrastructure(commonly referred to as smart meters)and its communication system. Thisintegrated smart grid will provideconsumers with more information,choice and control over their electricityusage, thereby improving energyefficiency for <strong>Singapore</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!