13.07.2015 Views

South Australian Mallee Fowl Survey Final Report 2011_12.pdf

South Australian Mallee Fowl Survey Final Report 2011_12.pdf

South Australian Mallee Fowl Survey Final Report 2011_12.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>2011</strong>/2012 <strong>Mallee</strong>fowl Monitoring in the SAMDB <strong>Final</strong> <strong>Report</strong>2.13 Murray Bridge army training range (MBAR) (s69) gridThe MBAR grid was surveyed on 2 November <strong>2011</strong> by Kevin Burrett, Michael Weinel, BillBoulton and RLB Ecology.A total of 42 mounds were surveyed and 8 of these mounds were active. This is the best resultever recorded for this grid. Six active mounds were recorded last season. The remaining 7mounds on this grid are not due for monitoring again until 2015._____________________________________________________________________________________________________<strong>Mallee</strong> Eco Services (March 2012) 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!