13.07.2015 Views

Bouml reference manual - Fedora Project Packages GIT repositories

Bouml reference manual - Fedora Project Packages GIT repositories

Bouml reference manual - Fedora Project Packages GIT repositories

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

file:///C:/uml/BOUML/bouml_3.0/doc/TOUT.html151 of 378 07/10/2007 15:55Note : the activity sub elements are forced to be inside their activity rectangle,. So, when you want to draw in a diagram both an activityand some of its elements I strongly recommend to add firstthe activity then the elements, else when you add the activity the elements may be moved to be inside the rectangle broking theirrespective positions.A right mouse click on a activity in a diagram calls the following menu (supposing the activity editable) :Menu : edit drawing settingsThese drawing settings concerns only the picture for which the menu is called.A settings valuing defaultindicates that the setting specified in the upper level (here the diagram) must be followed, obviously this one may also be default ... up tothe project level. When you add a activity in a diagram, all the settings are set to default.show conditions :Allows to show or not the activity's pre and post conditionsdepending on the drawing language. Note : on an upper level, for instance at the diagram level, this drawing follow the value of thedrawing show info notes. In the diagram above show conditions is true, if false the drawing become :drawing language :Allows to specify the used language in case the activity's pre and post conditions are shown.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!