<strong>Projects</strong> <strong>for</strong>Cleaner Production<strong>in</strong> <strong>Belarus</strong>Cleaner Production FacilityNordic Environment F<strong>in</strong>ance Corporation<strong>Peter</strong> Henn<strong>in</strong>gsen, April 2011


Contents1. NEFCO Cleaner Production Facility• Background• Distribution by sector & country• Criteria <strong>for</strong> f<strong>in</strong>ance• Typical projects• Terms and conditions• Project Cycle – apply<strong>in</strong>g <strong>for</strong>fund<strong>in</strong>g step-by-step2. <strong>Projects</strong> <strong>in</strong> Cleaner Production3. Q&A


NEFCO CP Facility - background• The Cleaner Production Facility was created <strong>in</strong> 1996 as part ofNEFCO's NMF (Nordic Environmental Development Fund) withfunds amount<strong>in</strong>g to EUR 60 million• The CP is a revolv<strong>in</strong>g credit facility <strong>in</strong>tended to promotetechnological <strong>in</strong>vestments <strong>in</strong> <strong>in</strong>dustrial projects by, simultaneously:1. Reduc<strong>in</strong>g emissions of harmful substances <strong>in</strong>to theenvironment, and2. Increas<strong>in</strong>g <strong>production</strong> profitability through efficient resourceand energy utilization• Supports the realization of projects that otherwise would notmaterialize or could be realized only later• Complements and supplements other f<strong>in</strong>anc<strong>in</strong>g organizations, bothbilateral and <strong>in</strong>ternational• 75 projects have been implemented, and another 37 new projects <strong>in</strong>the pipel<strong>in</strong>e <strong>for</strong> NEFCO's considerationProduction of light bulbs <strong>in</strong> Lviv, Ukra<strong>in</strong>e<strong>Peter</strong> Henn<strong>in</strong>gsen, April 2011


Distribution by sector & country - 2009NMF - Nordic Environmental Development Fund, <strong>in</strong>cl. Cleaner Production and Energy Efficiency Credits<strong>Peter</strong> Henn<strong>in</strong>gsen, April 2011


Critera <strong>for</strong> f<strong>in</strong>anc<strong>in</strong>g a CP project• <strong>Projects</strong> must be implemented with<strong>in</strong> NEFCO's geographic mandate,which today <strong>in</strong>clude:– <strong>Belarus</strong>, Russia and Ukra<strong>in</strong>e• Economically viable based on best available, tested environmentaltechnology• <strong>Projects</strong> must deliver measurable reductions of harmful emissions ordischarges, with goals like:– Reduced emissions to the atmosphere– Less water pollutants– Reduced contam<strong>in</strong>ation of soil– Sav<strong>in</strong>g raw material– Less hazardous waste– Less energy used<strong>Peter</strong> Henn<strong>in</strong>gsen, April 2011


Typical CP projects• Modernisation of <strong>in</strong>dustrial <strong>production</strong> processes– Installation of new and more efficient equipment, e.g.heat<strong>in</strong>g boilers, pumps– Installation of regulation and monitor<strong>in</strong>g equipment• Environmental services; waste management and watertreatment– Recirculation and reuse of water• Renewable energy <strong>in</strong>vestments and energy efficiency– biomass, w<strong>in</strong>d energy, geothermal, small scale hydros• Management of manure at animal farms• Transfer of environmental technology, which reducereleases of harmful substancesNew water heaters


Terms and conditions• For private or municipal company with exist<strong>in</strong>g <strong>production</strong>• Maximum loan amount EUR 350,000– NEFCO can f<strong>in</strong>ance up to 90% of total project cost– Loan paid <strong>in</strong> three tranches• Payback period up to 4 years• Fixed <strong>in</strong>terest rate of 6% (EURO) per annum• Security required: 125% of the loan amount– Guarantee (e.g. bank, parent company, municipal); Pledge <strong>in</strong> equipment• Repayment start<strong>in</strong>g after project completion– Tied to the sav<strong>in</strong>gs generated by the project– Equal quarterly <strong>in</strong>stalments• Standard Loan Agreement documentation• Competitive procurement of goods, works and services f<strong>in</strong>anced shallbe open and fair<strong>Peter</strong> Henn<strong>in</strong>gsen, April 2011


CP Project Cycle1. Project Identification2. Project Proposal (2 pages)3. First Evaluation / Approval <strong>in</strong> pr<strong>in</strong>ciple (2weeks)4. Delivery of Bus<strong>in</strong>ess Plan5. F<strong>in</strong>al Approval by NEFCO's InvestmentCommittee (1-2 months from BP)6. Draft documentation (1-2 months afteracceptance of loan proposal)7. Sign<strong>in</strong>g of Agreement8. Project Implementation – progress reports9. Project Completion<strong>Peter</strong> Henn<strong>in</strong>gsen, April 2011


CLEANER PRODUCTIONCASE STUDIES<strong>Peter</strong> Henn<strong>in</strong>gsen, April 2011


Case 1: Reconstruction of boiler house<strong>in</strong> furniture factory


Case 1: Boiler house <strong>in</strong> furniture factory• Project: a new water heat<strong>in</strong>g biofuel boiler with capacity of2,5MW was <strong>in</strong>stalled, replac<strong>in</strong>g an old <strong>in</strong>effective steam boiler.Heat energy is produced <strong>for</strong> own needs as well as <strong>for</strong>neighbour<strong>in</strong>g companies.• In sum, the new boiler reduced the consumption of:– Energy; Soft water; Wood waste; Gas and Diesel fuel• F<strong>in</strong>anc<strong>in</strong>g plan and profitability– Total <strong>in</strong>vestment 358 500 EUR– NEFCO's loan 322 650 EUR (90%)– Net sav<strong>in</strong>gs 97 000 EUR/Year– Payback 3,7 years


Case 1: boiler house – net sav<strong>in</strong>gsSav<strong>in</strong>g elements(unit)Be<strong>for</strong>eimplementationAfterimplementationSav<strong>in</strong>gAmountsSav<strong>in</strong>gs <strong>in</strong>EUR (€)Water (m3/year) 7 300 3 650 3 650 2 200Natural gas (m3/year) 178 363 0 178 363 34 000Diesel (t/year) 40 27 13 9 750Electricity (MWh/year) 964 530 434 15 080Sawdust (fuel) (m 3 /year) 6788 4885 655 13 600Envrionment fees (€) 4 200 0 4 200O&M (€) 25 043 6 260 18 170Sav<strong>in</strong>gs, total (€) 97 000


Case 2: bakery project, Ukra<strong>in</strong>e<strong>Peter</strong> Henn<strong>in</strong>gsen, April 2011


Case 2: Bakery, Energy Sav<strong>in</strong>g Investments• Project: replacement of bak<strong>in</strong>g ovens– Total <strong>in</strong>vestment 450,000 EUR– NEFCO's loan 350,000 EUR (82%)– Net sav<strong>in</strong>gs 112,000 EUR– Payback 4 years• Three projects f<strong>in</strong>anced by NEFCO with<strong>in</strong> the same company group• Environmental impact PRE-PROJECT AFTER PROJECTCO2 emissions 4,634 t/a 1,006 t/aNOx emissions 4,262 t/a 1,035 t/aElectricity consumption 336 MWh/a 123 MWh/aEnvironmental sav<strong>in</strong>gs of 213 MWh => 4,318 tonnes of CO2 per year<strong>Peter</strong> Henn<strong>in</strong>gsen, April 2011


Cleaner Production Team• Local representative / <strong>in</strong>termediary• Local consultants to follow up project implementation• Local lawyers: Sora<strong>in</strong>en Law Firm• NEFCO team• Investment/Project Manager• Environmental analyst• In-house lawyer


To conclude, CP projects are good <strong>for</strong>bus<strong>in</strong>ess because:• Investments <strong>in</strong> modern technology result <strong>in</strong> moreefficient <strong>production</strong>, better quality, better resourceutilization and less waste• Investments <strong>in</strong> energy sav<strong>in</strong>gs reduces the generaloperat<strong>in</strong>g cost of the bus<strong>in</strong>ess and decreases thepollution caused by the energy supplier• There<strong>for</strong>e, improved modern technology andenergy sav<strong>in</strong>gs result <strong>in</strong> a Cleaner Production thatmakes good bus<strong>in</strong>ess sense!


Thank you!Questions?peter.henn<strong>in</strong>gsen@nefco.fi+358 5 0594 5475For further <strong>in</strong><strong>for</strong>mationwww.nefco.org or www.nefco.org/ru